FISHKILL, NY —
OSHA Inspection: TRANSITIONAL BUILDERS INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of TRANSITIONAL BUILDERS INC. in 1132 MAIN ST, FISHKILL, NY 12524 (NAICS 236118). OSHA activity number 339082687.
Where did this inspection happen?
- Establishment
- TRANSITIONAL BUILDERS INC.
- Site address
- 1132 MAIN ST
- City
- FISHKILL
- State
- NY
- ZIP
- 12524
- Mailing
- 85 MARKET ST., POUGHKEEPSIE, NY 12601
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 8
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) 1132 Main Street, Fishkill, NY - On and prior to May 22, 2013, employees were exposed to a fall hazard of approximately 20' to ground level when performing masonry work from prefabricated frame scaffolding that was not fully planked.
Recent events (3)
- — F (S) $0
- — C (S) $2000
- — Z (S) $2000
1926.451 B05 II
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilevered end: a) 1132 Main Street, Fishkill, NY - On and prior to May 22, 2013, employees were exposed a fall hazard of approximately 20' to ground level when performing masonry work from prefabricated frame scaffolding due to the platform ends extending over the supports up to 28" on the first, second and third levels.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 G01 VII
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(g)(1)(vii): For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee was not protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: a) 1132 Main Street, Fishkill, NY - On and prior to May 22, 2013, employees were exposed to a fall hazard of approximately 20' to ground level when performing masonry work from prefabricated frame scaffolding missing end and mid-guard railing.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.452 C02
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.452(c)(2): Tubular welded frame scaffold(s) were not properly braced by cross bracing or diagonal braces, or both, to secure vertical members laterally and to align them so that the erected scaffold was plumb, square, and rigid: a) 1132 Main Street, Fishkill, NY - On and prior to May 22, 2013, employees were exposed to a fall hazard of approximately 20' to ground level when performing masonry work from prefabricated frame scaffolding that did not have all cross bracing and some cross bracing was not secured to the vertical supports.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.452 C04
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.452(c)(4): End frames of tubular welded frame scaffolding were not locked together vertically by use of pins or equivalent means in areas where uplift could occur: a) 1132 Main Street, Fishkill, NY - On and prior to May 22, 2013, employees were exposed to a fall hazard of approximately 18' to ground level when performing masonry work from prefabricated frame scaffolding that was missing a pin to lock tubular welded framing together. The scaffolding was subjected to uplift due to the use of a cantilever platform on the front side of the scaffolding.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 236118)
CORTLANDT MANOR, NY—2026-07-13
RJW RENOVATIONS, LLC
VANCOUVER, WA—2026-07-08
WA317991978 - DLS CONTRACTING INC
NEWPORT BEACH, CA—2026-07-08
DRAKE SMITH CONSTRUCTION
BRIDGEVILLE, PA—2026-07-08
EXTREME DECKS
COLUMBUS, OH—2026-07-07
QUALITY BUILDS OHIO LLC
More inspections in NY
POUGHKEEPSIE, NY—2026-07-13
MARCO BOARD HOUSE, INC.
CORTLANDT MANOR, NY—2026-07-13
LG BUILDERS INC.
CORTLANDT MANOR, NY—2026-07-13
RJW RENOVATIONS, LLC
HEMPSTEAD, NY—2026-07-13
NYSDOCCS NASSAU AREA OFFICE
NIAGARA FALLS, NY—2026-07-10
NTVI FEDERAL INC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339082687.