Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: CASTLE WOODWORKS

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CASTLE WOODWORKS in 799 SONTAG ROAD, BALLWIN, MO 63021 (NAICS 321912). OSHA activity number 337145395.

Watch Castle Woodworks — free Get an email when a new federal OSHA severe-injury report for Castle Woodworks is published. One employer, no account, unsubscribe in one click.
Establishment
CASTLE WOODWORKS
Site address
799 SONTAG ROAD
City
BALLWIN
State
MO
ZIP
63021
Mailing
8684 OLIVE BLVD., SAINT LOUIS, MO 63132
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321912
Employees
4
Ownership type
A

4 citations on file for this inspection.

1910.334 A03 I

Serious Gravity 1 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $1020.00 · Current $714.00 Reduced
29 CFR 1910.334(a)(3)(i):     A flexible cord used with grounding type equipment did not contain an equipment grounding conductor:    a. An extension cord with a missing ground pin was used to energize a refrigerator (appliance was measured as carrying 25V on the exterior metal).    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • — I (S) $714
  • — Z (S) $1020

1910.304 G05

Serious Gravity 1 2 instances 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.304(g)(5):     The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective:    a. The power cord to the panel saw was missing a ground pin.    b. A 110 V outlet in the office was not providing equipment grounding (open ground).    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.304 A02

Serious Gravity 1 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.304(a)(2):     Grounded conductors were attached to terminals or leads so as to reverse designated polarity:    a. 110 V outlet in the shop, used to power the drill press and panel saw was wired with reverse polarity.    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.95 D01

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.95(d)(1):     When information indicated that any employee's exposure equaled or exceed the 8-hour time-weighted average of 85 decibels, the employer did not develop and implement a monitoring program:    a. Monitoring was not conducted to determine the need for a hearing conservation program, where saws and a planer were used at the shop; a radial arm saw was measured at 92 dBA, during operation.  (Note: the establishment of a hearing conservation program, including using hearing protection when operating equipment at or greater than 90 dBA, providing annual hearing tests, and providing annual training on the use and need for hearing protection, can be implemented instead of conducting 8 hr monitoring.)    Abatement certification and abatement documentation is required for this violation.  The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful.  The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View CASTLE WOODWORKS's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337145395.