Elizabethtown, KY —
OSHA Injury Report: summit Polymers Inc. Plant 9
Injury · Days away from work
At a glance
On , an injury at summit Polymers Inc. Plant 9 in Elizabethtown, KY 42701 resulted in days away from work. Employee was assembly Operator in television housings, plastics, manufacturing.
Where did this happen?
- Establishment
- summit Polymers Inc. Plant 9
- Parent company
- Summit Polymers Inc.
- Street
- 2201 West Park Road
- City
- Elizabethtown
- State
- KY
- ZIP
- 42701
- On-site location
- Assembly Department
What was the outcome?
- Outcome
- Days away from work (code 2)
- Type
- Injury (code 1)
- Days away from work
- 1
- Days restricted or transferred
- 180
Before the incident
Employee was moving a cart of parts down the aisle to another section on the floor.
What happened
Employee was moving a cart of parts down the aisle when a wheel locked up on cart causing the cart to stop abruptly.
Injury or illness
Lower back strain
Object or substance involved
cart wheel
Summary line
Moving container and wheel locked up stopping abruptly and caused a pulling of muscle in back.
Employee and industry
- Job description
- Assembly Operator
- SOC code
- 51-2099 — Assemblers and Fabricators, All Other
- NAICS code
- 326199 — Television housings, plastics, manufacturing
- NAICS vintage
- 2022
- Avg employees
- 330
- Total hours worked
- 667283
- EIN
- 381990845
- Establishment ID
- 1123908
- Employer case #
- 23-4
When (timing detail)
- Date of incident
- Shift started
- 6:00:00.000
- Time of incident
- 12:00:00.000
- Submitted
- 28FEB24:03:48:00
Source
Data from OSHA ITA Form 300/301 electronic submissions, filing year unspecified. ITA Case Detail records are establishment-reported submissions, not OSHA inspections — no per-record IMIS deep link exists.