Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: MARQUEZ BRICK WORKS

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MARQUEZ BRICK WORKS in 9939 M STREET NW, WASHINGTON, DC 20009 (NAICS 238140). OSHA activity number 339240756.

Watch Marquez Brick Works — free Get an email when a new federal OSHA severe-injury report for Marquez Brick Works is published. One employer, no account, unsubscribe in one click.
Establishment
MARQUEZ BRICK WORKS
Site address
9939 M STREET NW
City
WASHINGTON
State
DC
ZIP
20009
Mailing
8802 JENNA CT, LANHAM, MD 20706
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
12
Ownership type
A

7 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):    a) On July 31, 2013 and at times prior thereto; Rear of building, employees were observed on the working on the second platform from the top of a scaffold system that was not fully planked, missing several planks; the height from the work platform to ground level was 30-40 feet.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 C01

Serious Gravity 10 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(c)(1): Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) were not restrained from tipping by guying, tying, bracing, or equivalent means, as set forth in subparagraphs (i) - (iii) of this paragraph:   a)  On July 31, 2013 and at times prior thereto; northside of building; employees were exposed to a 30-40 foot fall while working on a scaffold system that was not secured to the building to prevent it from falling/moving.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 E01

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross-braces were used as a means of access:   a) On July 31, 2013 and at times prior thereto; northside of building, employees were exposed to a fall of approximately 40 feet when accessing the scaffold system by climbing the cross bracing and scaffold structure.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 E09 IV

Serious Gravity 10 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(e)(9)(iv): Cross braces on tubular welded frame scaffolds were used as a means of access or egress:   a) On July 31, 2013 and at times prior thereto; northside of building, employees were observed climbing the cross braces of the scaffold system exposing themselves to a 30-35 foot fall.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VI

Serious Gravity 10 2 instances 5 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.451(g)(1)(vi): Each employee performing overhand bricklaying operations from a supported scaffold was not protected from falling from all open sides and ends of the scaffold (except at the side next to the wall being laid) by the use of a personal fall arrest system or guardrail system (with minimum 200 pound top-rail capacity):   a) On July 31, 2013 and at times prior thereto; northside of building; employees working on a scaffold system installing brick veneer were exposed to a 30-40 foot fall at the ends of the working platform.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 G04 III

Serious Gravity 10 8 instances 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(g)(4)(iii): When mid-rails, screens, mesh, intermediate vertical members, solid panels, or equivalent structural members are used, they were not installed between the top edge of the guardrail system and the scaffold platform.    On July 31, 2013 and at times prior thereto; northside of building; employees were exposed to a fall hazard of 30 feet while conducting their assigned duties on the working platform of the scaffold; missing mid-rails.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.501 B03

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1400.00 Reduced
29 CFR 1926.501(b)(3): Each employee in a hoist area was not protected from falling 6 feet (1.8 m) or more to lower levels by guardrail systems or personal fall arrest systems:   a) On July 31, 2013 and at times prior thereto; Eastside of building, employee using a hoist to bring materials onto the working platform of the scaffold did not have a personal fall arrest system to protect him from falling 30 feet to the ground.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

MACY'S

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339240756.