ELMIRA, NY —
OSHA Inspection: MC WANE, INC. DBA KENNEDY VALVE
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of MC WANE, INC. DBA KENNEDY VALVE in 1021 EAST WATER STREET, ELMIRA, NY 14901 (NAICS 000000). OSHA activity number 113937544.
Where did this inspection happen?
- Establishment
- MC WANE, INC. DBA KENNEDY VALVE
- Site address
- 1021 EAST WATER STREET
- City
- ELMIRA
- State
- NY
- ZIP
- 14901
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3321
- Employees
- 280
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
63 citations on file for this inspection.
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $7000.00 · Current $5600.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by the load should the overhead hoist, monorail structure or below-the-hook lifting devices fail: a)ON OR ABOUT 2/7-3/23/95, THE FOLLOWING OVERHEAD HOISTS DID NOT HAVE CLEARLY LABELED PENDANT CONTROLS AND/ OR THE FUNCTIONAL OPERATING MECHANISMS WERE INOPERABLE, OUT OF ADJUSTMENT OR NEEDED REPLACING: 1)FOUNDRY, IRON MELT, MONO-TRACTOR OVERHEAD HOIST WITH LADLES #00, #44, #77 AND #88 - PENDANT CONTROLS WERE NOT CLEARLY LABELED FOR IDENTIFICATION OF FUNCTIONS. 2)FOUNDRY, LADLE REPAIR AREA, OVERHEAD HOIST - PENDANT CONTROLS WERE NOT CLEARLY LABELED FOR IDENTIFICATION OF FUNCTIONS. 3)SHIPPING AREA, SOUTH END, CM LODESTAR ONE-TON OVERHEAD HOIST - UPPER LIMIT DEVICE WAS NOT FUNCTIONING. 4)SMALL VALVE ASSEMBLY, INGERSOLL RAND 1/2-TON OVERHEAD HOIST, BENCH #2 ON FREE-STANDING JIB - BRAKES DID NOT HOLD THE LOAD WHEN THE CONTROLS WERE RELEASED; EMPLOYEES LIFTING 10-INCH 4571 VALVES. 5)ASSEMBLY, BIG FLOOR TEST, INGERSOLL RAND TWO-TON OVERHEAD HOIST - UPPER LIMIT DEVICE WAS NOT FUNCTIONING; EMPLOYEES LIFTING BUTTERFLY VALVES AND CHECK VALVES. 6)HAND HYDRANT ASSEMBLY, SOUTH END, INGERSOLL RAND 1/2TON OVERHEAD HOIST - ONE ROLLER CHAIN LINKAGE WAS WORN CAUSING IT TO SLIP AND AIR CONTROLS FOR "UP" AND "DOWN" WERE REVERSED; EMPLOYEES LIFTING HYDRANT ASSEMBLIES. 7)MACHINE SHOP, BIG FLOOR, 3A SOUTH AT COLUMN 26CC, INGERSOLL RAND 1/2-TON OVERHEAD HOIST - WIRE ROPE WAS SEVERELY KINKED IN TWO AREAS; USED FOR LIFTING ELBOWS AND HYDRANT TOPS. 8)MACHINE SHOP, BIG FLOOR, AT CARLTON DRILL, INGERSOLL RAND 1/2-TON OVERHEAD HOIST - WIRE ROPE WAS SEVERELY KINKED IN ONE AREA. 9)MACHINE SHOP, BIG FLOOR, LARGE NATCO DRILL, SOUTH HOIST, INGERSOLL RAND ONE-TON OVERHEAD HOIST - WIRE ROPE WAS SEVERELY KINKED IN SEVERAL AREAS AND NUMEROUS BROKEN STRANDS. 10)MACHINE SHOP, BIG FLOOR, LARGE NATCO DRILL, NORTH HOIST, INGERSOLL RAND ONE-TON OVERHEAD HOIST - WIRE ROPE WAS SEVERELY KINKED IN THREE AREAS. 