VALLEY STREAM, NY —
OSHA Inspection: NORTH EASTERN PRECAST LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of NORTH EASTERN PRECAST LLC in 14 BROOKLYN AVENUE, VALLEY STREAM, NY 11581 (NAICS 238120). OSHA activity number 338042815.
Where did this inspection happen?
- Establishment
- NORTH EASTERN PRECAST LLC
- Site address
- 14 BROOKLYN AVENUE
- City
- VALLEY STREAM
- State
- NY
- ZIP
- 11581
- Mailing
- 3963 STATE HIGHWAY 5S, FULTONVILLE, NY 12072
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238120
- Employees
- 22
- Ownership type
- A
Citations
13 citations on file for this inspection.
1926.100 A
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $2940.00 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: (a) 14 Brooklyn Avenue, Valley Stream, NY (Worksite), east side of building, third floor -Employees setting precast concrete floor planks were working near and directly below the suspended load without protective helmets, on or about December 1, 2012. Note: Instance (a): Because abatement for this item has already been documented the employer need not submit abatement certification or documentation for this item in accordance with 29 CFR 1903.19. (b) Worksite, traveled way of Brooklyn Avenue - The employee positioning crane counterweights on the flatbed truck was working near and directly below the booms two JLG Lull Telehandler Rough Terrain Fork Lifts # 6 and # 10, Model # 1044c-54 Series II, Serial #'s 0160013049 and 0160029366, without a protective helmet, on or about December 6, 2012. Note: Instance (b): In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $2940
- — C (S) $4900
- — Z (S) $4900
1926.251 A02 III
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $1680.00 Reduced
General-duty citation text
29 CFR 1926.251(a)(2)(iii): The employer failed to ensure that rigging without affixed, legible identification markings, required by paragraph (a)(2)(i) of this section was not used. (a) Worksite, traveled way of Brooklyn Ave and east side of third floor - The wire rope slings used to rig and hoist precast concrete floor planks did not have permanently affixed markings indicating the safe working load, on or about December 1, 2012. (b) Worksite, traveled way of Brooklyn Ave and east side of third floor - The two legged wire rope spreader assembly used between the crane hook and the wire rope slings on the load being hoisted did not have permanently affixed markings indicating the safe working load, on or about December 1, 2012. Note - Instances (a) and (b): Because abatement for these items has already been documented the employer need not submit abatement certification or documentation for these items in accordance with 29 CFR 1903.19. (c) Worksite, traveled way of Brooklyn Ave - The endless wire rope sling used to load the crane counterweights, which weighed 10 tons (20,000 pounds.), did not have permanently affixed markings indicating the safe working load, on or about December 6, 2012. Note - Instance (c): In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $1680
- — C (S) $4900
- — Z (S) $4900
1926.251 C09
- Issued
- Abate by
- Penalty
- Initial $3500.00 · Current $1540.00 Reduced
General-duty citation text
29 CFR 1926.251(c)(9): Slings were not padded or protected from the sharp edges of their loads: (a) Worksite, traveled way of Brooklyn Ave and east side of third floor - The wire rope slings used to hoist precast concrete floor planks, weighing up to approximately 11,000 pounds, were not protected from the sharp edges of the precast concrete floor planks, on or about December 1, 2012. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $1540
- — C (S) $3500
- — Z (S) $3500
1926.416 A03
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $1540.00 Reduced
General-duty citation text
29 CFR 1926.416(a)(3): When and where energized circuits existed, the employer failed to post and maintain proper warning signs, advise employees of the location, hazard involved and the proper protective measures to be taken: (a) 14 Brooklyn Avenue, Valley Stream, NY (Worksite), north and east sides of building, second and third floors - Signs were not posted identifying the locations of the overhead primary and secondary power lines that were in close proximity to the building. In addition, the employer did not warn employees about the hazards or the proper protective measures to be taken when they worked in close proximity to the overhead primary and secondary power lines, at times prior to and including December 21, 2012. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $1540
