1,224,460Inspections Most recent open 2026-07-13 Last loaded 2026-07-16
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: EPOCH CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of EPOCH CORPORATION in ROUTE 106, PEMBROKE, NH 03275 (NAICS 321992). OSHA activity number 338808439.

Watch Epoch Corporation — free Get an email when a new federal OSHA severe-injury report for Epoch Corporation is published. One employer, no account, unsubscribe in one click.
Establishment
EPOCH CORPORATION
Site address
ROUTE 106
City
PEMBROKE
State
NH
ZIP
03275
Mailing
P.O. BOX 235, PEMBROKE, NH 03275
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321992
Employees
40
Ownership type
A

9 citations on file for this inspection.

5(a)(1)

Other-than-serious 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $0.00 Reduced
OSH ACT of 1970 Section (5)(a)(1): Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to struck-by hazards.    (a) Shop - Employees were exposed to the hazard of being struck by fallen material while using a below the hook lifting device (spreader bar) for lifting walls that was not labeled as to its capcity.
Recent events (3)
  • — C (S) $2800
  • — F (O) $0
  • — Z (S) $2800

1910.23 C01

Serious Gravity 5 2 instances 8 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $1750.00 Reduced
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent).    (a) Mezzadine - The railings were at 48" high.    (b) Wall Assembly Platform - The guardrails were at 30" high.
Recent events (3)
  • — C (S) $3500
  • — F (S) $1750
  • — Z (S) $3500

1910.132 F01 V

Serious Gravity 5 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.132(f)(1)(v): Employee(s) required to use PPE by this section were not trained to know the proper care, maintenance, useful life, and disposal of the PPE:    (a) Mezzadine - Employees were not trained in the proper inspection and maintenance of the fall protection equipment.
Recent events (3)
  • — C (S) $0
  • — F (S) $0
  • — Z (S) $0

1910.147 D01

Other-than-serious 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $4900.00 · Current $0.00 Reduced
29 CFR 1910.147(d)(1): The authorized employee did not have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy before the authorized or affected employee turned off.    (a) Shop - Eletrical disconnect was locked out by an unauthorized employee.    (b) Shop - Electrical circuit breaker was locked on by an unauthorized employee.
Recent events (3)
  • — C (S) $4900
  • — F (O) $0
  • — Z (S) $4900

1910.303 F02

Serious Gravity 5 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident:    (a) Shop - Electrical panels were not labeled.
Recent events (3)
  • — C (S) $0
  • — F (S) $0
  • — Z (S) $0

1910.151 C

Serious Gravity 5 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1910.151(c): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use:    (a) Shop - No eye wash station was located in the spray foam application area.
Recent events (3)
  • — C (S) $2800
  • — F (S) $1400
  • — Z (S) $2800

1910.178 A04

Serious Gravity 5 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1910.178(a)(4): Modifications and additions which affect capacity and safe operation of powered industrial truck were performed by the employer without the manufacturer's prior written approval:    (a) Shop - The man made lift basket was not approved by the fork lift manufactorer.
Recent events (3)
  • — C (S) $2800
  • — F (S) $1400
  • — Z (S) $2800

1910.303 B01

Serious Gravity 5 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $1750.00 Reduced
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees:    (a) Shop - Electrical equipment was covered with saw dust creating a fire hazard.
Recent events (3)
  • — C (S) $3500
  • — F (S) $1750
  • — Z (S) $3500

1910.303 B07 I

Serious Gravity 1 1 instance 8 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.303(b)(7)(i): Unused openings in boxes, raceways, auxiliary gutters, cabinets, equipment cases, or housings were not effectively closed to afford protection substantially equivalent to the wall of the equipment.    (a) Shop - The Beam Press electrical box had an unguarded opening.
Recent events (3)
  • — C (S) $0
  • — F (S) $0
  • — Z (S) $0

View EPOCH CORPORATION's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338808439.