OSHA Inspection: GYPTECH SYSTEMS, INC.

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of GYPTECH SYSTEMS, INC. in 301 PROSPECT AVENUE, SYRACUSE, NY 13203 (NAICS 238310). OSHA activity number 338958069.

Watch Gyptech Systems, INC. — free Get an email when a new federal OSHA severe-injury report for Gyptech Systems, INC. is published. One employer, no account, unsubscribe in one click.
Site address
301 PROSPECT AVENUE
City
SYRACUSE
State
NY
ZIP
13203
Mailing
PO BOX 2700, LIVERPOOL, NY 13089
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238310
Employees
5
Ownership type
A

7 citations on file for this inspection.

1926.451 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1680.00 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used.      a) On or about 3/13/2013, N5 Elevation:  No safe access was provided for the rolling scaffold being used to apply fire proofing.    Abatement certification is required for this item.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

1926.451 F03

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1680.00 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:     a) On or about 3/13/2013, N5 Elevation:  No daily inspections were being performed on the rolling scaffold being used to apply fire proofing.     Abatement certification is required for this item.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

1926.451 F04

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1680.00 Reduced
29 CFR 1926.451(f)(4): Part(s) of a scaffold that were damaged or weakened, such that the scaffold's strength was less than that required by paragraph (a) of this section, were not immediately repaired, replaced, braced to meet those provisions, nor removed from service until repaired:    a) On or about 3/13/2013, N5 Elevation:  A caster locking mechanism was broken on the rolling scaffold being used to apply fire proofing.    Abatement certification is required for this item.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

1926.452 W02

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.452(w)(2): Scaffold casters and wheels were not locked with positive wheel and/or wheel and swivel locks, or equivalent means, to prevent movement of the scaffold while the scaffold was used in a stationary manner:  a) On or about 3/13/2013, N5 Elevation:  Casters were not locked while an employee was applying fireproofing from rolling scaffold.  Abatement certification is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VII

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1680.00 Reduced
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section:     a) On or about 3/13/2013, N5 Elevation:  A midrail was missing on one end of the rolling scaffold being used to apply fire proofing.     Abatement certification is required for this item.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

1926.452 W06 I

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1680.00 Reduced
29 CFR 1926.452(w)(6)(i): Employee(s) were allowed to ride on scaffolds when the surface on which the scaffold was moved was not within 3 degrees of level, and/or not free of pits, holes, and obstructions:     a) On or about 3/13/2013, N5 Elevation:  An employee was riding on a mobile scaffold used to apply fire proofing while near floor openings.     Abatement certification is required for this item.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

1926.452 W06 II

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.452(w)(6)(ii): The height to base width ratio of the scaffold during movement is two to one or less:   a) On or about 3/13/2013, N5 Elevation:  A mobile scaffold was in use with a width to height ratio of 2.7 while applying fire proofing.   Abatement certification is required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338958069.