WARNER ROBINS, GA —
OSHA Inspection: CAROTHERS CONSTRUCTION COMPANY, INC.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of CAROTHERS CONSTRUCTION COMPANY, INC. in JOINT STARS FUEL SYSTEM DOCK(DACA2196B0029), WARNER ROBINS, GA 31009 (NAICS 000000). OSHA activity number 17763327.
Where did this inspection happen?
- Establishment
- CAROTHERS CONSTRUCTION COMPANY, INC.
- Site address
- JOINT STARS FUEL SYSTEM DOCK(DACA2196B0029)
- City
- WARNER ROBINS
- State
- GA
- ZIP
- 31009
- Mailing
- P. O. BOX 7557, WARNER ROBBINS, GA 31093
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1542
- Employees
- 25
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
2 citations on file for this inspection.
1926.21 B02
- Issued
- Abate by
- Penalty
- Initial $360.00 · Current $180.00 Reduced
Recent events (2)
- — I (S) $180.00
- — Z (S) $360.00
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $7000.00 · Current $5820.00 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a) Warner Robins Air Force Base (Depot Aircraft Hangar site) -During the erection of the pre-fabricated structural steel for the North hangar (64' eave height and 250 foot clear span), temporary bracing was not installed on the North and South side walls, columns #5 through #11, exposing employees to the hazard of being struck by falling materials during structural collapse, on or about January 29, 1990. Among other methods, one feasible and acceptable method to correct this hazard is to permanently brace each beam prior to moving to the next, or to provide adequate temporary bracing until the permanent bracing is installed, according to the manufacturer's instructions.
Recent events (2)
- — I (W) $5820.00
- — Z (W) $7000.00
More inspections at CAROTHERS CONSTRUCTION COMPANY, INC.
WARNER ROBINS, GA—2000-04-25 00:00:00
CAROTHERS CONSTRUCTION COMPANY, INC.
WARNER ROBINS, GA—1997-03-05 00:00:00
CAROTHERS CONSTRUCTION COMPANY, INC.
View CAROTHERS CONSTRUCTION COMPANY, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in GA
GREENSBORO, GA—2026-07-16
PURE BEAUTY FARMS, INC.
FOREST PARK, GA—2026-07-16
POLYNT COMPOSITES USA INC.
AUGUSTA, GA—2026-07-16
GF CASTING SOLUTIONS AUGUSTA, LLC
CHAMBLEE, GA—2026-07-16
U.S. DEPARTMENT OF TREASURY
DECATUR, GA—2026-07-15
PALLETS ACQUISITION LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 17763327.