FORT LAUDERDALE, FL —
OSHA Inspection: V & M ERECTORS, INC.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of V & M ERECTORS, INC. in THE "NEW RIVER BRIDGE" ON INTERSTATE I-95, BETWEEN SR 84 AND DAVIE BOULEVARD, FORT LAUDERDALE, FL 33315 (NAICS 237310). OSHA activity number 339596512.
Where did this inspection happen?
- Establishment
- V & M ERECTORS, INC.
- Site address
- THE "NEW RIVER BRIDGE" ON INTERSTATE I-95, BETWEEN SR 84 AND DAVIE BOULEVARD
- City
- FORT LAUDERDALE
- State
- FL
- ZIP
- 33315
- Mailing
- 21005 TAFT STREET, PEMBROKE PINES, FL 33024
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237310
- Employees
- 57
- Ownership type
- A
Citations
10 citations on file for this inspection.
5(a)(1)
- Issued
- Penalty
- Initial $6300.00 · Current $6000.00 Reduced
General-duty citation text
OSH ACT of 1970 Section (5)(a)(1): OSH ACT of 1970 Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: fall hazards. a. On or about February 10, 2014, at the above addressed jobsite, employees were using a job-made Personal Fall Arrest System (PFAS), while working/riding on a material hoist, for which the arresting component of the system was designed by the equipment manufacturer to be utilized as a tower-ladder climbing safety sleeve device and not a personal fall arrest system rope grab device, therefore exposing the employees to fall hazards of approximately 60 feet.
Recent events (3)
- — R (S) $6000
- — C (S) $6300
- — Z (S) $6300
1926.451 D16
- Issued
- Penalty
- Initial $6300.00 · Current $6000.00 Reduced
General-duty citation text
29 CFR 1926.451(d)(16): The suspension scaffold power-operated hoist or manually operated hoist did not have, in addition to the normal operating brake, a braking device or locking pawl which engages automatically when a hoist makes either of the following uncontrolled movements: an instantaneous change in momentum or an accelerated overspeed. a. On or about February 10, 2014, at the above addressed jobsite, employees were using a suspended scaffold, which utilized four automotive drum type cable-winches for ascent/descent, and for which the winching motors did not have a required braking device or locking pawl.
Recent events (3)
- — R (S) $6000
- — C (S) $6300
- — Z (S) $6300
1926.451 D13
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.451(d)(13): Suspension scaffold power-operated hoists and manual hoists were not tested by a qualified testing laboratory: a . On or about February 10, 2014, at the above addressed jobsite, employees were using a suspended scaffold, which utilized four automotive type cable-winches for ascent/descent, and for which the winching motors were not tested by a qualified testing laboratory.
Recent events (3)
- — R (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 F03
- Issued
- Penalty
- Initial $6300.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a. On or about February 10, 2014, at the above addressed jobsite, employees were observed operating a suspension scaffold which had not been inspected for visible defects by a competent person before each work shift, and for which the scaffold system was observed to have several safety deficiencies, such as but not limited to; winching motors were not tested by a qualified testing laboratory, the winching motors did not have a required braking device or locking pawl, using incompatible components for a PFAS; such as a tower-ladder climbing safety sleeves in lieu of a rope grab, and the ends of the four vertical lifelines were inside the scaffold during the ascent/descent.
Recent events (3)
- — R (S) $0
- — C (S) $6300
- — Z (S) $6300
1926.20 B02
- Issued
- Penalty
- Initial $0.00 · Current $6000.00
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. a. On or about February 10, 2014, at the above addressed jobsite, employees were observed operating a suspension scaffold which had been erected, moved, dismantled and altered, while not under the supervision and direction of a competent person, and for which the scaffold system was observed to have several safety deficiencies, such as but not limited to; winching motors were not tested by a qualified testing laboratory, the winching motors did not have a required braking device or locking pawl, using incompatible components for a PFAS; such as a tower-ladder climbing safety sleeves in lieu of a rope grab, and the ends of the four vertical lifelines were inside the scaffold during the ascent/descent.
