Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: WRP REFINING LP

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of WRP REFINING LP in 900 S. CENTRAL AVE., PO BOX 76, ROXANA, IL 62084 (NAICS 324110). OSHA activity number 313015380.

Watch WRP Refining LP — free Get an email when a new federal OSHA severe-injury report for WRP Refining LP is published. One employer, no account, unsubscribe in one click.
Establishment
WRP REFINING LP
Site address
900 S. CENTRAL AVE., PO BOX 76
City
ROXANA
State
IL
ZIP
62084
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
324110
SIC code (legacy)
2911
Employees
780
Ownership type
A

5 citations on file for this inspection.

1910.119 D03 IB

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4500.00
29 CFR 1910.119(d)(3)(i)(B):  Process safety information pertaining to the
equipment in the
process did not include the piping and instrument diagrams (P&ID'S):
At WRB Refining, the company did not ensure the Piping and Instrumentation
Diagrams were
correct and up to date. On DWG E48395, the 2 inch bypass line coming off
of the Warm
Product Separator had two block valves; one was labeled car-sealed closed
(CSC) while the other
valve downstream was not labeled on the P&ID as car-sealed open (CSO).
***ABATEMENT DOCUMENTATION IS REQUIRED FOR THIS ITEM IN ACCORDANCE
WITH THE REQUIREMENTS OF 29 CFR 1903.19(d)***
Recent events (2)
  • — F (S)
  • — Z (S) $4500.00

1910.119 D03 II

Other-than-serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4500.00 · Current $2000.00 Reduced
29 CFR 1910.119(d)(3)(ii):  The employer did not document that the
equipment in the process
complied with recognized and generally accepted good engineering practices:
At WRB Refining, the company did not ensure the car sealed block valves on
the 2" and 4"
bypass lines on the warm product separator were audited to ensure that
administrative controls
followed recognized and generally accepted good engineering practices,
such as the ASME
Boiler and Pressure Vessel Code.
***ABATEMENT DOCUMENTATION IS REQUIRED FOR THIS ITEM IN ACCORDANCE
WITH THE REQUIREMENTS OF 29 CFR 1903.19(d)***
Recent events (2)
  • — F (O) $2000.00
  • — Z (S) $4500.00

1910.119 F01 ID

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4500.00
29 CFR 1910.119(f)(1)(i)(D):  The employer's written operating procedures
covering the steps
for each operating phase did not address emergency shutdown including the
conditions under
which emergency shutdown is required, and the assignment of shutdown
responsibility to
qualified operators to ensure that emergency shutdown in a safe and timely
manner:
On or about April 29, 2010, at WRB Refining, the employer did not ensure
that written
emergency shutdown procedures provided clear instructions for the
emergency depressuring of
the S-Zorb in the event of a fire. The written procedures did not address
all of the steps involved
when depressuring the reactor:
a.The procedures did not include the opening of the bypass when the warm
product
separator emergency depressuring valve failed to open.
b.Pressure was also relieved through the Cool Product Separator and not
included
in the emergency shutdown procedures.
***ABATEMENT DOCUMENTATION IS REQUIRED FOR THIS ITEM IN ACCORDANCE
WITH THE REQUIREMENTS OF 29 CFR 1903.19(d)***
Recent events (2)
  • — F (S)
  • — Z (S) $4500.00

1910.119 J05

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4500.00
29 CFR 1910.119(j)(5):  The employer did not correct deficiencies in
equipment that were
outside acceptable limits (as defined by process information in 29 CFR
1910.119(d) before
further use or in a safe and timely manner:
On or about April 29, 2010, at WRB Refining, in the S-Zorb Unit the
employer did not correct
deficiencies in equipment before further use or in a safe and timely
manner:
a.Misalignment of outlet piping coming from the reactor effluent filter
was not
corrected to prevent the escape of gasoline;
b.Bolts were not replaced on the outlet flange on the reactor effluent
filter in a
timely manner to prevent fire or loss of gasoline.
Recent events (2)
  • — F (S)
  • — Z (S) $4500.00

1910.119 J05

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4500.00 · Current $4500.00
29 CFR 1910.119(j)(6)(ii):  Appropriate checks and inspections were not
performed to assure
that equipment was installed properly and consistent with design
specifications and the
manufacturer's instructions:
On or about April 29, 2010, at WRB Refining, in the S-Zorb Unit the
employer did not ensure
that equipment was installed properly and consistent with design
specifications:
a.Misalignment of outlet piping coming from the reactor effluent filter
was not
installed correctly to prevent the escape of gasoline;
b.The flange on the outlet piping coming from the effluent filter had a
gasket
installed that was not per original design specifications.
Recent events (2)
  • — F (S) $4500.00
  • — Z (S) $4500.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313015380.