OSHA Inspection: CHEMART COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CHEMART COMPANY in 11 NEW ENGLAND WAY, LINCOLN, RI 02865 (NAICS 339914). OSHA activity number 314920836.

Watch Chemart Company — free Get an email when a new federal OSHA severe-injury report for Chemart Company is published. One employer, no account, unsubscribe in one click.
Establishment
CHEMART COMPANY
Site address
11 NEW ENGLAND WAY
City
LINCOLN
State
RI
ZIP
02865
Mailing
15 NEW ENGLAND WAY, LINCOLN, RI 02865
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
339914
SIC code (legacy)
3479
Employees
78
Ownership type
A

5 citations on file for this inspection.

1910.119 E03 I

Serious Gravity 05 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $1750.00 Reduced
29 CFR 1910.119(e)(3)(i):  The process hazard analysis did not address the
hazards of the
process:
(a) Chlorine storage room and etching room: The process hazard analysis
did not address the
hazards associated with the loss of electric power in the facility, on or
about 1-19-12.,
Recent events (2)
  • — I (S) $1750.00
  • — Z (S) $3500.00

1910.119 E03 VI

Serious Gravity 05 1 instance 3 exposed
Issued
Abate by
29 CFR 1910.119(e)(3)(vi):  The process hazard analysis did not address
human factors:
(a) Chlorine storage room and etching room: The process hazard analysis
did not address the
hazards associated with human factors, such as but not limited to
employees failing to plug in
the drip heaters or not opening or closing the correct chlorine valves, on
or about 1-19-12.
Recent events (2)
  • — I (S)
  • — Z (S)

1910.119 J02

Serious Gravity 05 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $1750.00 Reduced
29 CFR 1910.119(j)(2):  The employer did not establish and implement
written procedures to
maintain the on-going mechanical integrity of process equipment:
(a) Chlorine storage room and etching room: The employer did not establish
and implement
written procedures for the inspection and testing of the regulators,
valves and piping, ventilation
system, and drip leg heaters, on or about 1-19-12.
Recent events (2)
  • — I (S) $1750.00
  • — Z (S) $3500.00

1910.119 L01

Serious Gravity 05 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $1750.00 Reduced
29 CFR 1910.119(l)(1):  The employer did not establish and implement
written procedures to
manage changes to process chemicals, technology, equipment, and
procedures; and, changes to
facilities that affect a covered process:
(a) Etching room: The employer did not implement a management of change
procedure for the
removal of two etch regenerators in February 2009, resulting in two dead
legs in the piping
system.ng
Recent events (2)
  • — I (S) $1750.00
  • — Z (S) $3500.00

1910.119 D03 IE

Other-than-serious Gravity 01 1 instance 3 exposed
Issued
Abate by
29 CFR 1910.119(d)(3)(i)(E):  Process safety information pertaining to the
equipment in the
process did not include the ventilation system design:
(a) Chlorine storage room: The process safety information did not include
information pertaining
to the ventilation system design and capacity, on or about 1-19-12.,
Recent events (2)
  • — I (O)
  • — Z (O)

View CHEMART COMPANY's full OSHA safety record →