NEWINGTON, CT —
OSHA Inspection: SOUSA CORP.
Referral inspection · Health discipline
At a glance
On , OSHA opened a referral health inspection of SOUSA CORP. in 565 CEDAR STREET, NEWINGTON, CT 06111 (NAICS 332811). OSHA activity number 338685233.
Where did this inspection happen?
- Establishment
- SOUSA CORP.
- Site address
- 565 CEDAR STREET
- City
- NEWINGTON
- State
- CT
- ZIP
- 06111
- Mailing
- 565 CEDAR STREET, NEWINGTON, CT 06111
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332811
- Employees
- 16
- Ownership type
- A
Citations
27 citations on file for this inspection.
1910.94 A03 I A
- Issued
- Abate by
- Penalty
- Initial $1200.00 · Current $600.00 Reduced
General-duty citation text
29 CFR 1910.94(a)(3)(i)(a): All air inlets and access openings were not baffled or so arranged that the combination of inward air flow and baffling would minimize the escape of abrasive or dust particles into an adjacent work area and visible spurts of dust. SANDBLASTING AREA: On or about February 26, 2013, duct tape was observed around the window and gloves on the Pulsar VI 1PH sandblaster manufactured by Zero Products Aerolyte Systems (S/N 48030) to prevent blast media from escaping from the blast chamber. Also, duct tape was observed around a section of the hose through which blast media passes.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1910.94 A03 I E 1
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.94(a)(3)(i)(e)(1): Door was not flanged and tight when closed. SANDBLASTING AREA: On or about February 26, 2013, the gasket around the door of the Pulsar VI 1PH sandblaster manufactured by Zero Products Aerolyte Systems (S/N 48030) was not intact resulting in an incomplete seal around the door.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.101 B
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1910.101(b): The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks were not in accordance with Compressed Gas Association Pamphlet P-1-1965, which is incorporated by reference as specified in CFR 1910.6: HEAT TREAT AREA, WEST WALL: On or about February 26, 2013, a compressed gas cylinder containing helium was not stored securely to prevent the cylinder from falling. (REFERENCE CGA P-1-1965 Section 3.3.1)
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1910.106 E02 IV D
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1910.106(e)(2)(iv)(d): Flammable or combustible liquids were not drawn from or transferred into vessels, containers, or portable tanks within a building only through a closed piping system, from safety cans, by means of a device drawing through the top, or from a container or portable tanks by gravity through an approved self-closing valve: BLACK OXIDE LINE: On or about February 26, 2013, a dip tank containing Pen Dip 300 was observed not to have a self-closing valve. Pen Dip 300 is composed of 75% medium aliphatic solvent naphtha and has a flash point of 145 deg F and a boiling point greater than 300 deg F thereby classifying it as a Category 4 Flammable Liquid.
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1910.106 E09 III
- Issued
- Abate by
- Penalty
- Initial $1200.00 · Current $600.00 Reduced
General-duty citation text
29 CFR 1910.106(e)(9)(iii): Combustible waste material and residues in a building or unit operating area were not kept to a minimum, stored in covered metal receptacles and disposed of daily: MEN'S LOCKER ROOM: On or about February 26, 2013, rags contaminated with Condursal 0090 which contains xylene were stored in an open metal pail with a cloth liner.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1910.124 J01 I
- Issued
- Abate by
- Penalty
- Initial $1200.00 · Current $600.00 Reduced
General-duty citation text
29 CFR 1910.124(j)(1)(i): Hoods and ductwork of the ventilation system were not inspected for corrosion or damage at least quarterly during operation: BLACK OXIDE LINE: On or about February 26, 2013, the ventilation system over the Tru Temp XL dip tank had not been inspected on a quarterly basis.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1910.124 J02 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.124(j)(2)(i): The employer did not ensure airflow was adequate at least quarterly during operation: BLACK OXIDE LINE: On or about February 26, 2013, the company did not perform quarterly inspections of exhaust airflow to ensure that it was adequate.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.124 J03
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.124(j)(3): Periodic inspections of all dipping and coating equipment, including covers, drains, overflow piping, and electrical and fire-extinguishing systems were not conducted, and deficiencies were not promptly corrected: BLACK OXIDE LINE: On or about February 26, 2013, the company had not developed and implemented an inspection program for the dip tanks. This process line consists of ten dip tanks. Tanks #1 (Presto Kleen HP) and #7 (Tru Temp XL) contain alkaline, corrosive liquids; tank #4 (Oxyprime XP) contains an acidic, corrosive, toxic liquid; and tank #11 (Pen Dip 300) contains a heated Category 4 flammable liquid. The remaining tanks contain rinse water.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.125 F01 I
- Issued
- Abate by
- Penalty
- Initial $2400.00 · Current $1200.00 Reduced
General-duty citation text
29 CFR 1910.125(f)(1)(i) : Fire protection required by this paragraph (f) was not provided for dip tank(s) having a capacity of at least 150 gallons (568 L) or a liquid surface area of at least 4 square feet (0.38 m^2): Black Oxide Line, Pen Dip 300 Tank: On or about February 26, 2013, a dip tank that contained solvent naphtha and light paraffinic petroleum oil (a Category 4 flammable liquid) was not provided with either an automatic fire suppression system or a cover that could close automatically in the event of a fire.