- — C (S) $4900
- — Z (S) $4900
1926.602 C01 VI
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $2590.00 Reduced
General-duty citation text
29 CFR 1926.602(c)(1)(vi): Industrial truck(s) in use did not meet the applicable requirements of design, construction, stability, inspection, testing, maintenance, and operation, as defined in American National Standards Institute B56.1-1969, Safety Standards for Powered Industrial Trucks. (a) Worksite, traveled of Brooklyn Avenue way - The JLG Lull Telehandler Rough Terrain Fork Lifts # 6 and # 10, Model # 1044c-54 Series II, Serial #'s 0160013049 and 0160029366, used to load the crane counterweights onto a flatbed truck were operated beyond the rated load capacity, on or about December 6, 2012. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $2590
- — C (S) $4900
- — Z (S) $4900
1926.701 B
- Issued
- Abate by
- Penalty
- Initial $2100.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1926.701(b): All protruding reinforcing steel, onto and/or into which employees could fall, was not guarded to eliminate the hazard of impalement: (a) Worksite, east side of building, third floor - The rebar extending from the masonry block wall was not guarded where precast concrete floor planks were being set, on or about December 1, 2012. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $1400
- — C (S) $2100
- — Z (S) $2100
1926.1408 E
- Issued
- Abate by
- Penalty
- Initial $4900.00 · Current $2590.00 Reduced
General-duty citation text
29 CFR 1926.1408(e): The employer did not assume that all power lines were energized and did not confirm with the utility owner/operator that the power line had been and continued to be de-energized and visibly grounded at the worksite. (a) Worksite, Fourth Street overhead power lines, east side of building - The employer assumed the overhead primary and secondary power lines located on Fourth Street were de-energized where the Liebherr Mobile Crane, Model # LTM 1220-5.2 268 Ton, Serial # 070 495, was operating, on or about December 1, 2012. (b) Worksite, Brooklyn Avenue overhead power lines, east side of building - The employer did not confirm with the utility owner/operator the overhead power lines located on Brooklyn Avenue continued to be de-energized where the Liebherr Mobile Crane, Model # LTM 1220-5.2 268 Ton, Serial # 070 495, was operating, on or about December 1, 2012. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $2590
- — C (S) $4900
- — Z (S) $4900
1926.1408 G01
- Issued
- Abate by
- Penalty
- Initial $3500.00 · Current $1540.00 Reduced
General-duty citation text
29 CFR 1926.1408(g)(1): The employer did not train each operator and crew member assigned to work with the equipment on all of the following; parts (g)(1)(i) thru (g)(1)(v) of this standard. (a) Worksite, east side, third floor - Employees were setting precast concrete floor planks with the Liebherr Mobile Crane, Model # LTM 1220-5.2 268 Ton, Serial # 070 495, within 8 feet of overhead primary and secondary power lines. The primary power lines were energized with 13,200 volts (13 kV) phase to phase. The secondary power lines were energized with 120 - 240 volts phase to ground.The employees were not trained to recognize the hazards; the methods to prevent contact; or the procedures to follow in the event that contact was made with the power lines, on or about December 1, 2012. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $1540
- — C (S) $3500
- — Z (S) $3500
1926.1412 C01
- Issued
- Abate by
- Penalty
- Initial $3500.00 · Current $2590.00 Reduced
General-duty citation text
29 CFR 1926.1412(c)(1): Upon completion of assembly, the equipment was not inspected by a qualified person to assure that it is configured in accordance with manufacturer equipment criteria. (a) Worksite, traveled way of Brooklyn Ave - The Liebherr Mobile Crane, Model # LTM 1220-5.2 268 Ton, Serial # 070 495, was not inspected by a qualified person after it was assembled, on or about December 1, 2012. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $2590
- — C (S) $3500
- — Z (S) $3500
1926.1424 A02 II
- Issued
- Abate by
- Penalty
- Initial $3500.00 · Current $2590.00 Reduced
General-duty citation text
