ARGO, IL —
OSHA Inspection: LULE STEVENSON INSULATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of LULE STEVENSON INSULATION in CPC PLANT, ARGO, IL 60501 (NAICS 000000). OSHA activity number 1946441.
Where did this inspection happen?
- Establishment
- LULE STEVENSON INSULATION
- Site address
- CPC PLANT
- City
- ARGO
- State
- IL
- ZIP
- 60501
- Mailing
- 2050 NORTH 15TH AVE, MELROSE PARK, IL 60160
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1796
- Employees
- 7
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
No citations on file for this inspection. OSHA's citation feed is backfilled in rolling windows; this inspection may have been closed without violations, or its citation rows may not have been ingested yet.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 1946441.