MOOSIC, PA —
OSHA Inspection: MEN AT WORK INC
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of MEN AT WORK INC in GOEX BELIN PLANT, ROUTE 502, 1002 SPRINGBROOK AVE., MOOSIC, PA 18507 (NAICS 000000). OSHA activity number 18225748.
Where did this inspection happen?
- Establishment
- MEN AT WORK INC
- Site address
- GOEX BELIN PLANT, ROUTE 502, 1002 SPRINGBROOK AVE.
- City
- MOOSIC
- State
- PA
- ZIP
- 18507
- Mailing
- P.O. BOX 398, NEWFOUNDLAND, PA 18446
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1751
- Employees
- 4
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
8 citations on file for this inspection.
5(a)(1)
- Issued
- Abate by
- Penalty
- Initial $1050.00 · Current $525.00 Reduced
General-duty citation text
The alleged violations below have been grouped because they involve %% similar or related hazards that may increase the potential for injury resulting from an accident. Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a fall hazard: (a) Goex Inc., Packhouse Construction Site - an employee working at the edge of the packhouse roof wall was exposed to a fall of over 12 feet to the ground below and was not provided with fall protection, June 19, 1991. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THIS HAZARD IS ..... to provide and enforce the use of a safety belt and lanyard attached to a suitably strong structure member. OR IN THE ALTERNATIVE: 29 CFR 1926.28(a): Appropriate personal protective equipment was not worn by employees in all operations where there was exposure to hazardous conditions: (a) Goex Inc., Packhouse Construction Site - an employee working at the edge of the packhouse roof wall was exposed to a fall of over 12 feet to the ground below. A safety belt and lanyard or the equivalent fall protection was not being utilized, June 19, 1991. 3) Training and education for exposed employees, including methods to evaluate the effectiveness of training. Re-training should be done annually, or as operations change. Training should address hazards associated with the job, the risks of manual material handling, and how to prevent lifting injuries. A supervisor's training program should also be implemented to allow recognition of manual lifting hazards, and to reinforce the employer's ergonomic program. 4) Hazard prevention and control which includes engineering, work practices and administrative controls. ABATEMENT SCHEDULE STEP 1- Implementation of an ergonomics program for worksite analysis, medical management, and training and education, as detailed in Items 1-3, above. STEP 2- Submit to the Area Director a written, detailed plan of abatement outlining a schedule for the implementation of the administrative, work practice and engineering controls as detailed in Item 4. ALL PROPOSED CONTROL MEASURES SHALL BE APPROVED FOR EACH PARTICULAR USE BY A PERSON TRAINED IN THE EVALUATION OF WORKPLACE CONDITIONS WHICH CAUSE MUSCULOSKELETAL DISORDERS. SIXTY (60) DAY PROGRESS REPORTS ARE REQUIRED DURING THE ABATEMENT PERIOD. STEP 3- Implementation of administrative, work practice and engineering controls as described in Item 4, above.
Recent events (2)
- — I (S) $525.00
- — Z (S) $1050.00
1926.20 B01
- Issued
- Abate by
1926.403 B02
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $225.00 Reduced
Recent events (2)
- — I (S) $225.00
- — Z (S) $450.00
1926.404 F06
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $200.00 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $450.00
1926.404 F07 IVC
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $200.00 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $450.00
1926.405 B01
- Issued
- Abate by
- Penalty
- Initial $450.00 · Current $200.00 Reduced
Recent events (2)
- — I (S) $200.00
- — Z (S) $450.00
1904.2 A
- Issued
- Abate by
- Penalty
- Initial $300.00 · Current $150.00 Reduced
Recent events (2)
- — I (O) $150.00
- — Z (O) $300.00
1926.59 E01
- Issued
- Abate by
More inspections in this industry (NAICS 000000)
SCHENECTADY, NY—2012-01-05 00:00:00
BRUCE D. BOWMAN
BILLINGS, MT—2005-01-25 00:00:00
KGC, INC.
ROCKAWAY, NJ—2002-12-31 00:00:00
ROCKAWAY BOROUGH DPW
FOREST CITY, NC—2002-12-31 00:00:00
HARRY BRICKEY DBA A. BRICKEY CEILING COMPANY
EDGERTON, KS—2002-12-31 00:00:00
SUDDEN BOND INDUSTRIES
More inspections in PA
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
JEFFERSON HILLS, PA—2026-07-16
MARATHON PETROLEUM COMPANY ASPHALT TERMINAL
SMITHFIELD, PA—2026-07-16
CARLISLE CONSTRUCTION MATERIALS
PITTSBURGH, PA—2026-07-15
DREAM GREENER LAWN & LANDSCAPE
COCHRANTON, PA—2026-07-15
CRAWFORD COUNTY HARDWOODS, LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 18225748.