OSHA Inspection: PRODUCTION PLASTICS CORP. A DIV. OF E-S PLASTIC PRODUCTS LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of PRODUCTION PLASTICS CORP. A DIV. OF E-S PLASTIC PRODUCTS LLC in 400 PROGRESS DRIVE, SAUKVILLE, WI 53080 (NAICS 333220). OSHA activity number 339792012.

Watch Production Plastics Corp. A DIV. OF E-S Plastic Products LLC — free Get an email when a new federal OSHA severe-injury report for Production Plastics Corp. A DIV. OF E-S Plastic Products LLC is published. One employer, no account, unsubscribe in one click.
Site address
400 PROGRESS DRIVE
City
SAUKVILLE
State
WI
ZIP
53080
Mailing
400 PROGRESS DR., SAUKVILLE, WI 53080
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
333220
Employees
75
Ownership type
A

2 citations on file for this inspection.

1910.147 D

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $4900.00 · Current $3430.00 Reduced
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6):  (a)  Employees were exposed to amputation hazards while replacing the pressure switch on Press #11 (Cincinnati Plastic Injection Mold, Model #300T and Serial #4053A21/85-9) and the employer did not ensure that lockout/tagout was being utilized.
Recent events (2)
  • — I (S) $3430
  • — Z (S) $4900

1910.179 J02

Other-than-serious 1 instance 10 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.179(j)(2): The following items were not be inspected for defects at intervals as defined in paragraph (j)(1)(ii) of this section or as specifically indicated, including observation during operation for any defects which might appear between regular inspections:  (a)  Employees were working with the overhead crane and the employer did not ensure that frequent (monthly) crane inspections were being done on items such as the operating mechanisms, hooks, hoisting chains and the hydraulic system.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339792012.