OSHA Inspection: MORLAN ENTERPRISES, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MORLAN ENTERPRISES, INC. in 43078 ELK RUN ROAD, COOLVILLE, OH 45723 (NAICS 237130). OSHA activity number 339601437.

Watch Morlan Enterprises, INC. — free Get an email when a new federal OSHA severe-injury report for Morlan Enterprises, INC. is published. One employer, no account, unsubscribe in one click.
Site address
43078 ELK RUN ROAD
City
COOLVILLE
State
OH
ZIP
45723
Mailing
1 CHATEAU HILLS, PARKERSBURG, WV 26101
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237130
Employees
8
Ownership type
A

10 citations on file for this inspection.

1903.19 D01

Other-than-serious 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $400.00 · Current $400.00
29 CFR 1903.19(d)(1): The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required:  a.  The employer has failed to submit abatement certification and documentation within ten days of the abatement date, July 21, 2014, for a violation of 29 CFR 1926.28(a), issued as citation 1, item 1, and described as follows:   a.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, the employer did not require the employees to wear appropriate personal protective equipment, such as a full body harness with shock absorbing "Y" lanyards while working on a 195 foot monopole communication tower thereby, exposing the employees to a fall hazard.  b.  The employer has failed to submit abatement certification and documentation within ten days of the abatement date, July 21, 2014, for a violation of 29 CFR 1926.50(b), issued as citation 1, item 2, and described as follows:   On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, the employer did not make provisions for prompt medical attention in case of serious injury prior to the commencement of work.  c.  The employer has failed to submit abatement certification and documentation within ten days of the abatement date, July 17, 2014, for a violation of 29 CFR 1926.50(d)(1), issued as citation 1, item 3, and described as follows:   On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, employees did not have first aid supplies onsite, and were not easily accessible.  d.  The employer has failed to submit abatement certification and documentation within ten days of the abatement date, July 21, 2014, for a violation of 29 CFR 1926.95(d)(1), issued as citation 1, item 4, and described as follows:   On February 25, 2014, at the construction site located at 43078 Elk Run, Coolville, Ohio, two employees were working on 195 foot monopole communication tower were required to purchase their own full body safety harness to be used for fall protection.  e.  The employer has failed to submit abatement certification and documentation within ten days of the abatement date, July 21, 2014, for a violation of 29 CFR 1926.100(a), issued as citation 1, item 5, and described as follows:   On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, three employees were not protected from falling objects by protective helmets thereby, exposing employees to a head injury from impact.  f.  The employer has failed to submit abatement certification and documentation within ten days of the abatement date, July 21, 2014, for a violation of 29 CFR 1926.104(d), issued as citation 1, item 6, and described as follows:     On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, an employee was wearing a full body harness with a single makeshift lanyard made from a Lift-All Webmaster 1200, Type EE2  601D general purpose lifting sling attached to the back D-ring for fall protection while climbing and working on a 195 foot monopole communication tower. The sling had a label which indicated a vertical capacity of 2,400 lbs., therefore not meeting the 5,400 pound nominal breaking strength.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, an employee was wearing a full body harness with a single makeshift lanyard made from a Lift-All Webmaster 1600, Type EE2  801 general purpose lifting sling attached to the back D-ring for fall protection while climbing and working on a 195 foot monopole communication tower. The sling had a label which indicated a vertical capacity of 3,200 lbs., therefore not meeting the 5,400 pound nominal breaking strength.  g.  The employer has failed to submit abatement certification and documentation within ten days of the abatement date, July 21, 2014, for a violation of 29 CFR 1926.405(b)(2), issued as citation 1, item 7, and described as follows:  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, on the work truck, there was an electrical outlet, powered by a StatPower Prosine 1000 stand-alone inverter, that did not have a faceplate installed, exposing employees to an electrical hazard.  h.   The employer has failed to submit abatement certification and documentation within ten days of the abatement date, August 9, 2014, for a violation of 29 CFR 1926.503(a)(1), issued as citation 1, item 8, and described as follows:  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, the employer did not provide a training program for employees exposed to fall hazards while climbing a communication tower.  i.   The employer has failed to submit abatement certification and documentation within ten days of the abatement date, July 17, 2014, for a violation of 29 CFR 1926.501(b)(15), issued as citation 2, item 1, and described as follows:  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, two employees were ascending and descending a 195 foot monopole communication tower without the use of fall protection thereby, exposing the employees to a fall hazard.
Recent events (1)
  • — Z (O) $400

