Safety Incidents OSHA Severe Injury Reports · 2015–2025
3,913,242Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: HUELSMANN & SWEENEY CONSTRUCTION COMPANY, INC.

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of HUELSMANN & SWEENEY CONSTRUCTION COMPANY, INC. in 800 ZORN AVE VA-OEF-OIF POLY-TRAUMA CLINICAL ADDITION, LOUISVILLE, KY 40206 (NAICS 238120). OSHA activity number 337693618.

Watch Huelsmann & Sweeney Construction Company, INC. — free Get an email when a new federal OSHA severe-injury report for Huelsmann & Sweeney Construction Company, INC. is published. One employer, no account, unsubscribe in one click.
Site address
800 ZORN AVE VA-OEF-OIF POLY-TRAUMA CLINICAL ADDITION
City
LOUISVILLE
State
KY
ZIP
40206
Mailing
1515 E ST JOE RD, SELLERSBURG, IN 47172
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238120
Employees
4
Ownership type
A

3 citations on file for this inspection.

1926.1425 C02

Serious Gravity 5 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $2100.00 Reduced
29 CFR 1926.1425(c)(2):     29 CFR 1926.1425(c)(2): The employer did not make sure that hooks with self-closing latches were used while employees were hooking, unhooking, or guiding the load.          a) VA OEF/OIF Poly-Trauma Clinical Addition - On or about 12/5/12, the safety latch on the crane was damaged and did not close completely exposing employees to struck-by hazards.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $2100
  • — Z (S) $3500

1910.1200 E01

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(e)(1):     The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:    (a) VA OEF/OIF POly- Trauma Clinical Addition - On or about 12/5/12, the employer did not maintain a written hazard communication program at the work-site.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.1200 G08

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.1200(g)(8):     The employer did not maintain copies of the required material safety data sheets for each hazardous chemical in the workplace: (Construction Reference: 1926.59)    a) VA OEF/OIF Poly-Trauma Clinical Addition - On or about 12/5/12, the MSDS for the Low Hydrogen Welding Rods was not available at the workplace.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337693618.