11)MACHINE SHOP, BIG FLOOR, LONG BED LATHE, INGERSOLL RAND 1/2-TON OVERHEAD HOIST ON FREE STANDING JIB - WIRE ROPE WAS SEVERELY KINKED IN ONE AREA. 12)MACHINE SHOP, 2A, 1500 SERIES LATHES, NORTH OF FOREMAN'S OFFICE, INGERSOLL RAND 1/2-TON OVERHEAD HOIST - WIRE ROPE WAS SEVERELY KINKED IN TWO AREAS. 13)MACHINE SHOP, NATCO DRILL CELL, BODY AND CAP AISLE, TWO INGERSOLL RAND 1/2-TON OVERHEAD HOISTS - WIRE ROPE ON THE WEST HOIST HAD BEEN CRUSHED IN ONE AREA AND SEVERELY KINKED IN SEVERAL AREAS AND THE EAST HOIST HAD SEVERAL AREAS SEVERELY KINKED AND BIRDCAGED IN ONE AREA. 14)MACHINE SHOP, COLUMN 18B AT WARNER SWASEY 4A TURRET LATHE, INGERSOLL RAND 1/2-TON OVERHEAD HOIST - BRAKES DID NOT HOLD THE LOAD WHEN THE CONTROLS WERE RELEASED. 15)FOUNDRY, CHIPPING ROOM, BOOTHS 1 AND 9, TWO INGERSOLL RAND 1/2-TON OVERHEAD HOISTS - UPPER LIMIT DEVICES WERE NOT FUNCTIONING. 16)FOUNDRY CHIPPING ROOM, ROLL-OFF CONVEYOR BELT LINE FOR CHIPPERS AND GRINDERS, INGERSOLL RAND 1/2-TON OVERHEAD HOIST - BRAKES DID NOT HOLD THE LOAD WHEN THE CONTROLS WERE RELEASED AND THE ROLLER CHAIN WAS SEVERELY TWISTED AT THE THIRD LINKAGE; USED FOR LIFTING 8-INCH AND 10-INCH CAPS. 17)FOUNDRY, CLEANING ROOM BY REWORK DRILL, INGERSOLL RAND 1/2-TON OVERHEAD HOIST - WIRE ROPE HAD SEVERAL BROKEN STRANDS. 18)FOUNDRY, BIG FLOOR, PALMER MIXER AREA, INGERSOLL RAND 1/2-TON OVERHEAD HOIST - WIRE ROPE WAS BIRDCAGED IN ONE AREA. 19)FOUNDRY, PAINT DIP ROOM, FOUR INGERSOLL RAND 1/2-TON OVERHEAD HOISTS, EAST AND SOUTH MIDDLE HOISTS - THE UPPER LIMIT DEVICES WERE NOT FUNCTIONING, AND THE WEST AND NORTH MIDDLE HOISTS, THE BRAKE DID NOT HOLD THE LOAD WHEN THE CONTROLS WERE RELEASED. 20)FOUNDRY, IN-LINER POURING LINE, MONO-TRACTOR OVERHEAD HOIST #88 - WIRE ROPE WAS NOT PROPERLY SEATED ON THE DRUM IN THAT IT WAS WRAPPED UP ON ONE SIDE OF THE DRUM AND THE BRAKES DID NOT HOLD THE LOAD WHEN THE CONTROLS WERE RELEASED BY OPERATOR. 21)FOUNDRY, IN-LINER NORTH OF STATION ON WEST SIDE, INGERSOLL RAND ONE-TON OVERHEAD HOIST - WIRE ROPE WAS SEVERELY KINKED, BIRD CAGING IN TWO AREAS, AND NUMEROUS BROKEN STRANDS. 22)FOUNDRY, BACK OF IN-LINER, MOLD PATTERN CHANGE HOIST, INGERSOLL RAND 1/2-TON OVERHEAD HOIST - WIRE ROPE HAD NUMEROUS BROKEN STRANDS, SEVERELY KINKED IN SEVERAL AREAS AND THE WIRE ROPE WAS NOT PROPERLY SEATED ON THE DRUM IN THAT THE WIRE ROPE WAS OVERLAPPING ON ONE SIDE OF THE DRUM. 23)FOUNDRY, CORE ROOM, CORE MACHINE 10A, INGERSOLL RAND 1/2-TON OVERHEAD HOIST - THE UPPER LIMIT DEVICE WAS NOT FUNCTIONING AND ONE ROLLER LINK CHAIN HAD A BROKEN SIDE PLATE. 