WASHINGTON, DC —
OSHA Inspection: EXTERIOR REMODELING, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of EXTERIOR REMODELING, INC. in 1002 F STREET, NE, WASHINGTON, DC 20002 (NAICS 236118). OSHA activity number 339656795.
Where did this inspection happen?
- Establishment
- EXTERIOR REMODELING, INC.
- Site address
- 1002 F STREET, NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20002
- Mailing
- 4313 ASPEN HILL ROAD, ROCKVILLE, MD 20853
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 5
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.21 B02
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $900.00 Reduced
General-duty citation text
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: a) Job Site - Employees were not provided adequate training in the recognition of hazards as evidenced by employees not using personal protective equipment during a roof tear off operation, on or about 03/31/2014. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $900
- — Z (S) $1600
1926.102 A01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.102(a)(1): Employees were not provided with eye and face protection equipment when machines or operations present potential eye or face injury from physical, chemical, or radiation agents. a) Roof Level - Employees were observed tearing off an existing fiber-glass roofing membrane using hand tools, such as but not limited to shovels, digging bars, and hammers and not wearing eye protection, on or about 03/31/2014. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $2800.00 · Current $2000.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Roof Level - Employees were observed performing a roof tear off operation without using fall protection and exposed to a 24 foot fall hazard, on or about 03/31/2014. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $2000
- — Z (S) $2800
1926.503 A01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a) Roof Level - Employees were not provided with fall protection training as evidenced by a crew of roofers on a flat roof 24' above the ground not using fall protection, on or about 03/31/2014. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1053 B01
- Issued
- Abate by
- Penalty
- Initial $2000.00 · Current $1100.00 Reduced
General-duty citation text
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access: a) Exterior Front of Building - Employees were observed using a portable extension ladder to gain access to the roof that was 24 feet above the ground, and the ladder side rails extended only 16 inches above the landing, on or about 03/31/2014. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1100
- — Z (S) $2000
1926.1060 A
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.1060(a): The employer did not provide a training program for each employee using ladders and stairways, as necessary, which would enable each employee to recognize hazards related to ladders and stairways and train each employee in the procedures to be followed to minimize these hazards: a) Job Site - Employees were not provided training in the recognition of hazards associated with the use of portable ladders as evidenced by noted hazards such as but not limited to; the ladder's side rails extended only 16 inches above the landing and the top of the ladder was not properly secured, on or about 03/31/2014. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at EXTERIOR REMODELING, INC.
COLUMBIA, MD—2025-10-07
EXTERIOR REMODELING, INC.
COLUMBIA, MD—2025-07-25
EXTERIOR REMODELING, INC.
COLUMBIA, MD—2025-03-27
EXTERIOR REMODELING, INC.
ESSEX, MD—2023-11-20 00:00:00
EXTERIOR REMODELING, INC.
NOTTINGHAM, MD—2020-09-09 00:00:00
EXTERIOR REMODELING, INC.
View EXTERIOR REMODELING, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 236118)
CORTLANDT MANOR, NY—2026-07-13
RJW RENOVATIONS, LLC
VANCOUVER, WA—2026-07-08
WA317991978 - DLS CONTRACTING INC
NEWPORT BEACH, CA—2026-07-08
DRAKE SMITH CONSTRUCTION
BRIDGEVILLE, PA—2026-07-08
EXTREME DECKS
COLUMBUS, OH—2026-07-07
QUALITY BUILDS OHIO LLC
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339656795.