FOLSOM, PA —
OSHA Inspection: CGR CONSTRUCTION, INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of CGR CONSTRUCTION, INC. in 216 MACDADE BLVD, FOLSOM, PA 19033 (NAICS 236220). OSHA activity number 339508897.
Where did this inspection happen?
- Establishment
- CGR CONSTRUCTION, INC.
- Site address
- 216 MACDADE BLVD
- City
- FOLSOM
- State
- PA
- ZIP
- 19033
- Mailing
- PO BOX 117, MOHNTON, PA 19540
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 7
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.153 G
- Issued
- Penalty
- Initial $1700.00 · Current $1275.00 Reduced
General-duty citation text
29 CFR 1926.153(g): Liquefied petroleum gas (LP-Gas) containers installed outside of buildings or structures were not upon a firm foundation or otherwise firmly secured: a) 216 MacDade Blvd, Folsom, PA - The 10 - 100 pound liquid petroleum gas containers were not on a firm foundation or secured, thus exposing the employees to a possible fire/explosion hazard. This violation was observed on or about December 4, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1275
- — Z (S) $1700
1926.153 L
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.153(l): LP-Gas storage locations were not provided with at least one approved portable fire extinguisher having a rating of not less than 20B:C: a) 216 MacDade Blvd, Folsom, PA At each of the 4 storage locations of the 10 - 100 pound liquid petroleum gas containers there was not one approved portable fire extinguisher present having a rating of not less than 20 B:C. This violation exposed the employees to a fire hazard. This violation was observed on or about December 4, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.153 O
- Issued
- Penalty
- Initial $2800.00 · Current $2100.00 Reduced
General-duty citation text
29 CFR 1926.153(o): When damage to LP-Gas systems from vehicular traffic was a possibility, precautions against such damage were not taken: a) 216 MacDade Blvd, Folsom, PA At each of the 4 storage locations of the 10 - 100 pound liquid petroleum gas containers there was no precautions taken from possible vehicular damage. This violation exposed the employees to a fire/explosion hazard. This violation was observed on or about December 4, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $2100
- — Z (S) $2800
1926.20 B01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.20(b)(1): The employer did not initiate and maintain accident prevention programs as necessary to comply with this part: a) 216 MacDade Blvd, Folsom, PA - The company does not maintain a safety and health program, thus exposing the employees to workplace hazards. This violation was observed on or about December 4, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 236220)
IRVINE, CA—2026-07-13
SNEARY CONSTRUCTION, INC.
IRVINE, CA—2026-07-13
KUKBO DESIGN USA LLC
SIOUX FALLS, SD—2026-07-13
REM CONSTRUCTION SERVICES, LLC
INDIAN ROCKS BEACH, FL—2026-07-10
UNKNOWN CONTRACTOR
SIOUX FALLS, SD—2026-07-10
HENRY CARLSON COMPANY
More inspections in PA
MILTON, PA—2026-07-10
HOMETOWN FOODS CHEF BOYARDEE CO.
SUNBURY, PA—2026-07-10
DEMPSEY UNIFORM & LINEN SUPPLY, INC
LANDISVILLE, PA—2026-07-10
FAIRVIEW DEMOLITION LLC
YORK, PA—2026-07-10