Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: BRIDGESTONE/FIRESTONE, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BRIDGESTONE/FIRESTONE, INC. in US HWY 301S/FIRESTONE PARKWAY, WILSON, NC 27893 (NAICS 000000). OSHA activity number 302356001.

Watch Bridgestone/Firestone, INC. — free Get an email when a new federal OSHA severe-injury report for Bridgestone/Firestone, INC. is published. One employer, no account, unsubscribe in one click.
Site address
US HWY 301S/FIRESTONE PARKWAY
City
WILSON
State
NC
ZIP
27893
Mailing
PO BOX 1139, WILSON, NC 27894
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
3011
Employees
1964
Ownership type
A
Industry flags
Manufacturing safety.

63 citations on file for this inspection.

7F0102

Serious 15 instances 1794 exposed
Issued
Abate by
Penalty
Initial $688.00 · Current $645.00 Reduced
Recent events (2)
  • — I (S) $645.00
  • — Z (S) $688.00

7F0102

Serious 1 instance 6 exposed
Issued
Abate by

7F0102

Serious 15 instances 1794 exposed
Issued
Abate by
Recent events (2)
  • — P (S)
  • — Z (S)

7F0102

Serious 6 instances 1794 exposed
Issued
Abate by
Recent events (2)
  • — P (S)
  • — Z (S)

7F0102

Serious 10 instances 1794 exposed
Issued
Abate by

7F0102

Serious 4 instances
Issued
Abate by

7F0102

Serious 4 instances 1794 exposed
Issued
Abate by

95012901

Serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1375.00 · Current $645.00 Reduced
North Carolina General Statute 95-129(1) of the Occupational
Safety and Health Act of North Carolina:  The employer did not
furnish each of his employees conditions of employment and a
place of employment free from recognized hazards that were
causing or likely to cause death or serious physical harm to
employees in that employees were exposed to uninspected hoists:
Complete inspections of the hoist was not performed at intervals
defined in ANSI B30.16-1981 Chapter 16-2, article 16-2.1.1(b)(2).
a)waste oil shelter - hoist was not provided an
inspection prior to use or a periodic or frequent
intervals thereafter.
One feasible and acceptable means of abatement, among others, is
to perform periodic inspections during the intervals indicated as
stipulated in ANSI B30.16-1981, Article 16-2.1.3.81,
Recent events (2)
  • — I (S) $645.00
  • — Z (S) $1375.00

1910.22 D01

Serious 2 instances 17 exposed
Issued
Abate by
Penalty
Initial $688.00 · Current $645.00 Reduced
Recent events (2)
  • — I (S) $645.00
  • — Z (S) $688.00

1910.23 A08 II

Serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1375.00 · Current $1290.00 Reduced
Recent events (2)
  • — I (S) $1290.00
  • — Z (S) $1375.00

1910.23 C01

Serious 2 instances 8 exposed
Issued
Abate by
Penalty
Initial $1375.00 · Current $1290.00 Reduced
Recent events (3)
  • — P (S) $1290.00
  • — I (S) $1375.00
  • — Z (S) $1375.00

1910.23 D01 II

Serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $688.00 · Current $645.00 Reduced
Recent events (2)
  • — I (S) $645.00
  • — Z (S) $688.00

1910.24 E

Serious 1 instance 2 exposed
Issued
Abate by

1910.145 F03

Serious 3 instances 10 exposed
Issued
Abate by
Penalty
Initial $1925.00 · Current $1800.00 Reduced
Recent events (2)
  • — I (S) $1800.00
  • — Z (S) $1925.00

1910.304 F04

Serious 28 instances
Issued
Abate by

1910.303 E

Serious 2 instances 2 exposed
Issued
Abate by

1910.303 B02

Serious 7 instances
Issued
Abate by

1910.304 F05 VC1

Serious 1 instance 1 exposed
Issued
Abate by

1910.147 F02 I

Deleted Serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $963.00
Recent events (2)
  • — I (S)
  • — Z (S) $963.00

1910.176 B

Serious 3 instances 1 exposed
Issued
Abate by
Penalty
Initial $1375.00 · Current $1290.00 Reduced
Recent events (2)
  • — I (S) $1290.00
  • — Z (S) $1375.00

1910.178 N01

Deleted Serious 6 instances 7 exposed
Issued
Abate by
Penalty
Initial $1375.00
Recent events (2)
  • — I (S)
  • — Z (S) $1375.00

1910.178 N04

Serious 6 instances 7 exposed
Issued
Abate by
Penalty
Current $645.00
Recent events (3)
  • — P (S) $645.00
  • — I (S)
  • — Z (S)

1910.178 N08

Serious 6 instances 7 exposed
Issued
Abate by
Recent events (2)
  • — P (S)
  • — Z (S)

