BRANDON, MS —
OSHA Inspection: SHELTON MASONRY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SHELTON MASONRY in 108 SILVERADO TRAIL, BRANDON, MS 39047 (NAICS 238140). OSHA activity number 339105520.
Where did this inspection happen?
- Establishment
- SHELTON MASONRY
- Site address
- 108 SILVERADO TRAIL
- City
- BRANDON
- State
- MS
- ZIP
- 39047
- Mailing
- 102 COBLESTONE COURT, CLINTON, MS 39056
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 4
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.100 A
- Issued
- Abate by
- Penalty
- Initial $1440.00 · Current $1440.00
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets. (a) Scaffold - On or about June 4, 2013 an employee was exposed to head injuries while working beneath another employee on the second level of a scaffold. Employees were not wearing hardhats. Employees on scaffold were laying bricks.
Recent events (1)
- — Z (S) $1440
1926.102 A01
- Issued
- Abate by
- Penalty
- Initial $1080.00 · Current $1080.00
General-duty citation text
29 CFR 1926.102(a)(1): Employees shall be provided with eye and face protection equipment when machines or operations present potential eye or face injury from physical, chemical, or radiation agents. (a) Scaffold- On or about June 4, 2013 an employee was exposed to eye injuries while dry cutting bricks without wearing eye protection.
Recent events (1)
- — Z (S) $1080
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $1440.00 · Current $1440.00
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: (a) Front of House - On or about June 4, 2013 employees were exposed to a fall hazard while working on a scaffold that was not fully decked or planked.
Recent events (1)
- — Z (S) $1440
1926.451 C02
- Issued
- Abate by
- Penalty
- Initial $1440.00 · Current $1440.00
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation. (a) Front of House - On or about June 4, 2013 employees were exposed to a fall hazard while working on a scaffold that had no base plates installed.
Recent events (1)
- — Z (S) $1440
1926.451 C02 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(c)(2)(i): Footings shall be level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement. (a) Front of House - On or about June 4, 2013 employees were exposed to a fall hazard while working on a scaffold that was not placed on a level, solid, firm, foundation. The scaffold showed signs of soil displacement.
Recent events (1)
- — Z (S) $0
1926.451 G04 I
- Issued
- Abate by
- Penalty
- Initial $1440.00 · Current $1440.00
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. (a) Front of House - On or about June 4, 2013 employees were exposed to a fall hazard while working on a scaffold 14.3 feet above ground without guardrails installed on all open sides.
Recent events (1)
- — Z (S) $1440
1926.451 E01
- Issued
- Abate by
- Penalty
- Initial $1440.00 · Current $1440.00
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access. (a) Front of House - On or about June 4, 2013 employees were exposed to a fall hazard while climbing on a welded metal frame scaffold. There was no ladder attached to scaffold. Employees were exposed to falling 14.3 feet to ground.
Recent events (1)
- — Z (S) $1440
More inspections at SHELTON MASONRY
AMARILLO, TX—2006-06-29 00:00:00
SHELTON MASONRY
BROKEN ARROW, OK—1989-05-09 00:00:00
SHELTON MASONRY
View SHELTON MASONRY's full OSHA safety record →
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16
DC MASONRY
WINNETKA, IL—2026-07-15
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14
PLANET DESIGN SERVICES, INC.
More inspections in MS
LAUREL, MS—2026-07-01
THERMO-KOOL
HORN LAKE, MS—2026-07-01
NEWLY WEDS FOODS, INC.
GAUTIER, MS—2026-07-01
DOUBLE R GAUTIER, LLC
OLIVE BRANCH, MS—2026-06-30
HYVE SOLUTIONS
GAUTIER, MS—2026-06-30
STEVE WILSON ENTERPRISE
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339105520.