WASHINGTON, DC —
OSHA Inspection: DOVOL CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DOVOL CONSTRUCTION in 1443 CHAPIN STREET, NW, WASHINGTON, DC 20005 (NAICS 238140). OSHA activity number 339462764.
Where did this inspection happen?
- Establishment
- DOVOL CONSTRUCTION
- Site address
- 1443 CHAPIN STREET, NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20005
- Mailing
- 3603 40TH AVENUE, BRENTWOOD, MD 20722
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 10
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.451 E01
- Issued
- Penalty
- Initial $1200.00 · Current $756.00 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Cross-braces were used as a means of access. a) West Side of the Site - Two masons were observed on a tubular welded frame scaffold without a ladder for access exposing them to a 13 foot fall hazard, on or about 10/21/13.
Recent events (2)
- — I (S) $756
- — Z (S) $1200
1926.451 G01
- Issued
- Penalty
- Initial $1600.00 · Current $1008.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a) West Side of the Site - Two masons were observed on a tubular welded frame scaffold without fall protection exposing them to a 13 foot fall hazard, on or about 10/21/13.
Recent events (2)
- — I (S) $1008
- — Z (S) $1600
1926.501 B03
- Issued
- Penalty
- Initial $1600.00 · Current $1008.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(3): Each employee in a hoist area was not protected from falling 6 feet (1.8m) or more to lower levels by guardrail systems or personal fall arrest systems: a) West Side of the Site - A mason was observed using a wheel hoist on a scaffold where fall protection was not provided exposing him to a 13 foot fall hazard, on or about 10/21/13.
Recent events (2)
- — I (S) $1008
- — Z (S) $1600
More inspections in this industry (NAICS 238140)
MARIANNA, FL—2026-07-13
PRIMETIME MOBILE MASONRY LLC
LOMPOC, CA—2026-07-10
UNKNOWN EMPLOYER
FREEHOLD, NJ—2026-07-10
CRAIG'S MASONRY & HARDSCAPE LLC
CINCINNATI, OH—2026-07-09
ALL AMERICAN CONCRETE LLC
NEW YORK, NY—2026-07-08
JEY CONSTRUCTIONS WORKS CORP
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339462764.