Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: JAY-H FIXTURES INC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JAY-H FIXTURES INC in 305 N. BECKLEY, DE SOTO, TX 75115 (NAICS 000000). OSHA activity number 109096628.

Watch Jay-H Fixtures INC — free Get an email when a new federal OSHA severe-injury report for Jay-H Fixtures INC is published. One employer, no account, unsubscribe in one click.
Establishment
JAY-H FIXTURES INC
Site address
305 N. BECKLEY
City
DE SOTO
State
TX
ZIP
75115
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
2541
Employees
20
Ownership type
A
Industry flags
Manufacturing safety.

11 citations on file for this inspection.

1910.107 C05

Serious Gravity 05 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $525.00 · Current $315.00 Reduced
Recent events (2)
  • — I (S) $315.00
  • — Z (S) $525.00

1910.212 A01

Serious Gravity 03 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $225.00 Reduced
Recent events (2)
  • — I (S) $225.00
  • — Z (S) $375.00

1910.212 A03 II

Serious Gravity 03 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $225.00 Reduced
Recent events (2)
  • — I (S) $225.00
  • — Z (S) $375.00

1910.213 H03

Serious Gravity 01 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $225.00 · Current $135.00 Reduced
Recent events (2)
  • — I (S) $135.00
  • — Z (S) $225.00

1910.213 H04

Serious Gravity 01 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $225.00 · Current $135.00 Reduced
Recent events (2)
  • — I (S) $135.00
  • — Z (S) $225.00

1910.215 A04

Serious Gravity 02 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $300.00 · Current $180.00 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $300.00

1910.215 B09

Serious Gravity 02 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $300.00 · Current $180.00 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $300.00

1910.242 B

Serious Gravity 01 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $225.00 · Current $135.00 Reduced
Recent events (2)
  • — I (S) $135.00
  • — Z (S) $225.00

1910.303 F

Serious Gravity 03 1 instance 20 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $225.00 Reduced
Recent events (2)
  • — I (S) $225.00
  • — Z (S) $375.00

1910.304 F05 V

Serious Gravity 03 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $225.00 Reduced
Recent events (2)
  • — I (S) $225.00
  • — Z (S) $375.00

1910.1200 E01

Other-than-serious Gravity 01 1 instance 20 exposed
Issued
Abate by

View JAY-H FIXTURES INC's full OSHA safety record →

KGC, INC.

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 109096628.