Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: WHITE WAY SIGN & MAINTENANCE CO.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WHITE WAY SIGN & MAINTENANCE CO. in 151 NORTH JOLIET STREET, JOLIET, IL 60432 (NAICS 237110). OSHA activity number 306000787.

Watch White WAY Sign & Maintenance CO. — free Get an email when a new federal OSHA severe-injury report for White WAY Sign & Maintenance CO. is published. One employer, no account, unsubscribe in one click.
Site address
151 NORTH JOLIET STREET
City
JOLIET
State
IL
ZIP
60432
Mailing
1317 N. CLYBOURN AVENUE, CHICAGO, IL 60610
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Data loaded
NAICS code
237110
SIC code (legacy)
7312
Employees
175
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 03 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1750.00 · Current $1225.00 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer failed to
provide a place of employment which was free from recognized hazards that
were likely to
cause death or serious physical harm to employees:
(a)  On or about August 27, 2003, at the above address job site, an
employee of Chellino
Crane Rental,Inc. operated a crane which lifted a man basket carrying two
White Way Sign
& Maintenance Co. employees to an approximate height of 40 - 50 feet.
Alternate ways to
gain access to the area to perform the required work without the use of a
crane and
manbasket were not initially investigated.  In addition, the crane was not
equipped with a
positive acting device which prevents contact between the load block or
overhaul ball and the
boom tip (anti-two-blocking device), or by a system to deactivate the
hosting action before
damage occurs in the event of a two-blocking situation (two block damage
prevention
feature). The employees in the man basket were thereby exposed to the
hazards associated
with falls of approximately 40-50 feet.
A feasible means of abatement would have been to gain access to a lower
roof by an
alternate method. Where a man basket was the only way to perform the work
a feasible
means of abatement would be to provide a positive acting device which
prevents contact
between the load block or overhaul ball and the boom tip
(anti-two-blocking device), or by a
system to deactivate the hosting action before damage occurs in the event
of a two-blocking
situation (two block damage prevention feature) in accordance with the man
basket  and
crane manufacturer's requirements and ASME/ANSI B30.5 1989.
Recent events (2)
  • — I (S) $1225.00
  • — Z (S) $1750.00

View WHITE WAY SIGN & MAINTENANCE CO.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 306000787.