24)PATTERN SHOP, WEST STORAGE ROOM, 3-TON OVERHEAD HOIST WIRE ROPE WAS SEVERELY KINKED IN SEVERAL AREAS AND HAD NUMEROUS BROKEN STRANDS. AMONG OTHER METHODS, SEVERAL FEASIBLE AND ACCEPTABLE ABATEMENT METHODS TO CORRECT EACH OF THESE HAZARDS ARE TO: 1.REPAIR/ADJUST THE BRAKING SYSTEM SO THAT IT HOLDS THE LOAD WHEN CONTROLS ARE RELEASED. 2.RELABEL PENDANT CONTROL DEVICES FOR IDENTIFICATION OF FUNCTIONS. 3.REPAIR OR INSTALL UPPER LIMIT DEVICES TO PREVENT HOOK FROM ENTERING DRUM OF HOIST. 4.REPLACE WIRE ROPES WITH DEFECTS SUCH AS BROKEN STRANDS, SEVERE KINKING, BIRDCAGING, CRUSHING, ETC. 5.REPLACE ROLLER CHAINS WITH BROKEN SIDE PLATES, SEVERE TWISTING, AND/OR WORN LINKAGE. 6.REPAIR AND/OR ADJUST HOIST UNIT SO THAT WIRE ROPE SEATS PROPERLY ON THE DRUM. 7.CONDUCT FREQUENT/PERIODIC INSPECTIONS AND PERFORM THE REQUIRED MAINTENANCE FOLLOWING THESE INSPECTIONS IN ACCORDANCE WITH ANSI B30.16,-1987 CHAPTER 16-2. b)ON OR ABOUT 02/07-03/23/95, THE FOLLOWING BELOW-THE-HOOK MAN MADE LIFTING DEVICES HAD NO RATED LOAD MARKINGS, NO OPERATIONAL TEST PERFORMED AND NO INITIAL FREQUENT OR PERIODIC INSPECTIONS PERFORMED INCLUDING, BUT NOT LIMITED TO: 1)SMALL VALVE ASSEMBLY, BELOW-THE-HOOK LIFTING DEVICES FOR LIFTING GATE VALVES AND DETECTOR CHECK VALVES - ONE DEVICE AT #2 HOIST/BENCH; TWO DEVICES AT TEST MACHINE #1; ONE HOOK DEVICE ATTACHED TO A CHAIN ASSEMBLY AT NORTH SIDE OF SMALL VALVE ON SECOND JIB LABELED #1; AND ONE DEVICE AT TEST MACHINE #2. 2)HYDRANT ASSEMBLY AND TEST, BELOW-THE-HOOK LIFTING DEVICES FOR LIFTING HYDRANT ASSEMBLY AT M & H LINE 1, 2 AND 3. 3)MACHINE SHOP, BIG FLOOR, MILES MACHINE #2301 - A BELOWTHE-HOOK LIFTING DEVICE WITH TWO WELDED HOOKS FOR LIFTING BUTTERFLY DISCS. 4)MACHINE SHOP, BIG FLOOR, CINCINNATI THREE-WAY BIG FACER #2128, BELOW-THE-HOOK LIFTING DEVICE WITH 3 WELDED HOOKS. 5)MACHINE SHOP, BIG FLOOR, CINCINNATI T30 MACHINE #2107A, BELOW-THE-HOOK LIFTING DEVICE ON NEW JIB HOIST. 6)MACHINE SHOP, ACROSS FROM COLUMN 24AA, BELOW-THE-HOOK LIFTING DEVICE AT MILLER DRILL. 7)MACHINE SHOP, COLUMN 16B, MARCO FACER CELL, FOUR BELOW-THE-HOOK LIFTING DEVICES. 8)MACHINE SHOP, MARCO FACER CELL AT MACHINE #3193, BELOWTHE-HOOK LIFTING DEVICES FOR LIFTING 4561 UPPER HYDRANT BODIES. 9)MACHINE SHOP, WARNER SWASEY 4A TURRET LATHE MACHINE #2188, BELOW-THE-HOOK LIFTING DEVICE. 10)CORE ROOM, AT PETERLE CORE MACHINE, BELOW-THE-HOOK LIFTING DEVICE. AMONG OTHER METHODS, SEVERAL FEASIBLE AND ACCEPTABLE ABATEMENT METHODS TO CORRECT THESE HAZARDS ARE TO: 1.PRIOR TO INITIAL USE, ALL NEW, ALTERED, MODIFIED OR REPAIRED LIFTING DEVICES SHALL BE INSPECTED BY A DESIGNATED PERSON AND AN OPERATIONAL TEST PERFORMED TO VERIFY COMPLIANCE. 2.MARK THE RATED LOAD OF THE LIFTING DEVICE ON THE MAIN STRUCTURE WHERE IT IS VISIBLE. 