WASHINGTON, DC —
OSHA Inspection: P. J. MCTAVISH & COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of P. J. MCTAVISH & COMPANY in 933 EAST CAPITOL STREET, SE, WASHINGTON, DC 20007 (NAICS 238160). OSHA activity number 339765927.
Where did this inspection happen?
- Establishment
- P. J. MCTAVISH & COMPANY
- Site address
- 933 EAST CAPITOL STREET, SE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20007
- Mailing
- 4308 SANDY SPRINGS ROAD, BURTONSVILLE, MD 20866
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 5
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.95 A
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $928.00 Reduced
General-duty citation text
29 CFR 1926.95(a): Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, was not provided, used, or maintained in a sanitary and reliable condition wherever it was necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation, or physical contact: a) Roof - An employee was observed applying Calbar Shower-Proof Roofing paint with a paint brush and not wearing eye protection, on or about 05/13/2014. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $928
- — Z (S) $1600
1926.501 B13
- Issued
- Abate by
- Penalty
- Initial $2400.00 · Current $1392.00 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Roof - Employees were observed on a three tier flat roof applying Calbar Shower-Proof tin roof paint without using fall protection and exposed to a fall hazard of up to 16 feet, on or about 05/13/2014. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1392
- — Z (S) $2400
1926.1053 B01
- Issued
- Penalty
- Initial $2000.00 · Current $1100.00 Reduced
General-duty citation text
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: a) Roof - Employees were observed using a portable metal extension ladder 28 feet above the ground to gain access to the roof and the side rails only extended 18 inches above the upper landing surface, on or about 05/13/2014.
Recent events (2)
- — I (S) $1100
- — Z (S) $2000
1926.503 B01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer: a) Job Site - Fall protection training certification was not provided by the employer upon request, on or about 05/13/2014. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 238160)
SIOUX FALLS, SD—2026-07-13
H & R ROOFING OF SOUTH DAKOTA, INC.
HENDERSON, NV—2026-07-13
INTEGRITY ROOFING LLC
CORTLANDT MANOR, NY—2026-07-13
LG BUILDERS INC.
CAMDEN, OH—2026-07-13
ALBERTO MORALES
BLOOMINGTON, IL—2026-07-13
UNKNOWN CONTRACTOR
More inspections in DC
WASHINGTON, DC—2026-06-30
U.S. DEPARTMENT OF AGRICULTURE
WASHINGTON, DC—2026-06-16
MACY'S
WASHINGTON, DC—2026-06-02
RIGO MULTISERVICES
WASHINGTON, DC—2026-06-02
DDC CPL LLC
WASHINGTON, DC—2026-06-02
DDC CPL LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339765927.