OSHA Inspection: POTOMAC WATERPROOFING INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of POTOMAC WATERPROOFING INC. in 65 MASSACHUSETTS AVE, WASHINGTON, DC 20001 (NAICS 624221). OSHA activity number 339219370.
Where did this inspection happen?
- Establishment
- POTOMAC WATERPROOFING INC.
- Site address
- 65 MASSACHUSETTS AVE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20001
- Mailing
- 8195-B EUCLID CT, MANASSAS PARK, VA 20111
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 624221
- Employees
- 28
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $3500.00 · Current $2625.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Front Right Side of Structure - Employee working from scaffolding equipped with only one plank as a platform was priming and installing an air barrier on or about 7/18/2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2625
- — Z (S) $3500
1926.451 G01 VII
- Issued
- Abate by
- Penalty
- Initial $3500.00 · Current $2625.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vii): For all scaffolds not specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee was not protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) Front Right Side of Structure- Employee working from top level of scaffolding installing an air barrier to the structure not protected from falling 35' to the concrete below, on or about 7/18/2013. Abatement certification required within 10 days after abatement date. The certification shall include a stateementment that abatement is complete, date and method of abatement, and method of abatement, and states employees and their representives were informed of this abatement.
Recent events (2)
- — I (S) $2625
- — Z (S) $3500
More inspections at POTOMAC WATERPROOFING INC.
ANNAPOLIS, MD—2012-10-25 00:00:00
POTOMAC WATERPROOFING INC
View POTOMAC WATERPROOFING INC.'s full OSHA safety record →
More inspections in this industry (NAICS 624221)
LAKEPORT, CA—2026-06-24
REDWOOD COMMUNITY SERVICES
PORTLAND, OR—2026-06-01
317744287 - TRANSITION PROJECTS INC
GRANTS PASS, OR—2026-04-28
317743978 - GRANDMA'S HAVEN LLC
LOS ANGELES, CA—2026-04-24
WEINGART
PORTLAND, OR—2026-03-27
317743507 - URBAN ALCHEMY
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339219370.