OSHA Inspection: PREFAB BUILDING COMPONENTS, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PREFAB BUILDING COMPONENTS, INC. in 1115 ENOCH DR., MIDDLETOWN, OH 45042 (NAICS 321214). OSHA activity number 306058819.

Watch Prefab Building Components, INC. — free Get an email when a new federal OSHA severe-injury report for Prefab Building Components, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1115 ENOCH DR.
City
MIDDLETOWN
State
OH
ZIP
45042
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321214
SIC code (legacy)
2439
Employees
25
Ownership type
A
Industry flags
Manufacturing safety.

13 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 03 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $200.00 Reduced
Recent events (2)
  • — I (S) $200.00
  • — Z (S) $375.00

1910.147 C07 I

Serious Gravity 03 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $300.00 Reduced
Recent events (2)
  • — I (S) $300.00
  • — Z (S) $375.00

1910.212 A01

Deleted Serious Gravity 03 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $375.00
Recent events (2)
  • — I (S)
  • — Z (S) $375.00

1910.213 B03

Serious Gravity 03 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $200.00 Reduced
Recent events (2)
  • — I (S) $200.00
  • — Z (S) $375.00

1910.213 C01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1500.00 · Current $200.00 Reduced
Recent events (2)
  • — I (S) $200.00
  • — Z (S) $1500.00

1910.213 C02

Serious Gravity 03 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $200.00 Reduced
Recent events (2)
  • — I (S) $200.00
  • — Z (S) $375.00

1910.213 C03

Serious Gravity 03 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $200.00 Reduced
Recent events (2)
  • — I (S) $200.00
  • — Z (S) $375.00

1910.213 H01

Serious Gravity 10 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $1500.00 · Current $200.00 Reduced
Recent events (2)
  • — I (S) $200.00
  • — Z (S) $1500.00

1910.213 H03

Serious Gravity 03 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $200.00 Reduced
Recent events (2)
  • — I (S) $200.00
  • — Z (S) $375.00

1910.213 H04

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $1500.00 · Current $200.00 Reduced
Recent events (2)
  • — I (S) $200.00
  • — Z (S) $1500.00

1910.213 R04

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1500.00 · Current $1000.00 Reduced
Recent events (2)
  • — I (S) $1000.00
  • — Z (S) $1500.00

1910.219 E03 I

Serious Gravity 03 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $300.00 Reduced
Recent events (2)
  • — I (S) $300.00
  • — Z (S) $375.00

1910.334 A02 II

Serious Gravity 03 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $375.00 · Current $300.00 Reduced
Recent events (2)
  • — I (S) $300.00
  • — Z (S) $375.00

View PREFAB BUILDING COMPONENTS, INC.'s full OSHA safety record →