Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,214Inspections Most recent open 2026-07-16 Last loaded 2026-07-20

OSHA Inspection: WINDOW NATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WINDOW NATION in 1329 JEFFERSON ST., NW, WASHINGTON, DC 20009 (NAICS 236118). OSHA activity number 339356503.

Watch Window Nation — free Get an email when a new federal OSHA severe-injury report for Window Nation is published. One employer, no account, unsubscribe in one click.
Establishment
WINDOW NATION
Site address
1329 JEFFERSON ST., NW
City
WASHINGTON
State
DC
ZIP
20009
Mailing
8198 TERMINAL. RD., #105, LORTON, VA 22079
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
2
Ownership type
A

5 citations on file for this inspection.

1926.304 F

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $0.00 Reduced
29 CFR 1926.304(f): Other requirements. All woodworking tools and machinery shall meet other applicable requirements of American National Standards Institute, 01.1-1961, Safety Code for Woodworking Machinery:      a)      Front Yard - On or about 08/02/2013, Employees  were exposed to amputation hazards from use a portable table saw that was missing the following requirements:        - Hood with which to protect a carpenter from accidentally contacting the saws rotating blade while ripping wood trim, which is a requirement of the American National Standards Institute, 01.-1961, Safety Code for Woodworking Machinery, Section 4.1.2(a).     - Spreader with which to protect carpenters wood  trim and other materials fed into the saw from binding and being ejected, which is a requirement of the American National Standards Institute, 01.-1961, Safety Code for Woodworking Machinery, Section 4.1.2(b).     - A restart switch that would prevent the saw from unexpectedly restarting after a temporary interruption of power, which is a requirement of the American National Standards Institute, 01.-1961, Safety Code for Woodworking Machinery, Section 3.1.3(c).     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2000

1926.451 G01

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $0.00 Reduced
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:   Front Yard - On or about 08/02/2013, a carpenter on the platform of a ladder jack scaffold was not provided with fall protection and exposed to a 16 foot fall to the ground below.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2800

1926.501 B13

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $0.00 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):    a)  Front Yard, Roof - On or about 08/02/2013, two carpenter whom were crossing a low-sloped roof in order to reach their work area were exposed to a 11 foot fall and had not been provided with fall protection.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $1600

1926.1053 B01

Deleted Serious Gravity 1 1 instance 2 exposed
Issued
Penalty
Initial $1200.00 · Current $0.00 Reduced
29 CFR 1926.1053(b)(1): Where (a) portable ladder(s) was/were used for access to an upper level landing surface and the ladder's length did not allow the ladder side rails to extend at least 3 feet (0.9 m) above the upper landing surface being accessed, the ladder was not secured at its top to a rigid support that will not deflect, and/or a grasping device was not provided to assist employees in mounting and dismounting the ladder:     a)  Front Yard - On or about 08/02/2013, Two carpenters were exposed to an 11 foot fall from the top of an aluminum extension ladder which was not secured in place and provided with a grab rail and only extended 18 inches above the ladder landing.
Recent events (2)
  • — I (S) $0
  • — Z (S) $1200

1926.404 B01 I

Deleted Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites:   a)  Front Yard - On or about 08/02/2013, two carpenters were exposed to a 120 volt electrical shock hazard while using a portable table saw which was not provided with either assured equipment grounding conductor program or ground fault circuit interrupter circuitry.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

MACY'S

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339356503.