1910.178 Q09

Serious 1 instance 7 exposed
Issued
Abate by
Recent events (2)
  • — P (S)
  • — Z (S)

1910.212 A01

Serious 10 instances 2 exposed
Issued
Abate by
Penalty
Initial $688.00 · Current $645.00 Reduced
Recent events (2)
  • — I (S) $645.00
  • — Z (S) $688.00

1910.212 A02

Serious 2 instances
Issued
Abate by

1910.212 A03 II

Serious 3 instances 1 exposed
Issued
Abate by

1910.212 A05

Serious 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $1375.00 · Current $1290.00 Reduced
Recent events (2)
  • — I (S) $1290.00
  • — Z (S) $1375.00

1910.219 C04 I

Serious 30 instances 16 exposed
Issued
Abate by
Penalty
Initial $1375.00 · Current $1290.00 Reduced
Recent events (2)
  • — I (S) $1290.00
  • — Z (S) $1375.00

1910.242 B

Serious 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $825.00 · Current $780.00 Reduced
Recent events (2)
  • — I (S) $780.00
  • — Z (S) $825.00

1910.303 G02 I

Serious 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $963.00 · Current $900.00 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $963.00

1910.303 G02 II

Serious 3 instances 4 exposed
Issued
Abate by
Penalty
Initial $100.00 · Current $100.00
Recent events (2)
  • — I (S) $100.00
  • — Z (S) $100.00

1910.305 B01

Serious 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $1925.00 · Current $1800.00 Reduced
Recent events (2)
  • — I (S) $1800.00
  • — Z (S) $1925.00

1910.305 B01

Serious 33 instances 4 exposed
Issued
Abate by
Penalty
Initial $963.00 · Current $900.00 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $963.00

1910.305 B02

Serious 8 instances 1 exposed
Issued
Abate by
Penalty
Initial $963.00 · Current $900.00 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $963.00

1910.305 G01 III

Serious 6 instances 6 exposed
Issued
Abate by
Penalty
Initial $1925.00 · Current $1800.00 Reduced
Recent events (2)
  • — I (S) $1800.00
  • — Z (S) $1925.00

1910.305 G02 II

Serious 7 instances 2 exposed
Issued
Abate by

1910.305 G02 III

Serious 1 instance 1 exposed
Issued
Abate by

1910.305 J01 I

Serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $963.00 · Current $900.00 Reduced
Recent events (2)
  • — I (S) $900.00
  • — Z (S) $963.00

1910.334 A03 III

Serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1925.00 · Current $1800.00 Reduced
Recent events (2)
  • — I (S) $1800.00
  • — Z (S) $1925.00

1910.23 C01

Other-than-serious 1 instance 1 exposed
Issued
Abate by

1910.23 D01 I

Other-than-serious 1 instance 1 exposed
Issued
Abate by

1910.23 D01 III

Other-than-serious 1 instance
Issued
Abate by

1910.23 E02

Other-than-serious 1 instance 1 exposed
Issued
Abate by

1910.25 D01 X

Other-than-serious 1 instance 1 exposed
Issued
Abate by

1910.29 A04 II

Other-than-serious 1 instance 3 exposed
Issued
Abate by

1910.101 B

Other-than-serious 5 instances 1 exposed
Issued
Abate by

1910.145 C03

Other-than-serious 1 instance
Issued
Abate by

1910.145 F03

Other-than-serious 8 instances 1 exposed
Issued
Abate by

1910.157 C01

Other-than-serious 13 instances 7 exposed
Issued
Abate by

1910.157 C04

Other-than-serious 15 instances 2 exposed
Issued
Abate by

1910.157 E01

Other-than-serious 30 instances 60 exposed
Issued
Abate by

1910.157 E02

Other-than-serious 30 instances 6 exposed
Issued
Abate by

1910.157 E03

Other-than-serious 30 instances 1 exposed
Issued
Abate by

1910.212 A05

Other-than-serious 1 instance 1 exposed
Issued
Abate by

1910.215 B09

Other-than-serious 1 instance 3 exposed
Issued
Abate by

1910.176 C

Other-than-serious 1 instance 1 exposed
Issued
Abate by

1910.253 B02 IV

Other-than-serious 1 instance 1 exposed
Issued
Abate by

1910.303 F

Other-than-serious 10 instances 3 exposed
Issued
Abate by

1910.303 G01 II

Other-than-serious 8 instances 4 exposed
Issued
Abate by

1910.303 G01 III

Other-than-serious 1 instance 8 exposed
Issued
Abate by

1910.304 A02

Other-than-serious 2 instances 4 exposed
Issued
Abate by

1910.305 B01

Other-than-serious 30 instances 8 exposed
Issued
Abate by

View BRIDGESTONE/FIRESTONE, INC.'s full OSHA safety record →