2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17
Safety Incidents OSHA Severe Injury Reports · 2015–2025

OSHA Inspection: PRIME TIME PAINTING & FINISHING, LLC

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of PRIME TIME PAINTING & FINISHING, LLC in 2831 WASHINGTON AVENUE, CLEARFIELD, PA 16830 (NAICS 238320). OSHA activity number 339630154.

Watch Prime Time Painting & Finishing, LLC — free Get an email when a new federal OSHA severe-injury report for Prime Time Painting & Finishing, LLC is published. One employer, no account, unsubscribe in one click.
Site address
2831 WASHINGTON AVENUE
City
CLEARFIELD
State
PA
ZIP
16830
Mailing
5467 GRANDVIEW AVENUE, ALTOONA, PA 16601
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238320
Employees
1
Ownership type
A

4 citations on file for this inspection.

1910.1200 E04

Serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $1200.00

Hazardous substances 1568M328

29 CFR 1910.1200(e)(4): The employer did not make the written hazard communication program available upon request to the Assistant Secretary and the Director in accordance with 29 CFR 1910.1020(e): (Construction Reference: 1926.59)  a.) Prime Time Painting & Finishing, LLC, 2831 Washington Avenue, Clearfield, PA- On or about March 6, 2014, the written Hazard Communication Program was not made available upon request to the Occupational Safety and Health Administration. Company employees worked with and around hazardous chemicals including, but not limited to, Kaolin and 2-(2-methoxyethoxy) ethanol.
Recent events (1)
  • — Z (S) $1200

1910.1200 G11

Serious Gravity 1 2 instances 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00

Hazardous substances 1568M328

29 CFR 1910.1200(g)(11): Material safety data sheets were not made available upon request to the designated representatives: (Construction Reference: 1926.59)   a.)  Prime Time Painting & Finishing, LLC, 2831 Washington Avenue, Clearfield, PA- On or about March 6, 2014, material safety data sheets (MSDSs) for Pitt-Tech Gloss Deep Rustic, Speedhide Zero INT/SG Neutral Base were not made available to the Occupational Safety and Health Administration. The material safety data sheets were not maintained at the worksite nor was there a method/procedure in place to ensure MSDSs could be provided to a designated representative requesting access to the document.
Recent events (1)
  • — Z (S) $0

1910.1200 H03 II

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00

Hazardous substances 1568M328

29 CFR 1910.1200(h)(3)(ii): Employee training did not include the physical and health hazards of the chemicals in the work area:   a) Prime Time Painting & Finishing, LLC, 2831 Washington Avenue, Clearfield, PA- employees work with and around various types of hazardous chemicals and substances including, but not limited to, Kaolin and 2-(2-methoxyethoxy) ethanol. The company had not provided employees with effective information and training on the physical and health hazards of the chemicals in the work area.
Recent events (1)
  • — Z (S) $0

1910.134 M04

Serious Gravity 1 3 instances 1 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $1200.00
29 CFR 1910.134(m)(4): Written materials required to be retained under 29 CFR 1910.134 were not made available upon request to affected employees and to the Assistant Secretary or designee for examination and copying:  (Construction Reference 1926.103)  a.) Prime Time Painting & Finishing, LLC - On or about, March 6, 2014, the written Respiratory Protection Program was not made available to the Occupational Safety and Health Administration for examination.     b.) Prime Time Painting & Finishing, LLC - On or about, March 6, 2014, Physician's Written Opinion for Respirator Use was not made available to the Occupational Safety and Health Administration for examination.     c.) Prime Time Painting & Finishing, LLC - On or about, March 6, 2014, Respirator Fit-testing Records were not made available to the Occupational Safety and Health Administration for examination.   On or about March 6, 2014, and dates prior thereto, the painter was required to wear an MSA brand, tight-fitting, air-purifying respirators during painting/coating operations.
Recent events (1)
  • — Z (S) $1200

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339630154.