OSHA Inspection: CHEROKEE NITROGEN COMPANY, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of CHEROKEE NITROGEN COMPANY, INC. in 1080 INDUSTRIAL DRIVE, CHEROKEE, AL 35616 (NAICS 325311). OSHA activity number 337423214.

Watch Cherokee Nitrogen Company, INC. — free Get an email when a new federal OSHA severe-injury report for Cherokee Nitrogen Company, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1080 INDUSTRIAL DRIVE
City
CHEROKEE
State
AL
ZIP
35616
Mailing
PO BOX 250, CHEROKEE, AL 35616
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325311
Employees
91
Ownership type
A

4 citations on file for this inspection.

1910.119 J02

Serious Gravity 10 1 instance 8 exposed
Issued
Penalty
Initial $6300.00 · Current $6300.00
29 CFR 1910.119(j)(2): The employer did not implement written procedures to maintain the on-going integrity of process equipment:    (a) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, the written procedure, "Nitric #9 Converter Installation" dated 1/20/86, was not implemented for proper bolt tightening when changing the platinum catalyst gauze at the 212-A converter (top hat) and converter elbow flange.
Recent events (1)
  • — Z (S) $6300

1910.119 J04 IV

Other-than-serious 1 instance 8 exposed
Issued
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.119(j)(4)(iv): The employer did not document each inspection and test that was performed on process equipment:   (a) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, documentation was not available for PSV-001 and -002 on the High Pressure Condenser (9-223-C1). (b) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, documentation was not available for PSV-003 and -004 on the Coolant Chiller for Frick (9-223-C2). (c) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, documentation was not available for PSV-005 and -006 on the Coolant Chiller for Frick (9-223-F1). (d) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, documentation was not available for PSV-007 and -008 on the Frick Compressor (9-223-J).
Recent events (1)
  • — Z (O) $0

1910.147 C06 II

Other-than-serious 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed:  (a) On or about 4/22/13 - at 1080 Industrial Dr., Cherokee, AL, the employer did not certify that periodic inspections had been performed.
Recent events (1)
  • — Z (O) $0

1910.147 D01

Other-than-serious 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.147(d)(1): The authorized employee did not have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy before the authorized or affected employee turned off the machine or equipment:  (a) On or about 11/13/12 - at Urea reactor 1303-D, the isolation package 1303-D (Urea Reactor) procedure #42IP006 dated 1/31/12, that was used in conjunction with a completed line breaking permit, did not inform employees of the magnitude of energy being controlled.
Recent events (1)
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337423214.