Recent events (2)
- — I (S) $1200
- — Z (S) $2400
1910.147 C04 II B
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. COMPANY-WIDE: On or about February 26, 2013, The company's Lockout/Tagout Program did not include machine-specific shutdown procedures for equipment including, but not limited to, heat treat furnaces such as Dow Furnace Company Model DWS-243630G, S/N HK-13.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1910.147 C06 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: COMPANY-WIDE: There was no documentation to show that the Lockout/Tagout Program implemented by the company in February 2009 had been subject to an annual review.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C07 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.147(c)(7)(i): The training program of the employer did not include all the training elements listed under Items A-C of 29 CFR 1910.147(c)(7)(i): COMPANY-WIDE: On or about February 26, 2013, the employer had not documented that authorized or affected employees had been trained in the elements of the company's Lockout/Tagout procedures.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.151 C
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.151(c): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use: BLACK OXIDE LINE: On or about February 5, 2013, a clear pathway to the emergency eyewash and shower was not available to employees working with corrosive chemicals in the dip coating line. Access was blocked by six containers of metal parts to be coated with black oxide.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1910.178 M05 I
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.178(m)(5)(i): When a powered industrial truck is left unattended, load engaging means were not fully lowered, controls were not neutralized, power was not shut off, and brakes set. SHIPPING/RECEIVING: On or about February 26, 2013, the parking brake on the Nissan fork truck was not set.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1910.178 P01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.178(p)(1): Powered industrial truck found to be in need of repair, defective, or in any way unsafe had not been taken out of service until restored to safe operating condition: RECEIVING AREA: On or about February 26, 2013, a Nissan Model CRGH02F30PV powered industrial truck was not removed from service for repair of the following items: (A) the truck was leaking either hydraulic fluid and/or transmission fluid (B) cardboard was used in lieu of a transparent overhead guard (C) only one strap was used to secure the propane cylinder
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.303 F01
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.303(f)(1): Each disconnecting means required by Subpart S of Part 1910 for motors and appliances was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: BOILER ROOM: On or about February 26, 2013, two manual disconnects were not labeled to indicate their purpose. One was identified as feeding a transformer and the other fed electrical panel LV4 on the other side of the wall.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1910.303 F02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: SHIPPING/RECEIVING AREA, EAST SIDE: On or about February 26, 2013, electrical panel LV4 was observed to be not legibly marked to indicate the purpose for each circuit breaker.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.303 G01 II
- Issued
- Abate by
- Penalty
- Initial $1200.00 · Current $600.00 Reduced
General-duty citation text
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage: COMPANY-WIDE: (A) On or about February 5, 2013, access to electrical panels LV4 and HV3 was blocked. Cardboard and styrofoam packing material was stored in front of and below the panel. Large furniture was stored in front of panel HV3. (B) On or about February 26, 2013, access to electrical panels on Column 00 and Column N7 was blocked. A work bench limited access to the panel on Column 00. The panel on Column N7 had only a 35-inch clearance to furnace T3.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1910.304 A02
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.304(a)(2): Grounded conductors were attached to terminals or leads so as to reverse designated polarity: COLUMN N8: On or about February 26, 2013, an electrical outlet mounted on Column N8 was observed to have reverse polarity.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1910.304 G05
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: On or about February 26, 2013, the following equipment was not adequately grounded thereby exposing employees to electric shock hazards: A. Column O0: A live outlet mounted on the column was not grounded. B. Furnace H7: An extension cord to the vacuum pump associated with this furnace was missing its ground pin.
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1910.305 B01 II
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: COLUMN O0: On or about February 26, 2013, the electrical panel mounted on Column O0 had unused openings that were not effectively closed.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1910.305 B02 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: On or about February 26, 2013, electrical boxes were not provided with suitable covers exposing employees to electric shock and burns: FURNACE H6: The panel and elbow were not covered FURNACE F2: The door on the junction box was left open NORTH HALLWAY: Electrical outlets had no covers
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.305 G01 IV
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $800.00 Reduced
General-duty citation text
29 CFR 1910.305(g)(1)(iv): Flexible cords and/ or cables were used for purposes prohibited by paragraphs (A) through (F) of 29 CFR 1910.305(g)(1)(iv): On or about February 26, 2013, flexible cords and cables were used in lieu of permanent wiring in the following locations: A. SANDBLASTING AREA: An extension cord was used to energize the Pulsar VI 1PH Zero Products Aerolyte Systems Sandblaster. B. COLUMN N8: An extension cord was used to energize a relocatable power tap in the hardness testing area. Plugged into the power tap were newage testing instruments and another relocatable power tap which energized a disc sanding table and a belt grinder C. FURNACE H7: The vacuum pump associated with this furnace was energized by an extension cord. D. NEAR FURNACE H2: A Ryobi Drill Press, DP-120, (S/N C032301200) was energized by a relocatable power strip.
