STATE COLLEGE, PA —
OSHA Inspection: CENTRAL PENN RENOVATIONS 'N ROOFING
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of CENTRAL PENN RENOVATIONS 'N ROOFING in 430 - 432 EAST COLLEGE AVENUE, STATE COLLEGE, PA 16801 (NAICS 238160). OSHA activity number 339393902.
Where did this inspection happen?
- Establishment
- CENTRAL PENN RENOVATIONS 'N ROOFING
- Site address
- 430 - 432 EAST COLLEGE AVENUE
- City
- STATE COLLEGE
- State
- PA
- ZIP
- 16801
- Mailing
- 601 WOODS AVENUE, LOCK HAVEN, PA 17745
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 5
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.501 B04 II
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $1600.00
General-duty citation text
29 CFR 1926.501(b)(4)(ii): Each employee on a walking/working surface was not protected from tripping in or stepping into or through holes (including skylights) by covers: (a) East College Avenue, State College Pennsylvania - Three skylights on the roof of the building were not covered and employees were exposed to the hazard of tripping or stepping into them when they walked back and forth between the access point at the back of the building and the work area at the front of the building on or about September 5, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $1600
1926.501 B10
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $2000.00
General-duty citation text
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. (a) East College Avenue, State College, Pennsylvania - The employer did not provide an authorized fall protection system for the employees performing roofing work on the low slope roof. Employees were exposed to a fall of 20 feet from the eave to the concrete sidewalk below on or about September 5, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- — Z (S) $2000
1926.503 A01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: (a) East college Avenue, State College Pennsylvania - Employees worked on a low slope roof to replace the roofing material and were not trained to recognize the fall hazards and authorized methods of fall protection. The employees were exposed to a fall of approximately 20 feet from the eave to the concrete sidewalk in the front of the building on or about September 5, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1926.502 F01
- Issued
- Penalty
- Initial $2000.00 · Current $2000.00
General-duty citation text
29 CFR 1926.502(f)(1): Warning lines were not erected around all sides of the roof work area: (a) East College Avenue, State College, Pennsylvania - The employer did not ensure that the warning line was erected around all sides of the roof work area. Employees were exposed to the hazard of falling from the rake edge and rear eve edge of the building on or about September 5, 2013. No abatement certification or documentation required.
Recent events (1)
- — Z (S) $2000
1926.502 F01 III
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.502(f)(1)(iii): Points of access, material handling areas, storage areas, and/or hoisting areas were not connected to the work area by an access path formed by two warning lines: (a) East College Avenue, State College, Pennsylvania - The employer did not ensure that the point of access was connected to the work area by an access path formed by two warning lines. Employees walked approximately 300 feet from the ladder on East Calder Way, at the back of the building to the work area on the front of the building on or about September 5, 2013. No abatement certification or documentation required.
Recent events (1)
- — Z (S) $0
1926.1053 B01
- Issued
- Penalty
- Initial $1200.00 · Current $1200.00
General-duty citation text
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access: (a) East Calder Way, State College, Pennsylvania - The employer did not ensure that the portable ladder used by employees to access the roof was extended at least three feet above the upper landing surface on or about September 5, 2013. No abatement certification or documentation required.
Recent events (1)
- — Z (S) $1200
1926.1053 B04
- Issued
- Abate by
- Penalty
- Initial $1200.00 · Current $1200.00
General-duty citation text
29 CFR 1926.1053(b)(4): Ladders were used for purposes other than the purposes for which they were designed: (a) State College, Pennsylvania - The employer allowed employees to use a step ladder in the folded position to climb from the roof of the beer distributor business at 107 Sowers Street to the roof of the video game store at 421 East Calder Way to access the work area on or about September 5, 2013. (b) State College, Pennsylvania - The employer allowed employees to use a step ladder in the folded position to climb from the roof of the video game store at 421 East Calder Way to the roof of the night club at 420 East College Avenue to access the work area on or about September 5, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $1200
1926.1053 B20
- Issued
- Abate by
- Penalty
- Initial $1200.00 · Current $1200.00
General-duty citation text
29 CFR 1926.1053(b)(20): Employees did not face the ladder when ascending or descending the ladder: (a) East Calder Way, State College, Pennsylvania - The employer did not ensure that employees faced the ladder when descending from the roof of the building. The employee was exposed to a fall of 13 feet to the concrete pavement below on or about September 5, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $1200
More inspections in this industry (NAICS 238160)
FAIRVIEW, TN—2026-07-16
MARVIN PINERA
CARSON CITY, NV—2026-07-16
UNKNOWN/INVALID ESTABLISHMENT
BANNOCKBURN, IL—2026-07-16
ROOFING H.P. LLC
LOXLEY, AL—2026-07-16
CARLOS CHE
BALTIMORE, MD—2026-07-16
VAL CONSTRUCTION INC
More inspections in PA
PHILADELPHIA, PA—2026-07-16
URUS CONSTRUCTION CORPORATION
JEFFERSON HILLS, PA—2026-07-16
MARATHON PETROLEUM COMPANY ASPHALT TERMINAL
SMITHFIELD, PA—2026-07-16
CARLISLE CONSTRUCTION MATERIALS
PITTSBURGH, PA—2026-07-15
DREAM GREENER LAWN & LANDSCAPE
COCHRANTON, PA—2026-07-15
CRAWFORD COUNTY HARDWOODS, LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339393902.