NORTH SMITHFIELD, RI —
OSHA Inspection: JENKINS HOME IMPROVEMENTS, INC.
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of JENKINS HOME IMPROVEMENTS, INC. in 74 RIDGE ROAD, NORTH SMITHFIELD, RI 02896 (NAICS 238160). OSHA activity number 338992407.
Where did this inspection happen?
- Establishment
- JENKINS HOME IMPROVEMENTS, INC.
- Site address
- 74 RIDGE ROAD
- City
- NORTH SMITHFIELD
- State
- RI
- ZIP
- 02896
- Mailing
- 53 ADELAIDE DRIVE, CHEPACHET, RI 02814
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 4
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.451 G01 I
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold shall be protected by a personal fall arrest system: Worksite: Employees performing roofing activities in excess of six (6) feet above ground level on a ladder jack scaffold were not protected with the use of personal fall arrest system.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.1101 G08 II A
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1000.00 Reduced
9020
General-duty citation text
29 CFR 1926.1101(g)(8)(ii)(A): For removing roofing material which contains ACM the employer shall ensure that the following work practices are followed: Roofing material was not removed in an intact state to the extent possible: Worksite: When removing Asbestos-Containing Roofing Material (ACM), the employer did not ensure that it was removed in an intact state to the extent possible.
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1926.1101 G08 II B
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
9020
General-duty citation text
29 CFR 1926.1101(g)(8)(ii)(B): Wet methods shall be used to remove roofing materials that are not intact, or that will be rendered not intact during removal, unless such wet methods are not feasible or will create safety hazards: Worksite: When the employer removed asbestos-containing roofing shingles in an abrasive manner that rendered them non-intact, wet mentods were not used to control the resulting dust and debris.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 G08 II E
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
9020
General-duty citation text
29 CFR 1926.1101(g)(8)(ii)(E): Asbestos-containing material that has been removed from a roof shall not be dropped or thrown to the ground. Unless the material is carried or passed to the ground by hand, it shall be lowered to the ground via covered, dust-tight chute, crane or hoist: Worksite: When the employer abrasively removed asbestos-containing roofing shingles, they were not carried or passed to the ground by hand or lowered to the ground via a covered, dust-tight chute, crane, or hoist.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 G08 II F
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
9020
General-duty citation text
29 CFR 1926.1101(g)(8)(ii)(F): Upon being lowered, unwrapped material shall be transferred to a closed receptacle in such manner so as to preclude the dispersion of dust: Worksite: Upon removal of asbestos-containing roofing material, the employer disposed of it by, first, loading it into plastic garbage cans, then dumping these into an uncovered dumpster.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 K03 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
9020
General-duty citation text
29 CFR 1926.1101(k)(3)(i): Before work in areas containing ACM and PACM is begun; employers shall identify the presence, location, and quantity of ACM, and/or PACM therein pursuant to paragraph (k)(1) of this section: Worksite: Prior to the abrasive removal of asbestos-containing roofing material, the employer did not identify the presence, location, and quantity of asbestos-containing roofing material.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 O01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
9020
General-duty citation text
29 CFR 1926.1101(o)(1): On all construction worksites covered by this standard, the employer shall designate a competent person, having the qualifications and authorities for ensuring worker safety and health required by Subpart C, General Safety and Health Provisions for Construction (29 CFR 1926.20 through 1926.32): Worksite: Prior to the abrasive removal of asbestos-containing roofing material, the employer did not designate a competent person, who would have the qualifications and authorities to ensure worker safety as required by subpart C, General Safety and Health Provisions for Construction (29 CFR 1926.20 through 1926.32).
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 238160)
FAIRVIEW, TN—2026-07-16
MARVIN PINERA
CARSON CITY, NV—2026-07-16
UNKNOWN/INVALID ESTABLISHMENT
BANNOCKBURN, IL—2026-07-16
ROOFING H.P. LLC
LOXLEY, AL—2026-07-16
CARLOS CHE
BALTIMORE, MD—2026-07-16
VAL CONSTRUCTION INC
More inspections in RI
PAWTUCKET, RI—2026-07-16
INTERNATIONAL PACKAGING CORPORATION
WARWICK, RI—2026-07-16
LYON PROPERTY MANAGEMENT, LLC
LINCOLN, RI—2026-07-14
TFORCE FREIGHT
JOHNSTON, RI—2026-07-14
WEST BAY RESIDENTIAL SERVICES INC.
NEWPORT, RI—2026-07-10
STEVEN POSTHUMA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338992407.