Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: WASKOM GAS PROCESSING COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WASKOM GAS PROCESSING COMPANY in 155 PRIVATE ROAD 1133, WASKOM, TX 75692 (NAICS 211112). OSHA activity number 338937865.

Watch Waskom GAS Processing Company — free Get an email when a new federal OSHA severe-injury report for Waskom GAS Processing Company is published. One employer, no account, unsubscribe in one click.
Site address
155 PRIVATE ROAD 1133
City
WASKOM
State
TX
ZIP
75692
Mailing
155 PRIVATE ROAD 1133, WASKOM, TX 75692
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
211112
Employees
12
Ownership type
A

6 citations on file for this inspection.

1910.119 D03 II

Serious Gravity 5 3 instances 9 exposed
Issued
Abate by
Penalty
Initial $5000.00 · Current $5000.00
29 CFR 1910.119(d)(3)(ii):  The employer did not document that the equipment in the process complied with recognized and generally accepted good engineering practices.    The employer does not ensure it documented that equipment in the process complied with recognized and generally accepted good engineering practices.    The violation occurred in the Waskom Gas Plant on or about March 6, 2013 and times prior to where the employer failed to ensure administrative controls were in place to manage intervening block valve(s) to/from relief devices to ensure they were open during operation in accordance with ASME Boiler and Pressure Vessel Code, Division 1, Section VIII.  Identified relief devices include but are not limited to PSV-1842 (T-186) and PSV-2001 (PV-2001).  This condition exposed employees to fire and explosion hazards.      Pursuant to 29 C.F.R. 1903.19, within (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure administrative controls were in place to manage intervening block valve(s) to/from relief devices to ensure they were open during operation in accordance with recognized and generally accepted good engineering practices.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $5000

1910.119 F01

Serious Gravity 10 2 instances 9 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.119(f)(1):  The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with the process safety information:      The employer does not ensure written operating procedures are developed and implemented that provided clear instructions for safely conducting activities involved in each process.     The violation occurred on or about March 6, 2013 and times prior thereto in the Waskom Gas Plant where the employer failed to ensure written operating procedures were developed and implemented to provide instructions for the use of chains, locks, or car-seals to ensure the intervening block to/from relief devices were open during operation following a shutdown/turn around. Identified vessels include but not limited PSV-1842 (T-186) and PSV-2001 (PV-2001).    Pursuant to 29 C.F.R. 1903.19, within (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure written operating procedures are implemented that provide clear instructions for safely conducting activities in each process to maintain the on-going mechanical integrity of process equipment according to recognized and generally accepted good engineering practices.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 J02

Serious Gravity 10 2 instances 9 exposed
Issued
Abate by
Penalty
Initial $7000.00 · Current $7000.00
29 CFR 1910.119(j)(2):  The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment.        The employer does not ensure written procedures are established and implemented to maintain the on-going mechanical integrity of process equipment.       The violation occurred on or about March 6, 2013 and times prior thereto in the Waskom Gas Plant where the employer failed to ensure written procedures were established and implemented for testing of systems identified as safeguards in the process hazards analysis. Identified safeguards include but are not limited to TAH 107 and TAH 111. This condition exposed employees to fire and explosion hazards.       Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure written procedures are established and implemented to maintain the on-going mechanical integrity of process equipment.
Recent events (2)
  • — I (S) $7000
  • — Z (S) $7000

1910.119 J04 III

Serious Gravity 10 4 instances 9 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment was not consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience.        The employer does not ensure the frequency of inspections and tests performed on process equipment to maintain its on-going mechanical integrity followed recognized and generally accepted good engineering practices.       a.  The violation occurred on or about March 6, 2013 and times prior thereto in the Waskom gas plant where the employer failed to ensure the frequency of thickness measurements bulk liquid hydrocarbon storage vessels followed recognized and generally accepted good engineering practices such as API 510. Identified vessels include but are not limited to propane storage tank T-272 and the product surge tank (PV 108).  This condition exposed employees to fire and explosion hazards.       b.  The violation occurred on or about March 6, 2013 and times prior thereto in the West Memphis Terminal facility where the employer failed to ensure the frequency of thickness measurements of the bulk liquid hydrocarbon piping followed recognized and generally accepted good engineering practices such as API 570.  Identified piping includes but is not limited to piping HTP-00005 and HTP-00014.  This condition exposed employees to fire and explosion hazards.       Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure the frequency of inspections and tests performed on process equipment to maintain its on-going mechanical integrity followed recognized and generally accepted good engineering practices.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 J04 I

Serious Gravity 10 2 instances 9 exposed
Issued
Abate by
Penalty
Initial $7000.00 · Current $7000.00
29 CFR 1910.119(j)(4)(i):  Inspections and tests were not performed on process equipment to maintain its mechanical integrity.       The employer does not ensure inspections and tests are performed to maintain the on-going mechanical integrity of process equipment.      The violation occurred on or about March 6, 2013 and times prior thereto in the Waskom Gas Plant where the employer failed to ensure inspections and tests were performed on systems identified as safeguards in the process hazards analysis. Identified safeguards include but are not limited to TAH 107 and TAH 111. This condition exposed employees to fire and explosion hazards.      Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure inspections and tests are performed to maintain the on-going mechanical integrity of process equipment.
Recent events (2)
  • — I (S) $7000
  • — Z (S) $7000

1910.119 J05

Serious Gravity 10 1 instance 9 exposed
Issued
Abate by
Penalty
Initial $7000.00 · Current $7000.00
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits in a timely manner.    The employer does not correct deficiencies in equipment that are outside acceptable limits in a safe and timely manner.      The violation occurred on or about March 6, 2013 in Waskom Gas Plant where the employer failed to ensure facility siting deficiencies were addressed in a safe and timely manner.  This condition exposed employees to fire and explosion hazards.      Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing it is in compliance with the standard, including describing the steps it is taking to ensure that the control room deficiencies have been addressed and documented.
Recent events (2)
  • — I (S) $7000
  • — Z (S) $7000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338937865.