Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: SGA CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SGA CONSTRUCTION, INC. in 2418 NORTHWEST HIGHWAY, ARLINGTON HEIGHTS, IL 60005 (NAICS 238160). OSHA activity number 338188030.

Watch SGA Construction, INC. — free Get an email when a new federal OSHA severe-injury report for SGA Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2418 NORTHWEST HIGHWAY
City
ARLINGTON HEIGHTS
State
IL
ZIP
60005
Mailing
8631 S. NEWLAND AVE., BURBANK, IL 60459
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
9
Ownership type
A

6 citations on file for this inspection.

1926.501 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $3080.00 · Current $1264.00 Reduced
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems:    a) Employees were exposed to the hazard of falling while disposing of roofing materials and debris at the roof edge where fall protection had not been provided.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1264
  • — Z (S) $3080

1926.502 F01 III

Serious Gravity 5 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $2200.00 · Current $880.00 Reduced
29 CFR 1926.502(f)(1)(iii): Points of access, materials handling areas, storage areas, and hoisting areas were not connected to the work area by an access path formed by two warning lines:    a) Warning lines were not used to create access paths connecting the work area to the point of access at the edge of the roof.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $880
  • — Z (S) $2200

1926.502 F04

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $3080.00 · Current $1232.00 Reduced
29 CFR 1926.502(f)(4):  Mechanical equipment on roofs was used or stored only in areas where employees were not protected by a warning line system, guardrail system, or personal fall arrest system:    a) Employees were exposed to the hazard of falling while operating mechanical equipment without the benefit of fall protection.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1232
  • — Z (S) $3080

1926.552 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2200.00 · Current $880.00 Reduced
29 CFR 1926.552(a)(1):  The employer did not comply with the manufacturer's specifications and limitations applicable to the operation of all hoists and elevators:    a) A manually operated material handling hoist at the roof edge was counterweighted with rolled roofing materials and not with approved counterweights.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $880
  • — Z (S) $2200

1926.501 B10

Repeat Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $15400.00 · Current $6160.00 Reduced
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system.  Or, on roofs 50-feet (15.25 m) or less in width, each employee was not protected by use of a monitoring system:    a) Employees were not protected from the hazard of falling from the edge of the roof deck while engaged in roofing activities without the use of fall protection or safety monitoring.    SGA Construction, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.501(b)(10) which was contained in OSHA inspection number 312597750, citation number 1, item number 1, and was affirmed as a final order on September 1, 2009, with respect to a worksite located at 902 S. Kostner Ave., Chicago, Illinois.    SGA Construction, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.501(b)(10) which was contained in OSHA inspection number 312624695, citation number 1, item number 1, and was affirmed as a final order on December 17, 2008, with respect to a worksite located at Lake Cook Road and Prarie Court, Northbrook, Illinois.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (R) $6160
  • — Z (R) $15400

1926.503 B01

Other-than-serious 9 instances 9 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer:    a) The employer did not prepare written certification records related to employee fall protection training.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View SGA CONSTRUCTION, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338188030.