Recent events (3)
- — R (S) $6000
- — C (S) $0
- — Z (S) $0
1926.502 D11
- Issued
- Penalty
- Initial $3500.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1926.502(d)(11): Lifelines were not protected against being cut or abraded: a. On or about February 10, 2014, at the above addressed jobsite, employees were using vertical lifelines, while working/riding on a material hoist, for which the lifelines were wrapped (choked-back) around a steel beam, and for which the sharp edges of the beam were not padded/protected.
Recent events (3)
- — R (S) $0
- — C (S) $3500
- — Z (S) $3500
1926.552 A01
- Issued
- Penalty
- Initial $6300.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1926.552(a)(1): The employer did not comply with the manufacturer's specifications and limitations applicable to the operation of all hoists and elevators: a. On or about February 10, 2014, at the above addressed jobsite, employees were working/riding on a material hoist, for which the engineers design specification/limitations prohibited personnel from occupying the hoist, and specified only the remote operation of the hoist.
Recent events (3)
- — R (S) $0
- — C (S) $6300
- — Z (S) $6300
1926.552 A02
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.552(a)(2): Rated load capacities, recommended operating speeds, and special hazard warnings or instructions were not posted on cars and platforms: a. On or about February 10, 2014, at the above addressed jobsite, employees were working/riding on a material hoist, for which the engineers design specification/limitations prohibited personnel from occupying the hoist, and specified only the remote operation of the hoist, and for which these special hazard warning/instructions were not posted on the hoist.
Recent events (3)
- — R (S) $0
- — C (S) $0
- — Z (S) $0
1926.552 B01 II
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.552(b)(1)(ii): Person(s) were allowed to ride on material hoists for purposes other than inspection and maintenance: a. On or about February 10, 2014, at the above addressed jobsite, employees were working/riding on a material hoist, to install new components to the underside of an existing interstate bridge.
Recent events (3)
- — R (S) $0
- — C (S) $0
- — Z (S) $0
1926.553 A01
- Issued
- Penalty
- Initial $3500.00 · Current $3700.00
General-duty citation text
29 CFR 1926.553(a)(1): Exposed moving parts which constituted a hazard on base-mounted drum hoist(s) were not guarded: a. On or about February 10, 2014, at the above addressed jobsite, employees were operating a suspended scaffold, which utilized four automotive type drum-cable winches for ascent/descent, and for which the employees were hand-feeding/guiding the cable onto the drum during ascent/descent, and for which the winching motors exposed moving parts were not guarded.
Recent events (3)
- — R (S) $3700
- — C (S) $3500
- — Z (S) $3500
More inspections at V & M ERECTORS, INC.
ORLANDO, FL—2021-09-21 00:00:00
V&M ERECTORS, INC.
ORLANDO, FL—2019-09-28 00:00:00
V&M ERECTORS, INC.
MIAMI, FL—2009-11-06 00:00:00
V & M ERECTORS, INC.
POMPANO BEACH, FL—2008-07-30 00:00:00
V&M ERECTORS, INC.
JACKSONVILLE, FL—2003-03-20 00:00:00
V & M ERECTORS, INC.
View V & M ERECTORS, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 237310)
DEERFIELD, IL—2026-07-16
JOHN BURNS CONSTRUCTION COMPANY, LLC
MAYVILLE, NY—2026-07-16
MAYVILLE VILLAGE DPW
CONESUS, NY—2026-07-16
CONESUS TN HIGHWAY DEPT
BELLINGHAM, MA—2026-07-16
BELLINGHAM DEPARTMENT OF PUBLIC WORKS
REDDING, CA—2026-07-15
ALLEN GILL CONSTRUCTION INC
More inspections in FL
MARIANNA, FL—2026-07-16
BRANNON BROTHERS CONSTRUCTION, LLC
LAKELAND, FL—2026-07-16
SOUTHERN MILLING & LUMBER, INC.
OAKLAND PARK, FL—2026-07-16
PKB CABINETRY
LAKELAND, FL—2026-07-16
ELIJAH WHOLESALE, LLC.
TAMPA, FL—2026-07-16
VALENCIA WHOLESALE, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339596512.