29 CFR 1926.1424(a)(2)(ii): To prevent employees from entering hazard areas, the employer did not erect and maintain control lines, warning lines, railings or similar barriers to mark the boundaries of the hazard areas and/or did not train each employee to understand what these markings signify. (a)Worksite, traveled way of Brooklyn Ave - The swing radius boundary around the Liebherr Mobile Crane, Model # LTM 1220-5.2 268 Ton, Serial # 070 495, was not marked to prevent employees from entering the hazardous area, on or about December 1, 2012. Note: Because abatement for this item has already been documented the employer need not submit abatement certification or documentation for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (S) $2590
- — C (S) $3500
- — Z (S) $3500
1926.416 A01
- Issued
- Abate by
- Penalty
- Initial $49000.00 · Current $49000.00
General-duty citation text
Instances (a) thru (d) are related to the overhead, 3-phase primary and secondary power lines and transformers, which were energized with 13,200 volts (13 kV) phase to phase. The overhead power lines run north and south, along the west side of Fourth Street with respect to the building under construction at 14 Brooklyn Avenue. (a) Worksite, north and east sides of building, third floor - Employees that installed the Engineered Fall Protection System along the north and east sides of the third floor worked directly below the overhead primary power line, which was approximately 3 feet above their heads. The primary power lines were energized with 7,620 volts (7.5 kV) phase to ground, on December 3, 2012. (b) Worksite, north and east sides of building, third floor - Employees constructed the masonry block wall directly below the overhead primary power line, which was energized with 7,620 volts (7.5 Kv) phase to ground. At times the employees were working approximately 12 inches below the power line, on or about December 4, 2012. (c) Worksite, northeast corner of building, third floor - Employees constructed the masonry block wall between the overhead primary power lines and near the secondary power lines. The primary power lines were energized with 13,200 volts (13 Kv) phase to phase. The secondary power lines were energized with 120 - 240 volts phase to ground. At times, employees were working approximately 4 inches from the primary power lines and approximately 14 inches from the secondary power lines, on or about December 5, 2012. (d) Worksite, north side of building, third floor - Employees constructed the masonry block wall around an overhead primary power line, which was energized with 7,620 volts (7.5 Kv) phase to ground. At times, the employees were working approximately 4 inches from the power line, on or about December 5, 2012. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (W) $49000
- — C (W) $49000
- — Z (W) $49000
1926.1408 A02
- Issued
- Abate by
- Penalty
- Initial $49000.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1926.1408(a)(2): The equipment's maximum working radius could get closer than 20 feet to a power line and the employer did not meet the requirements in Option (1), Option (2), or Option (3) of this section: (a) Worksite, east side of building, third floor - Employees hoisted and set precast concrete floor planks with a Liebherr Mobile Crane, Model # LTM 1220-5.2 268 Ton, Serial # 070 495, where the rigging came within approximately 8 feet of the overhead primary and secondary power lines operating up to 13,200 volts (13 Kv) phase to phase, on or about December 1, 2012. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (W) $0
- — C (W) $49000
- — Z (W) $49000
1926.502 K03
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.502(k)(3): A copy of the fall protection plan with all approved changes was not maintained at the jobsite. (a) Worksite, east side of building, third floor Employees engaged in precast erection operations were utilizing a controlled access zone, which required the employer to maintain a copy of the fall protection plan at the worksite. The employer was not maintaining a copy of the fall protection plan at the worksite, on or about December 1, 2012. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
- — R (O) $0
- — C (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 238120)
EL PASO, TX—2026-07-15
SURE STEEL
NAMPA, ID—2026-07-15
ELITE STEEL ERECTORS, LLC
GARDENDALE, AL—2026-07-09
ANDINO'S IRON WORKERS, LLC
MIDLOTHIAN, VA—2026-07-09
B & J STEEL CONSTRUCTION, INC.
LYNCHBURG, VA—2026-07-09
GRAY'S WELDING LLC
More inspections in NY
MAYVILLE, NY—2026-07-16
MAYVILLE VILLAGE DPW
NEW HYDE PARK, NY—2026-07-16
NORTH HEMPSTEAD TN MICHAEL J TULLY PARK
CONESUS, NY—2026-07-16
CONESUS TN HIGHWAY DEPT
COMSTOCK, NY—2026-07-15
NYSDOCCS WASHINGTON CORRECTIONAL FACILITY
BALDWINSVILLE, NY—2026-07-15
LYSANDER TOWN HIGHWAY DEPARTMENT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338042815.