SPRINGFIELD, MO —
OSHA Inspection: MCCOY IRON AND METAL INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MCCOY IRON AND METAL INC. in 321 N. FORT, SPRINGFIELD, MO 65802 (NAICS 423930). OSHA activity number 338482433.
Where did this inspection happen?
- Establishment
- MCCOY IRON AND METAL INC.
- Site address
- 321 N. FORT
- City
- SPRINGFIELD
- State
- MO
- ZIP
- 65802
- Mailing
- 321 N. FORT, SPRINGFIELD, MO 65802
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 423930
- Employees
- 33
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $2380.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) The specific procedures for the equipment like the Down Stroke Baler have not been revised anually.
Recent events (2)
- — I (S) $0
- — Z (S) $2380
1910.305 B01 II
- Issued
- Abate by
- Penalty
- Initial $2380.00 · Current $1190.00 Reduced
General-duty citation text
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: (a) At the copper storage box: Electrical box 2 knock out was not effectively closed.
Recent events (2)
- — I (S) $1190
- — Z (S) $2380
1910.305 G02 III
- Issued
- Abate by
- Penalty
- Initial $2380.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: (a) At the maintenance shop: The welding machine had the cables broken from the strain relief.
Recent events (2)
- — I (S) $0
- — Z (S) $2380
1910.1200 E01 I
- Issued
- Abate by
- Penalty
- Initial $1785.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.1200(e)(1)(i): The written hazard communication program did not include a list of the hazardous chemicals known to be present, using an identity that was referenced on the appropriate material safety data sheet: (a) At the office and the maintenance shop: The hazard communication program did not have a list of chemicals.
Recent events (2)
- — I (S) $0
- — Z (S) $1785
More inspections in this industry (NAICS 423930)
DETROIT, MI—2026-07-15
STRONG STEEL PRODUCTS, LLC
OGDEN, UT—2026-07-10
TEAR A PART AUTO RECYCLING
GARNER, NC—2026-07-09
161490 - CAROLINA METAL RECYCLERS, LLC
JOPLIN, MO—2026-07-07
SERVICE RECYCLING - NORTH PLANT
HOLBROOK, NY—2026-07-01
ARROW SCRAP CORPORATION
More inspections in MO
CLINTON, MO—2026-07-14
TORCHYLO BUILDERS, LLC.
KANSAS CITY, MO—2026-07-09
NIAGARA BOTTLING
MONETT, MO—2026-07-09
MONETT METALS INC.
PARKVILLE, MO—2026-07-08
SKY-TECH ROOFING, LLC.
SPRINGFIELD, MO—2026-07-07
D & C CONSTRUCTION, LLC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338482433.