GRIFFIN, GA —
OSHA Inspection: DORIC VAULT COMPANY/ DORIC OF CENTRAL GA VAULT COMPANY
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of DORIC VAULT COMPANY/ DORIC OF CENTRAL GA VAULT COMPANY in 1118 N HILL STREET, GRIFFIN, GA 30224 (NAICS 327390). OSHA activity number 339814519.
Where did this inspection happen?
- Site address
- 1118 N HILL STREET
- City
- GRIFFIN
- State
- GA
- ZIP
- 30224
- Mailing
- 1118 N HILL STREET, GRIFFIN, GA 30224
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 327390
- Employees
- 6
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.1200 E01
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $960.00 Reduced
General-duty citation text
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a)Throughout facility - The employer failed to provide a written hazard communication program to employees working with chemicals such as, but not limited to, Portland cement, EUCON WR 91, Metalink Vault Coating, and DUOGARD, exposing employees to eye injuries, chemical burns and lung disease.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1910.1200 G08
- Issued
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.1200(g)(8): The employer did not maintain copies of the required material safety data sheets for each hazardous chemical in the workplace: a) Throughout facility - The employer did not maintain a copy of the safety data sheet for Portland Cement to employees working with precast concrete burial vaults made of Portland cement. Employees were exposed to eye injuries, chemical burns and lung disease.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.1200 E01 I
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.1200(e)(1)(i): The written hazard communication program did not include a list of the hazardous chemicals known to be present, using an identity that was referenced on the appropriate material safety data sheet a)Throughout facility, the employer failed to provide a list of the chemicals present at the workplace for employees to use such as, but not limited to, Portland cement, EUCON WR 91, Metalink Vault Coating, and DUOGARD. Employees were exposed to skin and eye irritations, chemical burns, and lung disease.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 327390)
FLANDERS, NJ—2026-07-15
TRI-STATE QUIKRETE
KISSIMMEE, FL—2026-07-15
LAN SE, LLC
FRANKLINTON, NC—2026-07-15
161551 - LINDSAY PRECAST, LLC
OGDEN, UT—2026-07-10
OLDCASTLE INFRASTRUCTURE, INC.
CHARDON, OH—2026-07-09
JAB SUPPLY CORPORATION
More inspections in GA
GREENSBORO, GA—2026-07-16
PURE BEAUTY FARMS, INC.
FOREST PARK, GA—2026-07-16
POLYNT COMPOSITES USA INC.
AUGUSTA, GA—2026-07-16
GF CASTING SOLUTIONS AUGUSTA, LLC
CHAMBLEE, GA—2026-07-16
U.S. DEPARTMENT OF TREASURY
DECATUR, GA—2026-07-15
PALLETS ACQUISITION LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339814519.