Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: METHENY CONCRETE - NEWCASTLE BATCH PLANT

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of METHENY CONCRETE - NEWCASTLE BATCH PLANT in 5355 SE 40TH, NEWCASTLE, OK 73065 (NAICS 327320). OSHA activity number 310997580.

Watch Metheny Concrete - Newcastle Batch Plant — free Get an email when a new federal OSHA severe-injury report for Metheny Concrete - Newcastle Batch Plant is published. One employer, no account, unsubscribe in one click.
Site address
5355 SE 40TH
City
NEWCASTLE
State
OK
ZIP
73065
Mailing
1617 S. LOWRY AVENUE, OKLAHOMA CITY, OK 73129
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327320
SIC code (legacy)
3273
Employees
12
Ownership type
A
Industry flags
Manufacturing health.

1 citation on file for this inspection.

1910.23 D01

Serious Gravity 01 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $825.00 · Current $495.00 Reduced
Recent events (2)
  • — I (S) $495.00
  • — Z (S) $825.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 310997580.