GUAYAMA, PR —
OSHA Inspection: DS PROGRAMA WIC GUAYAMA
Unprogrammed Related inspection · Health discipline
At a glance
On , OSHA opened an unprogrammed Related health inspection of DS PROGRAMA WIC GUAYAMA in CALLE BALDORIOTY, GUAYAMA, PR 00784 (NAICS 624410). OSHA activity number 312588585.
Where did this inspection happen?
- Establishment
- DS PROGRAMA WIC GUAYAMA
- Site address
- CALLE BALDORIOTY
- City
- GUAYAMA
- State
- PR
- ZIP
- 00784
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 624410
- SIC code (legacy)
- 8351
- Employees
- 7
- Ownership type
- C
Citations
4 citations on file for this inspection.
1910.141 A03 I
- Issued
- Abate by
- Penalty
- Initial $1125.00
Recent events (2)
- — I (S)
- — Z (S) $1125.00
6A0001
- Issued
- Abate by
- Penalty
- Initial $500.00
General-duty citation text
Section 6(a) of the Puerto Rico Occupational Safety and Health Act: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or physical harm to employees in that employees were exposed to: Seccion 6(a) de la Ley de Seguridad y Salud en el Trabajo de Puerto Rico: El patrono no proveyo empleo y un sitio de empleo libre de riesgos reconocidos que esten causando o que puedan causar muerte o dano fisico a los empleados, por cuanto empleados estaban expuestos a: Employer DS Programa WIC did not have a written protocol to handle domestic violence in the workplace, as required by the Act for the Implementation of a Protocol to Handle Domestic Violence Situations in the Workplace or Place of Employment, Act No. 217 of 2006. Hazard: Fatalities, injuries, and illnesses related to domestic violence in the workplace. Among other methods, one feasible and acceptable method to correct this hazard is to develop a written protocol to handle domestic violence in the workplace and provide training to all the employees. Information is available at the Women's Advocate Office, A Guide for employers: Domestic Violence in the Workplace, and other references provided during the inspection. Patrono DS Programa WIC no tenia un protocolo escrito para manejar violencia domestica en el lugar de trabajo, segun requerido por la Ley para la Implantacion de un Protocolo para Manejar Situaciones de Violencia Domestica en Lugar o Sitio de Trabajo, Ley Num. 217 de 2006. Riesgo: Fatalidades, lesiones, y enfermedades relacionadas a violencia domestica en el lugar de trabajo. Entre otros metodos, un metodo factible y aceptable para corregir este riesgo es desarrollar un protocolo escrito para manejar violencia domestica en el lugar de trabajo y proveer adiestramiento a todos los empleados. Informacion esta diponible en la Oficina de la Procuradora de las Mujeres, Una guia para Patronos: Violencia Domestica en el Lugar de Trabajo, y otras referencias provistas durante la inspeccion.
Recent events (2)
- — I (O)
- — Z (O) $500.00
1910.22 A02
- Issued
- Abate by
- Penalty
- Initial $750.00
General-duty citation text
Section 6(a) of the Puerto Rico Occupational Safety and Health Act: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or physical harm to employees in that employees were exposed to: Seccion 6(a) de la Ley de Seguridad y Salud en el Trabajo de Puerto Rico: El patrono no proveyo empleo y un sitio de empleo libre de riesgos reconocidos que esten causando o que puedan causar muerte o dano fisico a los empleados, por cuanto empleados estaban expuestos a: Employer DS Programa WIC did not have a sealer or a treatment for the roof, in the building since every time it rained, the roof would leak and the water storm drain sistem would flood, exposing the employees to falls, from wet floors. Hazard: Falls. Among other methods, one feasible and acceptable method to correct this hazard is to apply a treatment to mend the leaks from the roof and have the storm drain sistem checked. Patrono DS programa WIC no contaba con un tratamiento de sellado de techo del edificio, que evitara que el piso se mojara cuando llovia, el techo filtraba exponiendo a empledos a caidas, igualmente contaba con una alcantarilla de aguas de escorrentias, que se desbordaba cuando llovia. Riesgo: Caidas. Entre otros metodos, un metodo factible y aceptable para corregir este riesgo es aplicar un tratamiento de techo o sellado que repare el filtrado, y que hagan verificar el alcantarillado de escorrentias.o
Recent events (2)
- — I (O)
- — Z (O) $750.00
1910.157 E03
- Issued
- Abate by
- Penalty
- Initial $750.00
Recent events (2)
- — I (O)
- — Z (O) $750.00
More inspections at DS PROGRAMA WIC GUAYAMA
GUAYAMA, PR—2013-04-08 00:00:00
DS PROGRAMA WIC GUAYAMA
View DS PROGRAMA WIC GUAYAMA's full OSHA safety record →
More inspections in this industry (NAICS 624410)
PONCE, PR—2026-07-15
CENTROS SOR ISOLINA FERRE INC
PONCE, PR—2026-07-15
CENTROS SOR ISOLINA FERRE INC
OROCOVIS, PR—2026-06-29
CENTRO DE HEAD START DE OROCOVIS
SUFFOLK, VA—2026-06-15
OAK & LILY ACADEMY
SACRAMENTO, CA—2026-06-14
ROLANDO & MARYBELL AGDIGOS CARE HOME #2
More inspections in PR
SAN JUAN, PR—2026-07-16
U.S. DEPARTMENT OF AGRICULTURE-FOREST SERVICE
PONCE, PR—2026-07-15
CENTROS SOR ISOLINA FERRE INC
PONCE, PR—2026-07-15
FC CONSTRUCTION LLC
PONCE, PR—2026-07-15
HECTOR M. RIVERA
SAN JUAN, PR—2026-07-15
MUNICIPIO DE SAN JUAN
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312588585.