1926.28 A

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.28(a): The employer is responsible for requiring the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions or where this part indicates the need for using such equipment to reduce the hazards to the employees.    a.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, the employer did not require the employees to wear appropriate personal protective equipment, such as a full body harness with shock absorbing "Y" lanyards while working on a 195 foot monopole communication tower thereby, exposing the employees to a fall hazard.
Recent events (3)
  • — F (S) $2800
  • — C (S) $2800
  • — Z (S) $2800

1926.50 B

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.50(b): Provisions shall be made prior to commencement of the project for prompt medical attention in case of serious injury.    a.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, the employer did not make provisions for prompt medical attention in case of serious injury prior to the commencement of work.
Recent events (3)
  • — F (S) $2000
  • — C (S) $2000
  • — Z (S) $2000

1926.50 D01

Serious Gravity 1 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $1200.00
29 CFR 1926.50(d)(1): First aid supplies shall be easily accessible when required.    a.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, employees did not have first aid supplies onsite, and were not easily accessible.
Recent events (3)
  • — F (S) $1200
  • — C (S) $1200
  • — Z (S) $1200

1926.95 D01

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.95(d)(1): Except as provided by paragraphs (d)(2) through (d)(6) of this section, the protective equipment, including personal protective equipment (PPE), used to comply with this part, shall be provided by the employer at no cost to employees.    a.  On February 25, 2014, at the construction site located at 43078 Elk Run, Coolville, Ohio, two employees were working on 195 foot monopole communication tower were required to purchase their own full body safety harness to be used for fall protection.
Recent events (3)
  • — F (S) $2000
  • — C (S) $2000
  • — Z (S) $2000

1926.100 A

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.100(a): Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.    a.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, three employees were not protected from falling objects by protective helmets thereby, exposing employees to a head injury from impact.
Recent events (3)
  • — F (S) $2000
  • — C (S) $2000
  • — Z (S) $2000

1926.104 D

Serious Gravity 10 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.104(d): Safety belt lanyard shall be a minimum of 1/2-inch nylon, or equivalent, with a maximum length to provide for a fall of no greater than 6 feet. The rope shall have a nominal breaking strength of 5,400 pounds.    a.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, an employee was wearing a full body harness with a single makeshift lanyard made from a Lift-All Webmaster 1200, Type EE2  601D general purpose lifting sling attached to the back D-ring for fall protection while climbing and working on a 195 foot monopole communication tower. The sling had a label which indicated a vertical capacity of 2,400 lbs., therefore not meeting the 5,400 pound nominal breaking strength.    b.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, an employee was wearing a full body harness with a single makeshift lanyard made from a Lift-All Webmaster 1600, Type EE2  801 general purpose lifting sling attached to the back D-ring for fall protection while climbing and working on a 195 foot monopole communication tower. The sling had a label which indicated a vertical capacity of 3,200 lbs., therefore not meeting the 5,400 pound nominal breaking strength.
Recent events (3)
  • — F (S) $2800
  • — C (S) $2800
  • — Z (S) $2800

1926.405 B02

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $1600.00
29 CFR 1926.405(b)(2): Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.    a. On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, on the work truck, there was an electrical outlet, powered by a StatPower Prosine 1000 stand-alone inverter, that did not have a faceplate installed, exposing employees to an electrical hazard.
Recent events (3)
  • — F (S) $1600
  • — C (S) $1600
  • — Z (S) $1600

1926.503 A01

Serious Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $2800.00
29 CFR 1926.503(a)(1): The employer shall provide a training program for each employee who might be exposed to fall hazards. The program shall enable each employee to recognize the hazards of falling and shall train each employee in the procedures to be followed in order to minimize these hazards.    a.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, the employer did not provide a training program for employees exposed to fall hazards while climbing a communication tower.
Recent events (3)
  • — F (S) $2800
  • — C (S) $2800
  • — Z (S) $2800

1926.501 B15

Willful Gravity 10 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $35000.00 · Current $35000.00
29 CFR 1926.501(b)(15): "Walking/working surfaces not otherwise addressed." Except as provided in 1926.500(a)(2) or in 1926.501 (b)(1) through (b)(14), each employee on a walking/working surface 6 feet (1.8 m) or more above lower levels shall be protected from falling by a guardrail system, safety net system, or personal fall arrest system.    a.  On February 25, 2014, at the communication tower construction site located at 43078 Elk Run, Coolville, Ohio, two employees were ascending and descending a 195 foot monopole communication tower without the use of fall protection thereby, exposing the employees to a fall hazard.
Recent events (3)
  • — F (W) $35000
  • — C (W) $35000
  • — Z (W) $35000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339601437.