HUDSON, WI —
OSHA Injury Report: MSP DAK ABC PANELS HUDSON
Injury · Days away from work
At a glance
On , an injury at MSP DAK ABC PANELS HUDSON in HUDSON, WI 54016 resulted in days away from work. Employee was aSSEMBLER in prefabricated Wood Building Manufacturing.
Where did this happen?
- Establishment
- MSP DAK ABC PANELS HUDSON
- Parent company
- US LBM Holdings LLC
- Street
- 576 HERMES RD
- City
- HUDSON
- State
- WI
- ZIP
- 54016
- On-site location
- UNKNOWN
What was the outcome?
- Outcome
- Days away from work (code 2)
- Type
- Injury (code 1)
- Days away from work
- 8
- Days restricted or transferred
- 172
Before the incident
BUILDING
What happened
EE STATES WAS BUILDING A WALL WAS PULLING SLACK OF HOSE UP DURING THIS BUMPED A NAIL GUN WHICH CAUSED NAIL TO BE SHOT INTO R HAND
Injury or illness
UPPER EXTREMITIES THUMB CUT PUNCTURE Injury
Object or substance involved
EE STATES WAS BUILDING A WALL WAS PULLING SLACK OF HOSE UP DURING THIS BUMPED A NAIL GUN WHICH CAUSED NAIL TO BE SHOT INTO R
Summary line
EE STATES WAS BUILDING A WALL WAS PULLING SLACK OF HOSE UP DURING THIS BUMPED A NAIL GUN WHICH CAUSED NAIL TO BE SHOT INTO R HAND
Employee and industry
- Job description
- ASSEMBLER
- SOC code
- 51-2099 — Assemblers and Fabricators, All Other
- NAICS code
- 321992 — Prefabricated Wood Building Manufacturing
- NAICS vintage
- 2022
- Avg employees
- 32
- Total hours worked
- 67134
- EIN
- 920262996
- Establishment ID
- 1491303
- Employer case #
- F8M6021
When (timing detail)
- Date of incident
- Time of incident
- 7:30
- Filing year
- 2025
- Submitted
- 19FEB26:21:17:00
Source
Data from OSHA ITA Form 300/301 electronic submissions, filing year 2025. ITA Case Detail records are establishment-reported submissions, not OSHA inspections — no per-record IMIS deep link exists.