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1910.305 G02 III
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: COLUMN O0: A receptacle was not attached to the column and no strain relief was provided. The strain from repeated use of the receptacle has resulted in exposed wiring.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1910.1026 D01
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1000.00 Reduced
General-duty citation text
29 CFR 1910.1026(d)(1): The employer with a workplace or work operation covered by this standard did not determine the 8-hour time-weighted average exposure for each employee exposed to chromium (VI): On or about April 11, 2013, the employer had not conducted a hazard determination to identify employee exposure to chromium (VI) resulting from stick welding of stainless and mild steel.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1910.1200 F05 I
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1910.1200(f)(5)(i): The employer did not ensure that each container of hazardous chemicals in the workplace was labeled, tagged or marked with the identity of the hazardous chemical(s) contained therein: A. BLACK OXIDE LINE: On or about February 5, 2013, the following tanks in the Black Oxide Line were either not labeled or mislabeled with regards to the identity of the contents: A1. Oxyprime XP Tank: The label on Tank #4 of the Black Oxide Line indicated that it contains oxalic acid. The MSDS provided by the employer indicates the ingredients are sulfamic acid, sodium fluoride, and sodium bisulfate. A2. Additional Rinse Tank: The label on Tank #10 of the Black Oxide Line indicated the contents to be Sheath WS12 Oil and that it contains mineral spirits. The employer indicated that it is a rinse tank added to the line when they switched to Pen Dip 300. A3. Tru Temp XL Tank: Tank # 7 in the Black Oxide Line is unlabeled. According to the MSDS provided by the employer, the contents include sodium hydroxide, sodium nitrate, and sodium nitrite. A4. Pen Dip 300 Tank: Tank #11 in the Black Oxide Line is unlabeled. According to the employer and the MSDS provided, the ingredients of Pen Dip 300 to be naphtha solvent, paraffinic oil, and paraffin waxes. Temperature of tank contents is 130 deg F. B. NEAR FURNACE H2: An unlabeled container was suspended from the bottom of a shopping cart used to support parts after they are removed from a quench oil tank containing Thermisol 1021 (mineral oil). The quench oil was allowed to drip off the parts, into a funnel made of cardboard which directs the dripping oil into the container. C. HARDNESS TESTING AREA: An unlabeled bucket of colorless liquid with an oil sheen was located on the floor below the LECO BG-20 Belt Grinder.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1910.1200 F05 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.1200(f)(5)(ii): The employer did not ensure that each container of hazardous chemicals in the workplace was labeled, tagged or marked with the appropriate hazard warnings: BLACK OXIDE LINE: On or about February 5, 2013, the following tanks in the Black Oxide Line were not labeled with the appropriate hazard warnings: A. Oxyprime XP Tank: Contains sulfamic acid and sodium fluoride making it corrosive and toxic. B. Pen Dip 300 Tank: Contains naphtha solvent, paraffinic oil, and paraffin waxes with a flash point of 145 deg F indicating it is flammable. C. Tru Temp XL Tank: Contains sodium hydroxide, sodium nitrate, and sodium nitrite. Solution is corrosive and an oxidizer.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 332811)
WATERBURY, CT—2026-05-06
THE NELSON HEAT TREATING COMPANY, INC.
CLINTON TOWNSHIP, MI—2026-05-05
SYNERGY ADDITIVE MANUFACTURING, LLC
LEBANON, OH—2026-04-28
FB ACQUISITION, LLC
LEBANON, OH—2026-04-28
FB ACQUISITION, LLC
EAST GRANBY, CT—2026-04-27
SPECIALTY STEEL TREATING, INCORPORATED
More inspections in CT
BRIDGEPORT, CT—2026-07-10
WRR, INC.
BERLIN, CT—2026-07-10
MMF CONSTRUCTION LLC
NAUGATUCK, CT—2026-07-08
WHITING-TURNER LCT2 JOINT VENTURE
SOMERS, CT—2026-07-08
F&G RECYCLING LLC
STAMFORD, CT—2026-07-07
FAIRFIELD AVENUE MAINTENANCE COMPANY, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338685233.