3.AFFIX A NAMEPLATE OR OTHER PERMANENT MARKING DISPLAYING THE FOLLOWING INFORMATION: MANUFACTURER'S NAME AND ADDRESS, SERIAL NUMBER, LIFTER WEIGHT IF OVER 100-POUNDS, AND RATED LOAD. 4.CONDUCT FREQUENT AND PERIODIC INSPECTIONS OF THE LIFTING DEVICES FOR WEAR, DETERIORATION OR MALFUNCTION. c)ON OR ABOUT 02/07-03/23/95, THE FOLLOWING JIB/MONORAIL STRUCTURES HAD NOT BEEN RE-RATED AFTER MODIFICATIONS, NOT WITHIN LEVEL TOLERANCES, AND/OR NOT SECURELY FASTENED INCLUDING, BUT NOT LIMITED TO: 1)SMALL VALVE ASSEMBLY, TEST MACHINE #1 - OVERHEAD HOIST ON FREE-STANDING JIB STRUCTURE, HOIST AND JIB SWINGS SIDE TO SIDE WHEN RELEASED BY OPERATOR.2)SMALL VALVE ASSEMBLY, THREE STATION ASSEMBLY TEST, NORTH END, 1/2-TON OVERHEAD HOIST USED ON MONORAIL STRUCTURE - THREE AREAS OF THE BRIDGE AND MONORAIL SYSTEM HAD WELDED EXTENSIONS. THERE WAS NO WRITTEN DOCUMENTATION OF THE RE-RATING OF THE SYSTEM AND THE TESTS PERFORMED CONFIRMING THE LOAD RATING OF THE SYSTEM. EMPLOYEES LIFTING 8-INCH VALVES. 3)MACHINE SHOP, M & H WEST, NORTH INGERSOLL RAND 1/2-TON OVERHEAD HOIST ON COLUMN MOUNTED JIB - JIB AND HOIST SWINGS SIDE TO SIDE WHEN RELEASED BY OPERATOR. 4)MACHINE SHOP, MAKINO MACHINING CELL, JIB ATTACHED TO STEEL COLUMN WITH 1/2-TON INGERSOLL RAND OVERHEAD HOIST MOUNTED - JIB NOT PROPERLY MOUNTED IN THAT WHEN JIB IS MOVED, THERE IS MOVEMENT IN THE STEEL COLUMN. 5)MACHINE SHOP, BIG FLOOR, AT FOSDICK DRILL, 1/2-TON OVERHEAD HOIST ON WALL-MOUNTED JIB - JIB AND HOIST SWINGS SIDE TO SIDE WHEN RELEASED BY OPERATOR. 6)MACHINE SHOP, COLUMN 18b AT WARNER SWASEY 4A TURRET LATHE, INGERSOLL RAND 1/2 TON OVERHEAD HOIST ON COLUMNMOUNTED JIB - JIB AND HOIST SWINGS UNDER LOAD. AMONG OTHER METHODS, SEVERAL FEASIBLE AND ACCEPTABLE ABATEMENT METHODS TO CORRECT THESE HAZARDS ARE TO: 1.PRIOR TO INITIAL USE, ALL NEW EXTENSIVELY REPAIRED AND ALTERED EQUIPMENT SHALL BE TESTED BY OR UNDER THE DIRECTION OF AN APPOINTED PERSON AND A WRITTEN REPORT FURNISHED BY SUCH PERSON CONFIRMING THE LOAD RATING OF THE SYSTEM. 2.AFTER MODIFICATIONS ARE MADE, ALL BUILDING AND OTHER SUPPORT STRUCTURES SHALL BE THOROUGHLY CHECKED BY A QUALIFIED ENGINEER PRIOR TO RETESTING AND MARKING. 3.ADJUST/REPAIR JIB STRUCTURE WITHIN LEVEL TOLERANCES TO PREVENT THEM FROM SWINGING BACK AND FORTH WHEN RELEASED BY THE OPERATOR. 4.SECURELY FASTEN THE JIB TO AN ADEQUATE SUPPORTING STRUCTURE.
Recent events (2)
- — J (S) $5600.00
- — Z (S) $7000.00
1910.27 F
- Issued
- Abate by
- Penalty
- Initial $1500.00 · Current $1200.00 Reduced
Recent events (2)
- — J (S) $1200.00
- — Z (S) $1500.00
1910.101 B
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $2000.00 Reduced
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2500.00
1910.253 B02 II
- Issued
- Abate by
Recent events (2)
