OSHA Inspection: CDC CONSTRUCTION DEVELOPMENT

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of CDC CONSTRUCTION DEVELOPMENT in 4757 HIGHWAY 34, SHARPSBURG, GA 30277 (NAICS 236118). OSHA activity number 339034597.

Watch CDC Construction Development — free Get an email when a new federal OSHA severe-injury report for CDC Construction Development is published. One employer, no account, unsubscribe in one click.
Site address
4757 HIGHWAY 34
City
SHARPSBURG
State
GA
ZIP
30277
Mailing
60 FOX HOLLOW RUN, NEWNAN, GA 30263
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
4
Ownership type
A

5 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Penalty
Initial $1600.00 · Current $800.00 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports:    a) Sharpsburg, Church of the Nazarene - Employees were working on a scaffold system about 9 feet and 6 inches where the scaffold platform was not fully planked on the level the employees were installing rafters. Employees were exposed to a fall hazards from incomplete planking.
Recent events (2)
  • — I (S) $800
  • — Z (S) $1600

1926.451 C02 III

Serious Gravity 10 1 instance 2 exposed
Issued
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(c)(2)(iii): Unstable objects were used as working platforms:     a) Sharpsburg, Church of the Nazarene - Employees were working on a scaffold system about 9 feet and 6 inches high that was stacked with unstable object such as cement blocks.  The scaffold was missing mudsills and base plates on all sides of the scaffold system.  Employees were exposed to a collapsed and fall hazard.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 E01

Serious Gravity 10 1 instance 2 exposed
Issued
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(e)(1): scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.    a) Sharpsburg, Church of the Nazarene - Employees were working from a scaffold system that did not have a safe access point (i.e. ladder) installed for employee access and egress.  The employees were using the cross-bracing and end-rails to gain access to the upper platform of the scaffold system. Employees were exposed to a fall hazards.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 F03

Serious Gravity 5 1 instance 2 exposed
Issued
Penalty
Initial $2400.00 · Current $1200.00 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    a) Sharpsburg, Church of the Nazarene - The employer did not ensure that a competent person inspected the scaffold system for missing components such as but no limited to (ladder, crossbraces, mudsill and base plates and planking) before allowing the employees to use the equipment.  Employees were exposed to a collapse hazard.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2400

1926.452 C02

Serious Gravity 5 1 instance 2 exposed
Issued
Penalty
Initial $1600.00 · Current $800.00 Reduced
29 CFR 1926.452(c)(2): Tubular welded frame scaffold(s) were not properly braced by crossbracing or diagonal braces, or both, to secure vertical members laterally and to align them so that the erected scaffold was plumb, square, and rigid:    a) Sharpsburg, Church of the Nazarene - Employees were working from a scaffold system where cross bracing had not been installed on all sections of the scaffold system to prevent displacement.  One section had no cross bracing.
Recent events (2)
  • — I (S) $800
  • — Z (S) $1600

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339034597.