OSHA Inspection: POTOMAC WATERPROOFING INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of POTOMAC WATERPROOFING INC. in 65 MASSACHUSETTS AVE, WASHINGTON, DC 20001 (NAICS 624221). OSHA activity number 339219370.

Watch Potomac Waterproofing INC. — free Get an email when a new federal OSHA severe-injury report for Potomac Waterproofing INC. is published. One employer, no account, unsubscribe in one click.
Site address
65 MASSACHUSETTS AVE
City
WASHINGTON
State
DC
ZIP
20001
Mailing
8195-B EUCLID CT, MANASSAS PARK, VA 20111
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
624221
Employees
28
Ownership type
A

2 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $2625.00 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)   a) Front Right Side of Structure - Employee working from scaffolding equipped with only one plank as a platform was priming and installing an air barrier on or about 7/18/2013.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2625
  • — Z (S) $3500

1926.451 G01 VII

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3500.00 · Current $2625.00 Reduced
29 CFR 1926.451(g)(1)(vii): For all scaffolds not specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee was not protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.   a) Front Right Side of Structure- Employee working from top level of scaffolding installing an air barrier to the structure not protected from falling 35' to the concrete below, on or about 7/18/2013.   Abatement certification required within 10 days after abatement date. The certification shall include a stateementment that abatement is complete, date and method of abatement, and method of abatement, and states employees and their representives were informed of this abatement.
Recent events (2)
  • — I (S) $2625
  • — Z (S) $3500

View POTOMAC WATERPROOFING INC.'s full OSHA safety record →