- — J (S)
- — Z (S)
1910.106 E02 IVA
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $4000.00 Reduced
Recent events (2)
- — J (S) $4000.00
- — Z (S) $5000.00
1910.106 E06 I
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $4000.00 Reduced
Recent events (2)
- — J (S) $4000.00
- — Z (S) $5000.00
1910.106 E09 I
- Issued
- Abate by
- Penalty
- Initial $1500.00 · Current $1200.00 Reduced
Recent events (2)
- — J (S) $1200.00
- — Z (S) $1500.00
1910.107 B05 IV
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $2000.00 Reduced
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2500.00
1910.107 B10
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $2000.00 Reduced
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2500.00
1910.110 E04 III
- Issued
- Abate by
- Penalty
- Initial $2500.00
Recent events (2)
- — J (O)
- — Z (S) $2500.00
1910.147 C04 II
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $4000.00 Reduced
Recent events (2)
- — J (S) $4000.00
- — Z (S) $5000.00
1910.147 C06 I
- Issued
- Abate by
Recent events (2)
- — J (S)
- — Z (S)
1910.147 C05 I
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $4000.00 Reduced
Recent events (2)
- — J (S) $4000.00
- — Z (S) $5000.00
1910.157 C04
- Issued
- Abate by
- Penalty
- Initial $1500.00 · Current $1200.00 Reduced
Recent events (2)
- — J (S) $1200.00
- — Z (S) $1500.00
1910.157 E03
- Issued
- Abate by
Recent events (2)
- — J (S)
- — Z (S)
1910.160 B06
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $2000.00 Reduced
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2500.00
1910.184 C02
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $2000.00 Reduced
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2500.00
1910.184 E09 I
- Issued
- Abate by
Recent events (2)
- — J (S)
- — Z (S)
1910.184 I09 III
- Issued
- Abate by
Recent events (2)
- — J (S)
- — Z (S)
1910.212 A02
- Issued
- Abate by
- Penalty
- Initial $3500.00 · Current $2800.00 Reduced
Recent events (2)
- — J (S) $2800.00
- — Z (S) $3500.00
1910.212 A05
- Issued
- Abate by
- Penalty
- Initial $1500.00 · Current $1200.00 Reduced
Recent events (2)
- — J (S) $1200.00
- — Z (S) $1500.00
1910.213 D01
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $4000.00 Reduced
Recent events (2)
- — J (S) $4000.00
- — Z (S) $5000.00
1910.217 B04 I
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $2000.00 Reduced
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2500.00
1910.217 C01 I
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $2000.00 Reduced
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2500.00
1910.217 E01 I
- Issued
- Abate by
Recent events (2)
- — J (S)
