GLEN ROCK, NJ —
OSHA Inspection: PIEDRAS CONSTRUCTION CORP.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PIEDRAS CONSTRUCTION CORP. in 32 ALAN AVE, GLEN ROCK, NJ 07452 (NAICS 238140). OSHA activity number 339677015.
Where did this inspection happen?
- Establishment
- PIEDRAS CONSTRUCTION CORP.
- Site address
- 32 ALAN AVE
- City
- GLEN ROCK
- State
- NJ
- ZIP
- 07452
- Mailing
- 130 TICHENOR ST, NEWARK, NJ 07105
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 7
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.451 B01
- Issued
- Penalty
- Initial $1200.00 · Current $1200.00
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Front wall: Employee was working from a scaffold platform that was not fully planked being exposed to a fall of approximately 4 feet, on or about 4/9/14.
Recent events (1)
- — Z (S) $1200
1926.451 C02
- Issued
- Penalty
- Initial $1200.00 · Current $1200.00
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: a) Front wall: Employee was working from a scaffold platform that was not resting on base plates being exposed to a fall of approximately 4 feet, on or about 4/9/14.
Recent events (1)
- — Z (S) $1200
1926.452 C02
- Issued
- Penalty
- Initial $1200.00 · Current $1200.00
General-duty citation text
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a) Front wall: Employee was working from a scaffold platform that was not fully braced being exposed to a fall of approximately 4 feet, on or about 4/9/14.
Recent events (1)
- — Z (S) $1200
More inspections in this industry (NAICS 238140)
MARIANNA, FL—2026-07-13
PRIMETIME MOBILE MASONRY LLC
LOMPOC, CA—2026-07-10
UNKNOWN EMPLOYER
FREEHOLD, NJ—2026-07-10
CRAIG'S MASONRY & HARDSCAPE LLC
CINCINNATI, OH—2026-07-09
ALL AMERICAN CONCRETE LLC
NEW YORK, NY—2026-07-08
JEY CONSTRUCTIONS WORKS CORP
More inspections in NJ
FREEHOLD, NJ—2026-07-10
MARIO & SONS CONSTRUCTION GROUP, LLC
FREEHOLD, NJ—2026-07-10
VACCA ROOFING
FREEHOLD, NJ—2026-07-10
SPECTRA PAINTING, INC
FREEHOLD, NJ—2026-07-10
CRAIG'S MASONRY & HARDSCAPE LLC
FREEHOLD, NJ—2026-07-10
GTN CONSTRUCTION INC
Source