WASHINGTON, DC —
OSHA Inspection: MARQUEZ BRICK WORKS
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MARQUEZ BRICK WORKS in 9939 M STREET NW, WASHINGTON, DC 20009 (NAICS 238140). OSHA activity number 339240756.
Where did this inspection happen?
- Establishment
- MARQUEZ BRICK WORKS
- Site address
- 9939 M STREET NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20009
- Mailing
- 8802 JENNA CT, LANHAM, MD 20706
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 12
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.451 B01
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) On July 31, 2013 and at times prior thereto; Rear of building, employees were observed on the working on the second platform from the top of a scaffold system that was not fully planked, missing several planks; the height from the work platform to ground level was 30-40 feet. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.451 C01
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1926.451(c)(1): Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) were not restrained from tipping by guying, tying, bracing, or equivalent means, as set forth in subparagraphs (i) - (iii) of this paragraph: a) On July 31, 2013 and at times prior thereto; northside of building; employees were exposed to a 30-40 foot fall while working on a scaffold system that was not secured to the building to prevent it from falling/moving. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.451 E01
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Cross-braces were used as a means of access: a) On July 31, 2013 and at times prior thereto; northside of building, employees were exposed to a fall of approximately 40 feet when accessing the scaffold system by climbing the cross bracing and scaffold structure. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.451 E09 IV
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(e)(9)(iv): Cross braces on tubular welded frame scaffolds were used as a means of access or egress: a) On July 31, 2013 and at times prior thereto; northside of building, employees were observed climbing the cross braces of the scaffold system exposing themselves to a 30-35 foot fall. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01 VI
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vi): Each employee performing overhand bricklaying operations from a supported scaffold was not protected from falling from all open sides and ends of the scaffold (except at the side next to the wall being laid) by the use of a personal fall arrest system or guardrail system (with minimum 200 pound top-rail capacity): a) On July 31, 2013 and at times prior thereto; northside of building; employees working on a scaffold system installing brick veneer were exposed to a 30-40 foot fall at the ends of the working platform. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.451 G04 III
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(g)(4)(iii): When mid-rails, screens, mesh, intermediate vertical members, solid panels, or equivalent structural members are used, they were not installed between the top edge of the guardrail system and the scaffold platform. On July 31, 2013 and at times prior thereto; northside of building; employees were exposed to a fall hazard of 30 feet while conducting their assigned duties on the working platform of the scaffold; missing mid-rails. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.501 B03
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $1400.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(3): Each employee in a hoist area was not protected from falling 6 feet (1.8 m) or more to lower levels by guardrail systems or personal fall arrest systems: a) On July 31, 2013 and at times prior thereto; Eastside of building, employee using a hoist to bring materials onto the working platform of the scaffold did not have a personal fall arrest system to protect him from falling 30 feet to the ground. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
More inspections in this industry (NAICS 238140)
RENO, NV—2026-07-16
DC MASONRY
WINNETKA, IL—2026-07-15
CHICAGO STUCCO CO.
LODI, NJ—2026-07-15
J & O MASONRY CONTRACTORS
DORAVILLE, GA—2026-07-14
SUDLOW CONCRETE, INC.
FLAGLER BEACH, FL—2026-07-14
PLANET DESIGN SERVICES, INC.
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339240756.