ROGERS, AR —
OSHA Inspection: DON'S COLD STORAGE & TRANSPORTATION LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DON'S COLD STORAGE & TRANSPORTATION LLC in 801 W. EASY ST., ROGERS, AR 72756 (NAICS 493120). OSHA activity number 337798425.
Where did this inspection happen?
- Establishment
- DON'S COLD STORAGE & TRANSPORTATION LLC
- Site address
- 801 W. EASY ST.
- City
- ROGERS
- State
- AR
- ZIP
- 72756
- Mailing
- POB 1924, ROGERS, AR 72756
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 493120
- Employees
- 58
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.119 E05
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $3200.00 Reduced
General-duty citation text
29 CFR 1910.119(e)(5): The employer did not establish a system to assure that the process hazard analysis team's recommendations are resolved in a timely manner and that the resolution is documented: The employer does not ensure that the process hazard analysis teams recommendations are resolved in a timely manner and that the resolution(s) is documented. The violation occurred in the Phase I engine room where the employer failed to ensure that the 2009 Phase I & II process hazard analysis teams recommendations were resolved in a timely manner and that the resolution(s) were documented. This condition exposed employees to inhalation hazards. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure that the process hazard analysis teams recommendations are resolved in a timely manner and that the resolution is documented.
Recent events (2)
- — I (S) $3200
- — Z (S) $4900
1910.119 I01
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $3200.00 Reduced
General-duty citation text
29 CFR 1910.119(i)(1): The employer did not perform a pre-startup safety review for new facilities. The employer does not ensure a pre-startup safety review is completed for new facilities. The violation occurred in the Phase II cold storage facility where the employer failed to ensure that a pre-startup safety review was completed before the startup of the Phase II ammonia refrigeration system. This condition exposed employees to inhalation hazards. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure a pre-startup safety review is conducted for new or modified facilities.
Recent events (2)
- — I (S) $3200
- — Z (S) $4900
1910.119 L02 V
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(l)(2)(v): The written procedures to manage changes did not assure that the authorization requirements for the proposed change were addressed prior to any change. The employer does not ensure written procedures to manage changes assured that the authorization requirements for the proposed change were addressed prior to the any change. The violation occurred in the Phase II cold storage facility where the employer failed to ensure written procedures to manage changes assured that the authorization requirements for the proposed change(s) were addressed prior to the addition of the Phase II ammonia refrigeration system. This condition exposed employees to inhalation hazards. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure written procedures to manage changes assured that the authorization requirements for the proposed change were addressed prior to the any change.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 J02
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $3200.00 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment. The employer does not ensure written procedures are established and implemented to maintain the on-going mechanical integrity of process equipment. a. The violation occurred in the Phase I & II engine rooms where the employer failed to ensure detailed written procedures were established and implemented for testing of safety cutouts. Identified cutouts include but are not limited to Compressor Discharge High/Low Pressure, Compressor High/Low Oil Pressure Differential, Compressor High Discharge Temperature, and High/Low Vessel Levels. This condition exposed employees to inhalation hazards. b. The violation occurred in the Phase I & II engine rooms where the employer failed to ensure detailed written procedures were established and implemented for testing of engine room safety systems. Identified engine room safety systems include but are not limited to Emergency Ventilation, ammonia detectors & calibration, and the emergency stop (e-stop). This condition exposed employees to inhalation hazards. c. The violation occurred in the Phase I & II engine rooms where the employer failed to ensure detailed written procedures were established and implemented for determining locations for conducting thickness measurements of piping and vessels. This condition exposed employees to inhalation hazards. d. The violation occurred in the Phase I & II engine rooms where the employer failed to ensure detailed written procedures were established and implemented for the visual external inspections of insulated piping and vessels. This condition exposed employees to inhalation hazards. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure written procedures are established and implemented to maintain the on-going mechanical integrity of process equipment.
Recent events (2)
- — I (S) $3200
- — Z (S) $4900
1910.119 J04 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.119(j)(4)(ii): Inspections and testing procedures performed on process equipment to maintain its mechanical integrity, did not follow recognized and generally accepted good engineering practices. The employer does not ensure inspections and tests performed on process equipment to maintain its on-going mechanical integrity followed recognized and generally accepted good engineering practices. The violation occurred in the Phase I & II engine rooms where the employer failed to ensure inspection and tests of ammonia refrigeration equipment cutouts and emergency shutdown system(s) followed recognized and generally accepted good engineering practices such as IIAR Bulletin 110. Identified cutouts include but are not limited to Compressor Discharge High/Low Pressure, Compressor High/Low Oil Pressure Differential, Compressor High Discharge Temperature, High/Low Vessel Levels, and Engine Room Emergency Stop (e-stop). This condition exposed employees to inhalation hazards. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure inspections and tests performed on process equipment to maintain its on-going mechanical integrity followed recognized and generally accepted good engineering practices.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.119 J05
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (as defined by process information in 29 CFR 1910.119(d) before further use or in a safe and timely manner. The employer does not ensure deficiencies are corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner. The violation occurred in the Phase I engine room where the employer failed to ensure deficiencies with the engine room emergency shutdown system(s) were corrected before further use or in a safe and timely manner. This condition exposed employees to inhalation hazards. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure deficiencies are corrected in equipment that is outside acceptable limits before further use or in a safe and timely manner.
Recent events (2)
- — I (S) $0
- — Z (S) $4900
More inspections at DON'S COLD STORAGE & TRANSPORTATION LLC
ROGERS, AR—2011-01-24 00:00:00
DON'S COLD STORAGE & TRANSPORTATION LLC
View DON'S COLD STORAGE & TRANSPORTATION LLC's full OSHA safety record →
More inspections in this industry (NAICS 493120)
NEWPORT, MI—2026-07-15
MEIJER DISTRIBUTION CENTER FACILITY
BIGLERVILLE, PA—2026-07-10
BREAM BEAR ORCHARDS
BIGLERVILLE, PA—2026-07-10
BREAM BEAR ORCHARDS
PLANT CITY, FL—2026-07-01
AMERICOLD LOGISTICS, LLC.
KELLER, TX—2026-07-01
KROGER TEXAS L.P.
More inspections in AR
SILOAM SPRINGS, AR—2026-07-15
CR CRAWFORD CONSTRUCTION LLC
VAN BUREN, AR—2026-07-14
MILLAR PARTNERS, LLC
BRINKLEY, AR—2026-07-14
ROGER WILKISON FARMS PARTNERSHIP
SEARCY, AR—2026-07-14
MASTER?S PLASTERING & MORE INC
LITTLE ROCK, AR—2026-07-09
NABHOLZ CONSTRUCTION CORPORATION
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337798425.