Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: JOSE JARILLO

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JOSE JARILLO in 1 COLLEGE ST, YOUNG HARRIS, GA 30582 (NAICS 238140). OSHA activity number 339786410.

Watch Jose Jarillo — free Get an email when a new federal OSHA severe-injury report for Jose Jarillo is published. One employer, no account, unsubscribe in one click.
Establishment
JOSE JARILLO
Site address
1 COLLEGE ST
City
YOUNG HARRIS
State
GA
ZIP
30582
Mailing
180 WING MILL RD, ATLANTA, GA 30350
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
10
Ownership type
A

2 citations on file for this inspection.

1926.451 G01

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1680.00 Reduced
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:  On or about May 21, 2014:  a) Employees were exposed to fall hazards of approximately 17 feet while utilizing a scaffold system to preform rock masonry operations, when the employer failed to install fall protection measures for the employees utilizing the scaffold system.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

1926.452 C04

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $1200.00 Reduced
29 CFR 1926.452(c)(4): End frames of tubular welded frame scaffolding were not locked together vertically by use of pins or equivalent means in areas where uplift could occur:  On or about May 21,2014:  a) Employees were exposed to fall hazards of approximately 17 feet while utilizing a scaffold system that did not have stacking pins installed within the frames, where uplift could occurring from removing material from scaffold system with a rough terrain forklift.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339786410.