EAST BOSTON, MA —
OSHA Inspection: COMPONENT ASSEMBLY SYSTEMS, INC.
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of COMPONENT ASSEMBLY SYSTEMS, INC. in TOMAHAWK DRIVE, EAST BOSTON, MA 02128 (NAICS 238130). OSHA activity number 336971189.
Where did this inspection happen?
- Establishment
- COMPONENT ASSEMBLY SYSTEMS, INC.
- Site address
- TOMAHAWK DRIVE
- City
- EAST BOSTON
- State
- MA
- ZIP
- 02128
- Mailing
- 217 PARK STREET, MEDFORD, MA 02155
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 18
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.300 B06
- Issued
- Abate by
- Penalty
- Initial $3740.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1926.300(b)(6): "Anchoring fixed machinery." Machines designed for a fixed location were not securely anchored to prevent walking or moving. Chop saws, including a chop saw being used to cut metal studs on the third floor, were not secured against movement.
Recent events (2)
- — I (O) $1000
- — Z (S) $3740
1926.302 E12
- Issued
- Abate by
- Penalty
- Initial $3740.00 · Current $2618.00 Reduced
General-duty citation text
29 CFR 1926.302(e)(12): Powder-actuated tool(s) in use did not meet applicable requirements of American National Standards Institute, A10.3-1970, Safety Requirements for Explosive Actuated Fastening Tools: Jobsite: All powder actuated tool users do not have Operator's Cards to substantiate their competentcy to operate these tools.
Recent events (2)
- — I (S) $2618
- — Z (S) $3740
1926.432 A01 I
- Issued
- Abate by
- Penalty
- Initial $3179.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1926.432(a)(1)(i): Conductors or equipment were located in damp or wet locations and were not identified for use in the operating environment: Jobsite: Third floor, south side A DeWalt chop saw electrical cord and an electrical extension cord lay in puddles of water. The saw was being used to cut metal framing materials.
Recent events (2)
- — I (O) $1000
- — Z (S) $3179
More inspections at COMPONENT ASSEMBLY SYSTEMS, INC.
PHILADELPHIA, PA—2026-03-25
COMPONENT ASSEMBLY SYSTEMS, INC.
PHILADELPHIA, PA—2026-02-26
COMPONENT ASSEMBLY SYSTEMS, INC.
PHILADELPHIA, PA—2022-06-10 00:00:00
COMPONENT ASSEMBLY SYSTEMS, INC.
NEW YORK, NY—2021-11-05 00:00:00
COMPONENT ASSEMBLY SYSTEMS, INC.
WASHINGTON, DC—2020-09-28 00:00:00
COMPONENT ASSEMBLY SYSTEMS, INC.
View COMPONENT ASSEMBLY SYSTEMS, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238130)
FAIRHOPE, AL—2026-07-16
FRANCISCO ARES
WOODHAVEN, MI—2026-07-16
G.J. PERELLI CO., L.L.C.
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
BERLIN, NJ—2026-07-16
URUS CONSTRUCTION CORPORATION
MERIDIAN, ID—2026-07-15
TRIPLE R CONSTRUCTION LLC
More inspections in MA
BELLINGHAM, MA—2026-07-16
BELLINGHAM DEPARTMENT OF PUBLIC WORKS
PLYMOUTH, MA—2026-07-15
TECH-ETCH, INC.
WESTFIELD, MA—2026-07-15
BOISE CASCADE BUILDING MATERIALS DISTRIBUTION, L.L.C.
QUINCY, MA—2026-07-15
UNITEDWOR VM CONTRACTOR CORP
FALL RIVER, MA—2026-07-15
CRESCO LABS, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336971189.