- — Z (S)
1910.304 F04
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $2000.00 Reduced
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2500.00
1910.305 A01 I
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $4000.00 Reduced
Recent events (2)
- — J (S) $4000.00
- — Z (S) $5000.00
1910.305 B01
- Issued
- Abate by
Recent events (2)
- — J (S)
- — Z (S)
1910.305 B02
- Issued
- Abate by
- Penalty
- Initial $2500.00 · Current $2000.00 Reduced
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2500.00
1910.333 A
- Issued
- Abate by
- Penalty
- Initial $5000.00 · Current $4000.00 Reduced
Recent events (2)
- — J (S) $4000.00
- — Z (S) $5000.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $55000.00 · Current $44000.00 Reduced
Recent events (2)
- — J (U) $44000.00
- — Z (W) $55000.00
5(a)(1)
- Issued
- Abate by
Recent events (2)
- — J (U)
- — Z (W)
1910.22 A01
- Issued
- Abate by
- Penalty
- Initial $500.00
Recent events (2)
- — J (O)
- — Z (R) $500.00
1910.22 A02
- Issued
- Abate by
Recent events (2)
- — J (O)
- — Z (R)
1910.22 B01
- Issued
- Abate by
- Penalty
- Initial $200.00
Recent events (2)
- — J (O)
- — Z (R) $200.00
1910.22 C
- Issued
- Abate by
- Penalty
- Initial $3000.00
Recent events (2)
- — J (O)
- — Z (R) $3000.00
1910.23 C01
- Issued
- Abate by
- Penalty
- Initial $12500.00 · Current $6875.00 Reduced
Recent events (2)
- — J (R) $6875.00
- — Z (R) $12500.00
1910.25 D01 X
- Issued
- Abate by
- Penalty
- Initial $200.00
Recent events (2)
- — J (R)
- — Z (R) $200.00
1910.27 D03
- Issued
- Abate by
- Penalty
- Initial $7500.00 · Current $4125.00 Reduced
Recent events (2)
- — J (R) $4125.00
- — Z (R) $7500.00
1910.107 E09
- Issued
- Abate by
- Penalty
- Initial $7500.00 · Current $4125.00 Reduced
Recent events (2)
- — J (R) $4125.00
- — Z (R) $7500.00
1910.107 G02
- Issued
- Abate by
- Penalty
- Initial $7500.00 · Current $4125.00 Reduced
Recent events (2)
- — J (R) $4125.00
- — Z (R) $7500.00
1910.147 C07 I
- Issued
- Abate by
- Penalty
- Initial $25000.00 · Current $13750.00 Reduced
Recent events (2)
- — J (R) $13750.00
- — Z (R) $25000.00
1910.178 P01
- Issued
- Abate by
- Penalty
- Initial $7500.00 · Current $4125.00 Reduced
Recent events (2)
- — J (R) $4125.00
- — Z (R) $7500.00
1910.179 L03 II
- Issued
- Abate by
- Penalty
- Initial $25000.00 · Current $13750.00 Reduced
Recent events (2)
- — J (R) $13750.00
- — Z (R) $25000.00
1910.184 E01
- Issued
- Abate by
- Penalty
- Initial $200.00
Recent events (2)
- — J (O)
- — Z (R) $200.00
1910.212 A01
- Issued
- Abate by
- Penalty
- Initial $25000.00 · Current $13750.00 Reduced
Recent events (4)
- — J $2000.00
- — Z $37500.00
