NORTHBORO, MA —
OSHA Inspection: JOHN LAPIN D.B.A. SALISBURY CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of JOHN LAPIN D.B.A. SALISBURY CONSTRUCTION in COREY WAY, SOLOMON POND ROAD, NORTHBORO, MA 01532 (NAICS 000000). OSHA activity number 17926833.
Where did this inspection happen?
- Establishment
- JOHN LAPIN D.B.A. SALISBURY CONSTRUCTION
- Site address
- COREY WAY, SOLOMON POND ROAD
- City
- NORTHBORO
- State
- MA
- ZIP
- 01532
- Mailing
- 453 CHANDLER ST., WORCESTER, MA 01602
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1751
- Employees
- 4
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
6 citations on file for this inspection.
1903.2 A01
- Issued
- Abate by
1926.150 A01
- Issued
- Abate by
1926.404 A02
- Issued
- Abate by
1926.404 B01
- Issued
- Abate by
1926.405 A02 IIJ
- Issued
- Abate by
1926.404 F06
- Issued
- Abate by
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in MA
BELLINGHAM, MA—2026-07-16
BELLINGHAM DEPARTMENT OF PUBLIC WORKS
PLYMOUTH, MA—2026-07-15
TECH-ETCH, INC.
WESTFIELD, MA—2026-07-15
BOISE CASCADE BUILDING MATERIALS DISTRIBUTION, L.L.C.
QUINCY, MA—2026-07-15
UNITEDWOR VM CONTRACTOR CORP
FALL RIVER, MA—2026-07-15
CRESCO LABS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 17926833.