OSHA Inspection: DEVINOS

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of DEVINOS in 2001 18TH. ST., NW, WASHINGTON, DC 20009 (NAICS 445310). OSHA activity number 339151185.

Watch Devinos — free Get an email when a new federal OSHA severe-injury report for Devinos is published. One employer, no account, unsubscribe in one click.
Establishment
DEVINOS
Site address
2001 18TH. ST., NW
City
WASHINGTON
State
DC
ZIP
20009
Mailing
2001 18TH. ST., NW, WASHINGTON, DC 20009
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
445310
Employees
5
Ownership type
A

12 citations on file for this inspection.

1910.22 A01

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.22(a)(1): All places of employment, passageways, storerooms, and service rooms were not kept clean and orderly and in a sanitary condition.  a) The basement area where employees need to access certain goods are cluttered with no path of travel which creates tripping hazards, on or about 06/27/13.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.22 A02

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.22(a)(2): The floor of every workroom was not maintained in a clean and, so far as possible, a dry condition.   a) Employees access the walk-in keg cooler where there is standing water creating a slip hazard, on or about 06/27/13.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.23 D01 I

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.23(d)(1)(i): On stairways less than 44 inches wide having both sides enclosed, at least one handrail was not provided, preferably on the right side descending.  a) Employees use a set of stairs, 11 risers in height, with no handrail to access the basement, on or about 06/27/13.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.36 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.36(b)(1): At least two exit routes were not available in the workplace to permit prompt evacuation of employees and other building occupants during an emergency, except as allowed in paragraph (b)(3) of this section.   a) Employees work in a store equipped with only one exit exposed to a fire hazard, on or about 06/27/13.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.37 B02

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.37(b)(2): Each exit was not clearly visible and marked by a sign reading "Exit."  a) Employees work in a store equipped with only one exit which is not identified as such exposing them to a fire hazard, on or about 06/27/13.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.141 A05

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.141(a)(5): Every enclosed workplace was not constructed, equipped, and maintained, so far as reasonably practicable, to prevent the entrance or harborage of rodents, insects, and other vermin.   a) Employees are exposed to rats and rat feces in the work area, on or about 06/27/13.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.303 B02

Serious Gravity 1 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.303(b)(2): Listed or labeled equipment was not installed and used in accordance with any instructions included in the listing or labeling.   a) Under the front desk two(2) relocatable power taps were daisey-chained creating a fire hazard, on or about 06/27/13.   b) On the back wall powering the neon signs there are two(2) relocatable power taps daisey-chained creating a fire hazard, on or about 06/27/13.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.303 G02 I

Serious Gravity 10 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.303(g)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures:    a) In the basement there is an electrical panel with exposed bus bars and breakers exposing the employees to an electrical hazard, on or about 06/27/13.   b) In the basement there are fluorescent lights with no covers within 6 feet 5 inches of the floor exposing employees to electrical hazards, on or about 06/27/13.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1910.305 B01 II

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed:  a) An electrical box has missing knock outs where employees plug in an extension cord to power an overhead light, on or about 06/27/13.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.305 B02 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(b)(2)(i): In completed installations, each outlet box did not have a cover, faceplate, or fixture canopy:  a) On the main floor behind the chocolate cooler there is an electrical switch with no cover exposing the employees to an electrical hazard, on or about 06/27/13.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.305 G01 IV A

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure  a) The stairs going to the basement have an extension cord running down them creating a tripping hazard, on or about 06/27/13.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1910.141 D02 IV

Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.141(d)(2)(iv): Individual hand towels or sections thereof, of cloth or paper, air blowers or clean individual sections of continuous cloth toweling, convenient to the lavatories, were not provided.   a) In the restroom which employees use there is no towel or way to dry hands after washing, on or about 06/27/13.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.