- — J (R) $13750.00
1910.215 B09
- Issued
- Abate by
- Penalty
- Initial $3000.00 · Current $1650.00 Reduced
Recent events (2)
- — J (R) $1650.00
- — Z (R) $3000.00
1910.219 D01
- Issued
- Abate by
- Penalty
- Initial $12500.00 · Current $6875.00 Reduced
Recent events (2)
- — J (R) $6875.00
- — Z (R) $12500.00
1910.219 E01 I
- Issued
- Abate by
Recent events (2)
- — J (R)
- — Z (R)
1910.219 E03 I
- Issued
- Abate by
Recent events (2)
- — J (R)
- — Z (R)
1910.242 B
- Issued
- Abate by
- Penalty
- Initial $7500.00 · Current $4125.00 Reduced
Recent events (2)
- — J (R) $4125.00
- — Z (R) $7500.00
1910.254 D09 III
- Issued
- Abate by
- Penalty
- Initial $3000.00 · Current $1650.00 Reduced
Recent events (2)
- — J (R) $1650.00
- — Z (R) $3000.00
1910.303 F
- Issued
- Abate by
- Penalty
- Initial $500.00
Recent events (2)
- — J (O)
- — Z (R) $500.00
1910.303 G02 I
- Issued
- Abate by
- Penalty
- Initial $25000.00 · Current $13750.00 Reduced
Recent events (2)
- — J (R) $13750.00
- — Z (R) $25000.00
1910.332 B01
- Issued
- Abate by
- Penalty
- Initial $15000.00 · Current $8250.00 Reduced
Recent events (2)
- — J (R) $8250.00
- — Z (R) $15000.00
1910.212 A01
- Issued
- Abate by
- Penalty
- Initial $25000.00 · Current $23500.00 Reduced
Recent events (3)
- — J (R) $23500.00
- — Z
- — Z (R) $25000.00
1910.22 B02
- Issued
- Abate by
Recent events (2)
- — J (O)
- — Z (O)
1910.37 Q01
- Issued
- Abate by
Recent events (2)
- — J (O)
- — Z (O)
1910.106 D03 II
- Issued
- Abate by
Recent events (2)
- — J (O)
- — Z (O)
1910.107 B05 I
- Issued
- Abate by
Recent events (2)
- — J (O)
- — Z (O)
1910.219 C02 I
- Issued
- Abate by
Recent events (2)
- — J (O)
- — Z (O)
1910.305 G01 IIIA
- Issued
- Abate by
Recent events (2)
- — J (O)
- — Z (O)
1910.305 G02 II
- Issued
- Abate by
Recent events (2)
- — J (O)
- — Z (O)
More inspections at MC WANE, INC. DBA KENNEDY VALVE
ELMIRA, NY—1997-07-31 00:00:00
MC WANE, INC. DBA KENNEDY VALVE
ELMIRA, NY—1996-12-16 00:00:00
MC WANE, INC. DBA KENNEDY VALVE
ELMIRA, NY—1996-12-16 00:00:00
MC WANE, INC. DBA KENNEDY VALVE
ELMIRA, NY—1995-01-13 00:00:00
MC WANE, INC. DBA KENNEDY VALVE
ELMIRA, NY—1993-12-23 00:00:00
MC WANE, INC. DBA KENNEDY VALVE
View MC WANE, INC. DBA KENNEDY VALVE's full OSHA safety record →
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in NY
MAYVILLE, NY—2026-07-16
MAYVILLE VILLAGE DPW
NEW HYDE PARK, NY—2026-07-16
NORTH HEMPSTEAD TN MICHAEL J TULLY PARK
CONESUS, NY—2026-07-16
CONESUS TN HIGHWAY DEPT
COMSTOCK, NY—2026-07-15
NYSDOCCS WASHINGTON CORRECTIONAL FACILITY
BALDWINSVILLE, NY—2026-07-15
LYSANDER TOWN HIGHWAY DEPARTMENT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 113937544.