HOT SPRINGS, AR —
OSHA Inspection: AMERICAN CEDAR, INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of AMERICAN CEDAR, INC. in INDUSTRIAL PARK DR., HOT SPRINGS, AR 71901 (NAICS 000000). OSHA activity number 103479085.
Where did this inspection happen?
- Establishment
- AMERICAN CEDAR, INC.
- Site address
- INDUSTRIAL PARK DR.
- City
- HOT SPRINGS
- State
- AR
- ZIP
- 71901
- Mailing
- 190 EXTRUSION PLACE, HOT SPRINGS, AR 71901
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2499
- Employees
- 42
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
16 citations on file for this inspection.
1910.147 C01
- Issued
- Abate by
- Penalty
- Initial $120.00 · Current $70.00 Reduced
Recent events (2)
- — I (S) $70.00
- — Z (S) $120.00
1910.213 A09
- Issued
- Abate by
- Penalty
- Initial $240.00 · Current $150.00 Reduced
Recent events (2)
- — I (S) $150.00
- — Z (S) $240.00
1910.213 I01
- Issued
- Abate by
- Penalty
- Initial $120.00 · Current $70.00 Reduced
Recent events (2)
- — I (S) $70.00
- — Z (S) $120.00
1910.213 O04
- Issued
- Abate by
- Penalty
- Initial $120.00 · Current $120.00
Recent events (2)
- — I (S) $120.00
- — Z (S) $120.00
1910.213 P04
- Issued
- Abate by
- Penalty
- Initial $80.00 · Current $45.00 Reduced
Recent events (2)
- — I (S) $45.00
- — Z (S) $80.00
1910.215 A01
- Issued
- Abate by
- Penalty
- Initial $80.00 · Current $45.00 Reduced
Recent events (2)
- — I (S) $45.00
- — Z (S) $80.00
1910.252 A02 IVC
- Issued
- Abate by
- Penalty
- Initial $80.00 · Current $45.00 Reduced
Recent events (2)
- — I (S) $45.00
- — Z (S) $80.00
1910.304 F04
- Issued
- Abate by
- Penalty
- Initial $200.00 · Current $125.00 Reduced
Recent events (2)
- — I (S) $125.00
- — Z (S) $200.00
1910.304 F05 V
- Issued
- Abate by
1910.305 B01
- Issued
- Abate by
- Penalty
- Initial $120.00 · Current $70.00 Reduced
Recent events (2)
- — I (S) $70.00
- — Z (S) $120.00
1910.305 G02 II
- Issued
- Abate by
- Penalty
- Initial $120.00 · Current $70.00 Reduced
Recent events (2)
- — I (S) $70.00
- — Z (S) $120.00
1910.1200 E01
- Issued
- Abate by
- Penalty
- Initial $120.00 · Current $70.00 Reduced
Recent events (2)
- — I (S) $70.00
- — Z (S) $120.00
1910.1200 G08
- Issued
- Abate by
- Penalty
- Initial $120.00 · Current $70.00 Reduced
Recent events (2)
- — I (S) $70.00
- — Z (S) $120.00
1910.1200 H
- Issued
- Abate by
- Penalty
- Initial $120.00 · Current $70.00 Reduced
Recent events (2)
- — I (S) $70.00
- — Z (S) $120.00
1903.2 A01
- Issued
- Abate by
1904.2 A
- Issued
- Abate by
More inspections at AMERICAN CEDAR, INC.
HOT SPRINGS NATIONAL PARK, AR—2002-06-26 00:00:00
AMERICAN CEDAR, INC.
HOT SPRINGS NATIONAL PARK, AR—1996-06-21 00:00:00
AMERICAN CEDAR, INC.
HOT SPRINGS, AR—1993-05-12 00:00:00
AMERICAN CEDAR, INC.
HOT SPRINGS NATIONAL PARK, AR—1989-01-11 00:00:00
AMERICAN CEDAR, INC.
View AMERICAN CEDAR, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in AR
SILOAM SPRINGS, AR—2026-07-15
CR CRAWFORD CONSTRUCTION LLC
VAN BUREN, AR—2026-07-14
MILLAR PARTNERS, LLC
BRINKLEY, AR—2026-07-14
ROGER WILKISON FARMS PARTNERSHIP
SEARCY, AR—2026-07-14
MASTER?S PLASTERING & MORE INC
LITTLE ROCK, AR—2026-07-09
NABHOLZ CONSTRUCTION CORPORATION
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 103479085.