OSHA Inspection: DIVERSIFIED BUILDING SERVICES, INC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of DIVERSIFIED BUILDING SERVICES, INC. in 4501 DIGNAN ST., JACKSONVILLE, FL 32254 (NAICS 000000). OSHA activity number 110138344.

Watch Diversified Building Services, INC. — free Get an email when a new federal OSHA severe-injury report for Diversified Building Services, INC. is published. One employer, no account, unsubscribe in one click.
Site address
4501 DIGNAN ST.
City
JACKSONVILLE
State
FL
ZIP
32254
Mailing
P.O. BOX 1067, BAXLEY, GA 31513
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
1791
Employees
8
Ownership type
A

5 citations on file for this inspection.

1926.20 B02

Serious Gravity 10 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $7000.00 · Current $7000.00

1926.21 B02

Serious Gravity 10 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $7000.00 · Current $7000.00

1926.751 A

Serious Gravity 10 10 instances 5 exposed
Issued
Abate by
Penalty
Initial $7000.00 · Current $7000.00

1926.752 D04

Serious Gravity 10 2 instances 5 exposed
Issued
Abate by
Penalty
Initial $7000.00 · Current $7000.00

5(a)(1)

Willful Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $70000.00 · Current $70000.00
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to being struck by falling structural steel members during a
building collapse:
a.On or about July 14, 1997, Building 221, under construction, did not have
sufficient or adequate temporary and/or permanent bracing on the north and
south
columns, which would have provided lateral stability, preventing the
building
from falling in an east or west direction.
b.On or about July 14, 1997, Building 220, under construction, did not have
temporary or permanent cable bracing on the north and south columns from
expansion joint eight to the east end wall, which would have provided
lateral
stability, preventing the building from falling in an east or west
direction.
Among other methods, one feasible and acceptable abatement method to
correct this hazard is
to ensure conformance to standard industry practice during the erection of
pre-fabricated metal
buildings, specifically during the placement, squaring, plumbing and
securing, by the use of
temporary guys and bracing, of the structural framing.  Protection of
structural members against
loads, such as wind loads acting on the exposed framing and seismic forces
comparable in
intensity to those for which the completed structure is designed, as well
as loads imposed due
to erection equipment and erection operation, is standard industry
practice.  Such standard
industry practice is outlined in Chapter Six, Section 6.2.5 of Metal
Builders Manufacturing
Association's 1996 publication entitled, Low Rise Building Systems Manual,
in Section 11.1 of
American National Standards Institute's Standard for Construction and
Demolition Operations
A10.13 (1989), in Chapter 5-56, Section 1.25 of The American Institute of
Steel Construction's
Steel Construction Manual, and in Section 7 of The American Institute of
Steel
Construction's
Code of Standard Practice.
ABATEMENT CERTIFICATION IS NOT REQUIREDATION

KGC, INC.

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 110138344.