CHICAGO HEIGHTS, IL —
OSHA Inspection: TRIALCO COMPANY
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of TRIALCO COMPANY in 900 E. LINCOLN HIGHWAY, CHICAGO HEIGHTS, IL 60411 (NAICS 331311). OSHA activity number 335339198.
Where did this inspection happen?
- Establishment
- TRIALCO COMPANY
- Site address
- 900 E. LINCOLN HIGHWAY
- City
- CHICAGO HEIGHTS
- State
- IL
- ZIP
- 60411
- Mailing
- 900 E. LINCOLN HIGHWAY, CHICAGO HEIGHTS, IL 60411
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 331311
- Employees
- 50
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.119 C01
- Issued
- Abate by
- Penalty
- Initial $3150.00 · Current $1600.00 Reduced
General-duty citation text
29 CFR 1910.119(c)(1): Employers shall develop a written plan of action regarding the implementation of the employee participation required by this paragraph. Throughout facility - On or about July 20, 2012, the employer did not develop a written plan of action regarding employees involvement in the employer's efforts to develop and implement the process safety management program elements and hazard assessments.
Recent events (2)
- — I (S) $1600
- — Z (S) $3150
1910.119 F01 I D
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(f)(1)(i)(D): Emergency shutdown including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner. Throughout facility - On or about July 27, 2012, the employer's written operating procedures covering the steps for each operating phase did not address emergency shutdown including conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shut down is executed in a safe and timely manner, such as, but not limited to, a chlorine vapor pipe leak.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 F01 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(f)(1)(ii): Operating limits: Throughout facility - On or about July 27, 2012, the employer's written operating procedures did not address the requirements for the operating limits listed in 29CFR1910.119(f)(1)(ii) A & B such as, but not limited to, the rate of flow of chlorine vapor to the furnaces.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 F03
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(f)(3): The operating procedures shall be reviewed as often as necessary to assure that they reflect current operating practice, including changes that result from changes in process chemicals, technology, and equipment, and changes to facilities. The employer shall certify annually that these operating procedures are current and accurate. Chlorine room - On or about July 20, 2012, the employer did not certify annually that the operating procedures such as, but not limited to, changing out chlorine cylinders in the chlorine room, are current and accurate.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 J02
- Issued
- Abate by
- Penalty
- Initial $3150.00 · Current $1600.00 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): Written procedures. The employer shall establish and implement written procedures to maintain the on-going integrity of process equipment. Throughout facility - On or about July 27, 2012, the employer did not establish and implement written procedures to maintain the on-going mechanical integrity of its process equipment such as, but not limited to, process pressure piping in chlorine service throughout the facility.
Recent events (2)
- — I (S) $1600
- — Z (S) $3150
1910.119 J04 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(j)(4)(ii): Inspection and testing procedures shall follow recognized and generally accepted good engineering practices. Throughout facility - On or about July 27, 2012, the employer's inspections and tests performed on its process pressure piping in chlorine service throughout the facility did not include inspections at periodic intervals by an authorized piping inspector to assure its mechanical integrity for continued service.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 N
- Issued
- Abate by
- Penalty
- Initial $3150.00 · Current $1600.00 Reduced
General-duty citation text
29 CFR 1910.119(n): Emergency planning and response. The employer shall establish and implement an emergency action plan for the entire plant in accordance with the provisions of 29 CFR 1910.38. In addition, the emergency action plan shall include procedures for handling small releases. Employers covered under this standard may also be subject to the hazardous waste and emergency response provisions contained in 29 CFR 1910.120 (a), (p) and (q). Throughout facility - On or about July 27, 2012, the employer's emergency action plan did not include procedures for handling small releases to specify the necessary level of knowledge to distinguish between incidental releases (that can be handled by employees not trained to handle releases requiring an emergency response), to address training needs, specify necessary personal equipment and air monitoring devices.
Recent events (2)
- — I (S) $1600
- — Z (S) $3150
1910.119 O01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(o)(1): Employers shall certify that they have evaluated compliance with the provisions of this section at least every three years to verify that the procedures and practices developed under the standard are adequate and are being followed. Throughout faciltity - On or about July 27, 2012, the employer did not certify that it had evaluated compliance with the provisions of 29CFR1910.119 at least every three years to verify that the procedures and practices developed under this standard are being followed.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 331311)
TUCSON, AZ—2013-05-01 00:00:00
SASOL NORTH AMERICA INC.
ANN ARBOR, MI—2013-03-19 00:00:00
PIDC
ANN ARBOR, MI—2013-03-19 00:00:00
PIDC
ANN ARBOR, MI—2013-03-19 00:00:00
PIDC
ANN ARBOR, MI—2013-02-26 00:00:00
PIDC
More inspections in IL
DEERFIELD, IL—2026-07-16
JOHN BURNS CONSTRUCTION COMPANY, LLC
BANNOCKBURN, IL—2026-07-16
BUILDER SERVICES GROUP, INC. DBA CJ INSULATION
BANNOCKBURN, IL—2026-07-16
ROOFING H.P. LLC
HIGHLAND PARK, IL—2026-07-16
UNITED PLUMBING AND DRAIN, INC.
FRANKLIN PARK, IL—2026-07-16
B & M PLASTIC INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335339198.